Wenda Cui

Dr. Wenda Cui


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HMHong wei Ma
Hong wei Ma
JCJiashuai Cheng
Jiashuai Cheng
CWChuanwei Wang
Chuanwei Wang
HZHeng Zhang
Heng Zhang
WCWenda Cui
Wenda Cui
HTHai-bo Tian
Hai-bo Tian
Facing the support challenges of short-wall working face (15–40m) roadways in the ‘excavation–backfill–retention’ tunneling method for section coal pillars, traditional equipment struggled to achieve stable, reliable, and efficient support. This paper designed a temporary support robot for the excavation and mining system of section coal pillars to ensure the safety of equipment and personnel in short-wall working faces. The support requirements of the section coal pillar excavation and mining system were analyzed, and a general ‘driving under pressure’ temporary support scheme was proposed. The working principle of the temporary support robot was analyzed. A mechanical model for the stable support of the temporary support robot was established. The mechanical properties of the surrounding rock were analyzed, and the allowable range of the temporary support robot’s supporting force was determined while ensuring the stability of the surrounding rock. Based on the Stribeck friction theory, a dynamic model of the temporary support robot in the driving under pressure state was constructed. The boundary conditions of the dynamic model were set, and the corresponding relationship between the temporary support robot’s supporting force and its maximum static friction force was determined. This accurately described the influence of the supporting force and pushing (pulling) force on the movement during the process of driving under pressure. Through finite element simulation, the stress conditions of the temporary support robot and the floor under maximum load were analyzed, indicating that this load condition would not cause damage to the temporary support robot or the surrounding rock. Through multi-body dynamics simulation, the pushing (pulling) forces required for the temporary support robot’s movement under different supporting force conditions were obtained, verifying the feasibility of the driving under pressure action under different supporting force conditions. Moreover, the model-predicted and simulated values of the required pushing (pulling) forces during the process of driving under pressure were consistent, validating the accuracy of the driving under pressure dynamic model. This research provides a new theoretical framework for the design and dynamic analysis of temporary support equipment for short-wall working faces in section coal pillar mining, holding significant academic value and broad application prospects.

3 April 2025 in Actuators
Verified
Journal Article
Open access
PDF file
HMHongwei Ma
Hongwei Ma
WCWenda Cui
Wenda Cui
CWChuanwei Wang
Chuanwei Wang
XXXusheng Xue
Xusheng Xue
QMQinghua Mao
Qinghua Mao
KMKexiang Ma
Kexiang Ma
To meet the mining requirements of the ’excavation–backfill–retention’ tunneling method for inter-panel coal pillars, this paper proposes an integrated ‘excavation–backfill–retention’ equipment system centered on a cutting robot. An interactive design method was employed to analyze the interaction between mining conditions and the cutting robot, constructing a ’requirements–functions–structure’ model. The robot integrates a horizontal drum cutting mechanism with a slider shoe walking mechanism, offering enhanced adaptability to various mining conditions. A parameter model was constructed to explore the relationship between the cutting arm length and the robot’s structural parameters under varying mining heights. Using a hierarchical solution method that combines local search and multi−objective genetic algorithms, the robot’s fundamental parameters were determined, enabling the development of a detailed 3D model. A kinematic model based on the modified D–H method was developed to analyze the cutting arm’s swing angle, cylinder extension, propulsion velocity, and cutting velocity in practical mining scenarios. The working range of the height adjustment and feed cylinders at different mining heights was determined through simulation. A dynamics model of the cutting drum was developed, and a coupled simulation using the discrete element method (DEM) was conducted to analyze the relationship between coal/rock hardness, drum load, and cutting depth. The simulation results indicate that as the cutting depth raises the number of cutting teeth in contact with surrounding rock, the cutting depth grows, resulting in a larger reaction force from the coal seam and greater fluctuations in drum load torque. Once the maximum cutting depth is reached, load torque stabilizes within a specific range. Considering cutting efficiency, the robot achieves a maximum cutting velocity of 1 m/min with a cutting depth of 250 mm for rock strength greater than f3. For rock strength f3, the maximum cutting velocity is 1 m/min with a 400 mm depth, and for f2, it is 2 m/min with a 400 mm depth. These findings provide a theoretical foundation for the development of adaptive cutting strategies in mining operations, contributing to improved performance and efficiency in complex mining conditions.

1 December 2024 in Actuators
Verified
Journal Article
Open access
PDF file
HMHongwei Ma
Hongwei Ma
LXLimeng XUE
Limeng XUE
CWChuanwei Wang
Chuanwei Wang
WCWenda Cui
Wenda Cui
With problems of low cutting efficiency, poor forming quality, and low control accuracy in large-section semi-coal rock roadway tunneling, comprehensive coal tunneling seriously lags behind fully mechanized mining. A fuzzy PID control method was proposed, taking the cutting robot in a shield-type tunneling system as the research object. Using mathematical analysis and other methods, a kinematic model of the cutting robot was established, and the pose transformation matrix of the cutting robot during the cutting process was obtained. A limit model for the motion space of the cutting robot cutting drum was established, and the motion relationship between the driving cylinder and the cutting drum was obtained. A fuzzy PID cutting robot control scheme was designed. The feasibility of the model was validated by simulation methods, and the correctness of the model and simulation was verified through on-site experiments. The results indicate that the established cutting robot model is correct, and the proposed fuzzy PID control method for the cutting robot is feasible. The maximum error of the center control of the cutting drum was 5.5 mm, and the average date was 0.89 mm, which was far less than the standard of 50 mm for engineering of the cross-section cutting of the roadway. This study enriches the control theory of shield-type cutting robots by improving control accuracy, enhancing the cutting efficiency of large-section semi-coal rock tunnels, ensuring the quality of section forming, and narrowing the gap between comprehensive coal tunneling and fully mechanized mining.