Yongsheng Bai

Dr. Yongsheng Bai


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 September 2022 in Sensors
Verified
Journal Article
Open access
PDF file
EDEnzhi Dong
Enzhi Dong
TGTielu Gao
Tielu Gao
ZCZhonghua Cheng
Zhonghua Cheng
ZCZhonghua Cheng
Zhonghua Cheng
YBYongsheng Bai
Yongsheng Bai
Complex two-dimensional warranty equipment is usually composed of many multi-component systems, which include several key components. During the warranty period, conducting maintenance according to the preventive maintenance plan of each component will increase the warranty costs. Opportunistic maintenance is an effective approach to combine the preventive maintenance of each individual component, which can reduce the warranty cost and improve the system availability. This study explored the optimal opportunistic maintenance scheme of multi-component systems. Firstly, the failure rate model and reliability evaluation model of the multi-component system considering failure dependence were established. Secondly, the preventive maintenance plan of each individual component was determined, with the goal of obtaining the lowest warranty cost per unit time in the component life cycle. Thirdly, the preventive maintenance work of each individual component was combined, and the two-dimensional warranty cost model of the multi-component system was established according to the reliability threshold when performing opportunistic maintenance. In the experimental verification and result analysis, the genetic algorithm was used to find the optimal opportunistic maintenance scheme for the power transmission device. The comparative analysis results show that the opportunistic maintenance scheme reduced the warranty cost by 5.5% and improved the availability by 10%, which fully verified the effectiveness of the opportunistic maintenance strategy.

1 October 2025 in Journal of Systems Engineering and Electronics
Verified
Journal Article
Closed access
EDEnzhi Dong
Enzhi Dong
ZCZhonghua Cheng
Zhonghua Cheng
Zichang LiuZichang Liu
Zichang Liu
XZXi Zhu
Xi Zhu
ZCZhonghua Cheng
Zhonghua Cheng
YBYongsheng Bai
Yongsheng Bai
Performance-based warranties (PBWs) are widely used in industry and manufacturing. Given that PBW can impose financial burdens on manufacturers, rational maintenance decisions are essential for expanding profit margins. This paper proposes an optimization model for PBW decisions for systems affected by Gamma degradation processes, incorporating periodic inspection. A system performance degradation model is established. Preventive maintenance probability and corrective renewal probability models are developed to calculate expected warranty costs and system availability. A benefits function, which includes incentives, is constructed to optimize the initial and subsequent inspection intervals and preventive maintenance thresholds, thereby maximizing warranty profit. An improved sparrow search algorithm is developed to optimize the model, with a case study on large steam turbine rotor shafts. The results suggest the optimal PBW strategy involves an initial inspection interval of approximately 20 months, with subsequent intervals of about four months, and a preventive maintenance threshold of approximately 37.39 mm wear. When compared to common cost-minimization-based condition maintenance strategies and PBW strategies that do not differentiate between initial and subsequent inspection intervals, the proposed PBW strategy increases the manufacturer's profit by 1% and 18%, respectively. Sensitivity analyses provide managerial recommendations for PBW implementation. The PBW strategy proposed in this study significantly increases manufacturers' profits by optimizing inspection intervals and preventive maintenance thresholds, and manufacturers should focus on technological improvement in preventive maintenance and cost control to further enhance earnings.