Xiaodong Jiaotong Zhang

Mr. Xiaodong Jiaotong Zhang


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 February 2025 in Energies
Verified
Journal Article
Open access
PDF file
XZXiaodong Jiaotong Zhang
Xiaodong Jiaotong Zhang
Wei LiuWei Liu
Wei Liu
QXQian Jiaotong Xu
Qian Jiaotong Xu
ZYZhuoxin Yang
Zhuoxin Yang
DXDingxin Xia
Dingxin Xia
HLHaonan Liu
Haonan Liu
In a traction power supply system, the design of traction substations significantly influences both the system’s operational stability and investment costs, while the energy management strategy of the flexible substations affects the overall operational expenses. This study proposes a novel two-stage system optimization design method that addresses both the configuration of the system and the control parameters of traction substations. The first stage of the optimization focuses on the system configuration, including the optimal location and capacity of traction substations. In the second stage, the control parameters of the traction substations, particularly the droop rate of reversible converters, are optimized to improve regenerative braking energy utilization by applying a fuzzy logic-based adjustment strategy. The optimization process aims to minimize the total annual system cost, incorporating traction network parameters, power supply equipment costs, and electricity expenses. The parallel cheetah algorithm is employed to solve this complex optimization problem. Simulation results for Metro Line 9 show that the proposed method reduces the total annual project costs by 5.8%, demonstrating its effectiveness in both energy efficiency and cost reduction.