To enhance the energy efficiency and operational performance of metro railway systems, rectifier unit (RU) and energy feedback systems (EFS) are increasingly being adopted in urban rail transit systems. In this paper, a novel bi-level methodology focusing on the joint optimization of RU and EFS is proposed for the design of DC metro lines, with the objective of minimizing the total annual project cost. The methodology aims to determine the optimal combination of traction substation(TS) and EFS configurations, including their locations and sizes. The proposed strategy determines suitable traction substation solutions at upper level, considering constraints related to rail potential and power supply capacity under ‘N-1’ conditions. Subsequently, optimal solutions for EFS configurations are obtained at lower level, considering annual electricity consumption costs and the cost of EFS. To solve this problem, a bi-level algorithm that utilizes a modified salp swarm algorithm (MSSA) in combination with a traction power flow simulator is designed. The optimization methodology is evaluated through simulations conducted on the Xuzhou metro line 2 in China. The simulation results demonstrate that the proposed optimization method can effectively obtain optimal solutions, resulting in a significant reduction of the project’s annual cost by 3.78%.
17 December 2024 in IEEE Transactions on Transportation Electrification
The system efficiency of reversible substations (RSSs) in urban rail transit power supply systems has garnered significant attention. In particular, reverse power flow from the main substation (MS) has been observed in the real world, adversely impacting system efficiency. This article proposes a novel power supply structure for RSSs that effectively reduces reverse power flow. To further enhance system efficiency, an optimal model is established by leveraging the control characteristics of RSSs. Then, a system efficiency energy regulation and control framework considering complex scenarios is presented, with the lowest system losses as the optimization objective. The modified Cheetah Optimizer algorithm is adopted to optimize the control parameters of reversible converters (RCs). Simulations of actual engineering cases are conducted, and the results demonstrate the effectiveness of the proposed power supply solution and energy regulation control in various scenarios. The proposed method can improve energy efficiency by up to 3.25% and 2% compared with nonoptimized and existing offline optimized methods, and this value varies depending on the scenario. Additionally, performance analysis and evaluation highlight the fundamentals of energy regulation in enhancing system efficiency, including balancing bus load, appropriately increasing catenary voltage, and adjusting the proportion of regenerative braking energy (RBE) between the ac and dc sides based on different situations.
15 January 2025 in IEEE Transactions on Transportation Electrification
To overcome the load uncertainty of cophase power supply systems, including photovoltaic (PV), hybrid energy storage systems (HESSs), and distribution networks in electrified railways, this article proposed a three-stage optimal energy management strategy. Day-ahead optimization aims to minimize the daily cost of the system. Intraday optimization is implemented based on short-time prediction. Its objective is a hybrid of economic-based optimization and power tracking. It adjusts HESS outputs solved in the day-ahead stage. A techno-economical object is implemented in real-time optimization to reduce electricity prices and improve electricity quality. A linearized battery degradation model is proposed to conquer the difficulty of solving optimal scheduling problems with consideration of battery degradation. Real measured load profiles from a high-speed railway substation are applied to verify the proposed model. The results show that in the day-ahead stage, with the integration of PV and HESS, the daily cost of the system decreased by 6.80%. The intraday optimization and real-time optimization in the proposed model can effectively adjust the HESS output when the actual load varies compared to the reference value. The linearized battery degradation model is proved to be accurate, with an average relative error of 0.8%.
1 January 2024 in IEEE Transactions on Transportation Electrification
The onboard braking resistance (OBR) is widely installed on urban rail trains. The general trend is to cancel OBR in urban rail, due to the low efficiency of using regenerative braking energy. The design of Energy feedback systems (EFSs) after canceling OBR is important because EFSs need to balance energy-saving effects and network voltage safety. Besides, the pneumatic braking may increase, so the brake shoe life needs to be further studied. In this paper, the electro-pneumatic braking and braking shoe wear models are first built. Then the power supply calculation algorithm considering OBR is proposed, including the train dynamic model, train brake power distribution rule, and power supply calculation algorithm. Next, the EFS optimal design after canceling OBR is discussed. The comprehensive cost includes the cost of changing braking shoes. A case study denotes that up to 20.5 MWh or 18.5% of the traction energy can be saved per day after canceling OBR and setting EFSs at each traction substation. The brake shoe life will be 92~159 days. In CLC/TR 50646, after canceling OBR, EFS should be installed at each TS. The optimal result does not follow the rule but can save at least 7.6% of the total cost compared with the actual project.
In a traction power supply system, the design of traction substations significantly influences both the system’s operational stability and investment costs, while the energy management strategy of the flexible substations affects the overall operational expenses. This study proposes a novel two-stage system optimization design method that addresses both the configuration of the system and the control parameters of traction substations. The first stage of the optimization focuses on the system configuration, including the optimal location and capacity of traction substations. In the second stage, the control parameters of the traction substations, particularly the droop rate of reversible converters, are optimized to improve regenerative braking energy utilization by applying a fuzzy logic-based adjustment strategy. The optimization process aims to minimize the total annual system cost, incorporating traction network parameters, power supply equipment costs, and electricity expenses. The parallel cheetah algorithm is employed to solve this complex optimization problem. Simulation results for Metro Line 9 show that the proposed method reduces the total annual project costs by 5.8%, demonstrating its effectiveness in both energy efficiency and cost reduction.