During the design of the external cladding, it is possible to use different materials and compositions. One of these possibilities is also a ventilated facade, which consists of a supporting structure, a thermal insulation, a supporting grid, an air gap for ventilation and a cladding layer. The construction of the supporting grid in the ventilated facade must be mechanically anchored into the supporting structure of the external cladding. This mechanical anchoring causes 3-D point thermal bridges in the external cladding itself. Therefore, the aim of this work is to assess and analyze the influence of these 3-D point thermal bridges on transmission heat losses through the external cladding. A Finite Element Mesh analysis has been used for this analysis. Different types of external cladding compositions were modeled in the simulation program, and the effect on the heat transfer coefficient was determined. In addition to the analysis of the existing anchoring systems, an innovative solution has been suggested that is more economical and easier to implement. The results show that the application of anchors and their number impacts significantly on the thermal properties of the envelope. The difference between the anchoring element with a thermal insulation pad and the patented method is minimal. This is a 1.29% difference. The last variant was a proposal (patent) that the anchoring element is only plastic-coated and thus its thermal engineering properties are improved, which is manifested mainly in heat conduction but also from the radiant point of view, as plasticizing the emissivity changes. Compared to the perimeter cladding without the ap-plication of an anchoring element, the heat loss increases by 29.37%. In addition to the energy savings, there are also financial savings. While the plastic pads costs about EUR 0.3, the plastic coating (patent) represents a price of around EUR 0.03. If we had a building with 10,000 m2 of wall area where 6 pieces of anchors per 1 m2 are applied, the savings would be EUR 16,200. Such savings are already significant. The conclusion of this work is that these point thermal bridges have a significant impact on the overall transmission heat loss coefficient and therefore they have overall heat demand and energy demand.
Earthwork processes are the most costly and time consuming component of construction these days and they are characterized by a powerful heavy mechanization which participate on the earthwork process. Current pressure for minimize the cost and maximize the productivity highlights the need to optimize earthworks. In this paper, the optimization process in the area of earthwork processes is described. The selection of the right types of machines for earthwork and its implements has become very difficult these days because of availability of variety of machines models and therefore a multicriteria method is presented to tackle the problem. This paper describes methodology for optimizing the earthwork process according to the selected optimal criteria. The methodology is focused on the proposal phase of optimization where the decision maker has to make a decision and choose the right type of excavators. To overcome the problem of comparing the chosen machines a mathematical modeling approach leading to multicriteria optimization was adopted to make the step wise decision. The methodology gives an mathematical models by which we can solve this problem.
This article focuses on the energy performance of buildings with an emphasis on the consequences of non-compliance with technological practices during the building process. We analyse the impact of construction deficiencies on the consumption of heat for heating, focusing on specific case studies of selected building constructions in the Slovak Republic. The results show that non-compliance with prescribed technological standards and procedures leads to significant deterioration in the building’s energy efficiency, which is manifested in increased heat consumption and higher operating costs. The findings of this study have key importance for future construction projects as they offer valuable recommendations for improving energy standards and construction quality, thus contributing to a more sustainable and efficient building process. When designing buildings with near-zero energy demand, it is necessary to eliminate all risks in the project that arise during the preparation and design itself, as well as during implementation.
Energy performance certification of buildings is a key instrument for assessing energy efficiency within the framework of the Energy Performance of Buildings Directive (EPBD). In practice, significant discrepancies are often observed between the predicted and actual energy performance of buildings. One of the main causes of this discrepancy is non-compliance with technological procedures during construction. This paper analyses the energy and economic consequences of such deviations through a case study of a newly constructed residential building in northern Slovakia that was originally certified in the A0 energy class. The research methodology included in situ inspection of the building, thermographic measurements, destructive probes of the building envelope, analysis of project documentation, and recalculation of energy performance using measured building parameters. The results revealed significant deficiencies in the thermal insulation of the building envelope, roof construction, and window airtightness. After recalculation based on measured parameters, the building’s energy classification deteriorated from A0 to B. The total energy demand increased by 46%, while primary energy demand increased by 141%. The results demonstrate that construction deviations can significantly affect the reliability of energy performance certification. The study highlights the importance of verifying the actual condition of buildings during construction to ensure the reliability of EPC assessments.