Limeng XUE

Dr. Limeng XUE

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2024 in Actuators
Verified
Journal Article
Open access
PDF file
HMHongwei Ma
Hongwei Ma
LXLimeng XUE
Limeng XUE
CWChuanwei Wang
Chuanwei Wang
WCWenda Cui
Wenda Cui
With problems of low cutting efficiency, poor forming quality, and low control accuracy in large-section semi-coal rock roadway tunneling, comprehensive coal tunneling seriously lags behind fully mechanized mining. A fuzzy PID control method was proposed, taking the cutting robot in a shield-type tunneling system as the research object. Using mathematical analysis and other methods, a kinematic model of the cutting robot was established, and the pose transformation matrix of the cutting robot during the cutting process was obtained. A limit model for the motion space of the cutting robot cutting drum was established, and the motion relationship between the driving cylinder and the cutting drum was obtained. A fuzzy PID cutting robot control scheme was designed. The feasibility of the model was validated by simulation methods, and the correctness of the model and simulation was verified through on-site experiments. The results indicate that the established cutting robot model is correct, and the proposed fuzzy PID control method for the cutting robot is feasible. The maximum error of the center control of the cutting drum was 5.5 mm, and the average date was 0.89 mm, which was far less than the standard of 50 mm for engineering of the cross-section cutting of the roadway. This study enriches the control theory of shield-type cutting robots by improving control accuracy, enhancing the cutting efficiency of large-section semi-coal rock tunnels, ensuring the quality of section forming, and narrowing the gap between comprehensive coal tunneling and fully mechanized mining.

3 April 2025 in Actuators
Verified
Journal Article
Open access
PDF file
HMHongwei Ma
Hongwei Ma
WCWenda Cui
Wenda Cui
CWChuanwei Wang
Chuanwei Wang
XXXusheng Xue
Xusheng Xue
QMQinghua Mao
Qinghua Mao
KMKexiang Ma
Kexiang Ma
To meet the mining requirements of the ’excavation–backfill–retention’ tunneling method for inter-panel coal pillars, this paper proposes an integrated ‘excavation–backfill–retention’ equipment system centered on a cutting robot. An interactive design method was employed to analyze the interaction between mining conditions and the cutting robot, constructing a ’requirements–functions–structure’ model. The robot integrates a horizontal drum cutting mechanism with a slider shoe walking mechanism, offering enhanced adaptability to various mining conditions. A parameter model was constructed to explore the relationship between the cutting arm length and the robot’s structural parameters under varying mining heights. Using a hierarchical solution method that combines local search and multi−objective genetic algorithms, the robot’s fundamental parameters were determined, enabling the development of a detailed 3D model. A kinematic model based on the modified D–H method was developed to analyze the cutting arm’s swing angle, cylinder extension, propulsion velocity, and cutting velocity in practical mining scenarios. The working range of the height adjustment and feed cylinders at different mining heights was determined through simulation. A dynamics model of the cutting drum was developed, and a coupled simulation using the discrete element method (DEM) was conducted to analyze the relationship between coal/rock hardness, drum load, and cutting depth. The simulation results indicate that as the cutting depth raises the number of cutting teeth in contact with surrounding rock, the cutting depth grows, resulting in a larger reaction force from the coal seam and greater fluctuations in drum load torque. Once the maximum cutting depth is reached, load torque stabilizes within a specific range. Considering cutting efficiency, the robot achieves a maximum cutting velocity of 1 m/min with a cutting depth of 250 mm for rock strength greater than f3. For rock strength f3, the maximum cutting velocity is 1 m/min with a 400 mm depth, and for f2, it is 2 m/min with a 400 mm depth. These findings provide a theoretical foundation for the development of adaptive cutting strategies in mining operations, contributing to improved performance and efficiency in complex mining conditions.