Darwin Pozo

Darwin Pozo


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2024 in Engineering Proceedings
Verified
Conference Paper
Open access
PDF file
Juan David RamírezJuan David Ramírez
Juan David Ramírez
DPDarwin Pozo
Darwin Pozo
EDISON NOVOAEDISON NOVOA
EDISON NOVOA
JMJORGE LUIS MEDINA
JORGE LUIS MEDINA
WCWilliam Chamorro
William Chamorro
Alex ValenzuelaAlex Valenzuela
Alex Valenzuela
The High Voltage Laboratory (LABAV) at the Escuela Politécnica Nacional conducts dielectric tests on safety shoes in accordance with the ASTM F2412-18 standard. Additionally, as per the NTE INEN ISO 17025 standard, the laboratory must estimate the uncertainty of its measurements. Despite the scarcity of examples in the existing literature, this work provides a real-world example to assist other laboratories in replicating the uncertainty estimation process. In this article, we systematically present the calculation of leakage current uncertainty in shoes using both the traditional “Guide to the Expression of Uncertainty in Measurement” (GUM) method and the Monte Carlo method (MCM) for validation. The results from both approaches yield a similar uncertainty value of u = 0.0733 mA. Finally, we highlight the advantages that the MCM method offers in this context.