Jinmei Li

Dr. Jinmei Li

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 November 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SMShaokun Ma
Shaokun Ma
ZZZhang Zhou
Zhang Zhou
ZDZhibo Duan
Zhibo Duan
ZHZhen HUANG
Zhen HUANG
BHBenfu He
Benfu He
JLJinmei Li
Jinmei Li
This study aims to solve the problem of stability of the excavation surface of a new tunnel crossing an existing tunnel orthogonally. The relative horizontal spacing between the two tunnels is taken as an influencing factor, and transparent soil model tests are conducted and expanded with numerical simulations. Finally, the active destabilization mechanism and influence characteristics of the excavation surface of the two tunnels at different horizontal spacings, vertical spacings, and tunnel diameter ratios are obtained. The results show that when the excavated face is destabilized, the existing tunnel located in front of and above the excavation surface limits the development of the upper “silo” and the transfer of soil stress in the destabilized area, and the ultimate support pressure is reduced by 17.6% and 8.7%, respectively. This effect increases as the vertical spacing between the two tunnels decreases and the tunnel diameter ratio increases. At this point, the deformation trend of the existing tunnel cross-section is reflected as “elliptical-shaped”. This trend is more apparent when the vertical spacing between the two tunnels and the tunnel diameter ratio are decreased. The protection of the existing tunnel should be strengthened at this time.