Dimitrios Kantianis

Prof. Dr. Dimitrios Kantianis

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2023 in European Project Management Journal
Verified
Journal Article
Closed access
DKDimitrios Kantianis
Dimitrios Kantianis
The research aims at developing an integrated mathematical spreadsheet modelling approach for the practical solution of the stochastic crashing problem in construction project planning. The proposed project crashing methodology is founded upon a synthesis of traditional PERT/CPM network scheduling, Monte Carlo simulation, and linear programming. The main contribution of the introduced model to the existing project management literature is that it produces frequency histograms and relevant statistics for optimum project crash make span and additional cost for project compression, by assuming uncertainty and correlation simultaneously for both normal and crash durations and direct expenses of project activities. The implementation of the model is automated in Microsoft Excel© through VBA coding. The research is anticipated to assist built environment academics and professionals to improve decision-making effectiveness in the planning of construction projects.

3 March 2026 in Urban Science
Verified
Journal Article
Open access
PDF file
DKDimitrios Kantianis
Dimitrios Kantianis
DTDimitrios Tsiotas
Dimitrios Tsiotas
Thomas KrabokoukisThomas Krabokoukis
Thomas Krabokoukis
Nowadays, the urban population is steadily increasing worldwide and, as a result, global construction output is expected to grow to more than 16 trillion EUR by 2030. This rapid urbanization has created a strong need for the successful selection and delivery of urban development projects to meet the challenges related to the provision of sustainable and resilient infrastructure, together with affordable residence solutions. Meanwhile, the dominance of the traditional capital budgeting discounted cash flow (DCF) technique has long been questioned for its inability to be effectively applied to the complex, uncertain, and turbulent current environment. The main cause of this stems from its deficiencies in recognizing and incorporating the value of managerial interventions through strategic decisions to delay, expand, or even abandon an investment. A real options analysis (ROA) is proposed in this paper as a dynamic “wait and see” alternative to the static “now or never” DCF methodology, which is based entirely on a positive net present value (NPV) output. Thus, the aim of the research is to explore whether the practical application of ROA for the assessment of the financial viability of urban development capital investment projects can be improved from the obtained managerial flexibility in the decision-making process. Spreadsheet-based mathematical models are developed for the analysis and implementation of both the Black–Scholes formula and the binomial lattice method. The results are discussed and compared with a classic DCF analysis. The main advantages of using ROA, i.e., determining alternative paths of urban development and providing a practical and flexible means to adapt to changing external conditions, are highlighted through the application of a common type of real option to an actual new multistorey office building project. Based on the DCF model and its negative NPV, the investment under study is not viable. However, when simply considering the delay strategic option, the project turns out to be highly valuable. For comparison reasons, future work is recommended on alternative types of real options, like the compound staging option, and towards the use of alternative ROA tools, like the Monte Carlo Simulation technique, non-recombining binomial lattices, and the dividend-based version of the Black–Scholes model.

26 November 2018 in KnE Social Sciences
Verified
Journal Article
Open access
PDF file
DKDimitrios Kantianis
Dimitrios Kantianis
KLK J Liapis
K J Liapis
The research aims at exploring the critical variables that affect public works contractors’ working capital in the delivery of infrastructure projects. Effective financial management has long been recognized as the ‘lifeblood’ of construction contractors, especially during economic periods of recession. The main reason for insolvency in the built environment is the lack of working capital to support contractors’ site operations. Therefore, it is vital to accurately predict the project working capital requirements at the pre-tender stage and closely monitor project cash-flow during the physical production process. The proposed methodology entails the development of a cash-flow/ working capital calculation process based on spreadsheet modelling and the Gantt chart for the derivation of project disbursements S-curves, revenue step function curves, and maximum/net cash-flow profiles. The model is implemented to a recently delivered typical infrastructure project – the construction of a new peripheral highway reinforced concrete bridge – and a sensitivity analysis is conducted to reach useful conclusions concerning the significance in infrastructure working capital of the following variables examined: the retention percentage, the ‘front-end rate loading’ by the contractor, and the premium advance incentive by the owner. The lowest maximum working capital requirement results from the provision of an advance mobilization payment by the owner to the contractor at project start-up and the selection of the latest start times site work execution program. The herein presented study is expected to assist both researchers and practitioners operating within the public construction sector in decision-making towards more effective financial management of infrastructure projects. Keywords: infrastructure projects, public works contractors, cash-flow management, working capital, Gantt chart, S-curve

26 February 2025 in Land
Verified
Journal Article
Open access
PDF file
DKDimitrios Kantianis
Dimitrios Kantianis
Serafeim PolyzosSerafeim Polyzos
Serafeim Polyzos
Thomas KrabokoukisThomas Krabokoukis
Thomas Krabokoukis
The research aims at studying land use changes, the environmental impact and socio-economic effects from the construction of major road transport infrastructure projects. The methodology adopted herein includes a review of the relevant literature to examine the relationship between infrastructure provision and associated positive or negative impacts on land, environment, society and economy. Statistical data mainly from the Hellenic Statistical Authority and useful informational data from relevant research and recent studies were collected and processed in order to evaluate the overall effect of the two major road projects Gefyra “Charilaos Trikoupis” (Rio–Antirio Bridge) and Ionia Odos (Ionian Road) in the Regions of Dytiki Ellada (Western Greece), Ipeiros (Epirus) and Ionioi Nisoi (Ionian Islands). The descriptive statistical analysis indicates that positive impacts include the following: transport time savings and road safety improvement; increased commercial imports/exports activity; increased private building activity and tourist traffic/employment; and intensified truck traffic at the port of Igoumenitsa. Conversely, negative impacts involve: less arable agricultural land; increased whilst tolerable environmental pollution; and a general reduction in all types of traffic activity at the port of Patras. From the quantitative analysis using the analytic hierarchy process (AHP), it emerged that the most overall benefitted region is the Ionian Islands, followed by Epirus and Western Greece. The general conclusion from the research seems to support the theoretical approaches and related studies: transport infrastructure is an important condition but not a guarantee of regional development.


15 September 2014
Verified
Book Chapter
Closed access
PDF file
KLKonstantinos Liapis
Konstantinos Liapis
DKDimitrios Kantianis
Dimitrios Kantianis
CGChristos Galanos
Christos Galanos