The Indonesian construction industry has increased due to the policy of infrastructure projects acceleration. Construction is a dangerous industry that often takes casualties. In recent years there have been many accidents in the precast bridge projects, which have caused moral and material losses, projects were stopped and delayed. Separate budgets that are not specifically prepared in implementing the Occupational Safety and Health Management System (OHSMS) is one of the causes of the poor implementation of OHSMS and create high rates of accidents. Thus, the financing of OHSMS was taken from the project budget, which led to a reduction in the profits. The aims of the study are determining the work breakdown structure (WBS) in precast bridge project, identifying hazards and risks, developing safety plans, identifying safey costs components and calculating of safety cost. This research is a survey research with respondents of experts in construction safety, descriptive analysis is used to determine variables. A case study approach is also used to calculate safety costs. The results of this study are the precast bridges standardized WBS, safety plan to each hazards and activity, finding the safety costs components based on WBS, and the percentage of total safety cost Kundur Bridge is 3,21%.
The Indonesian government is currently focusing on infrastructure development, including military infrastructure to strengthen national defense. One of these projects is the development of the Indonesian Army Central Hospital, which is being continually expanded with facilities such as proton beam therapy. Due to its underground construction, special attention must be given to construction safety to prevent workplace accidents. This study focuses on assessing construction safety risks at the military hospital using activity-based failure modes and effects analysis (FMEA). The research methodology employed is a mixed-method approach involving 5 construction safety experts and 100 respondents directly involved in underground structure construction. Descriptive data analysis was conducted, serving as the basis for calculating risk priority numbers (RPN) using the FMEA method. Three main activities were identified with very high risks ranked from 1 to 10: lifting of contiguous pile casing, basement excavation, and installation of cast in situ bored pile gutter. These activities entail safety risks with RPN values ranging from 100 to 125, including worker’s hands being caught in tools/materials, being struck by tools/materials, falling/slipping into excavations, and being buried/struck by excavated soil. This research has positive implications as a reference for developing construction safety plans that include risk identification, risk assessment, and determination of control measures.
Aircraft hangars are essential in the aviation industry, providing crucial maintenance and protection for aviation assets. However, constructing these upper structures involves significant safety risks. Due to the complexity of upper structure construction, it is vital to prioritize safety to prevent workplace accidents. Ensuring construction safety is not only crucial for operational efficiency but also aligns with several Sustainable Development Goals (SDGs), such as Decent Work and Economic Growth (SDG 8) and Industry, Innovation, and Infrastructure (SDG 9). This study assesses the safety risks associated with hangar construction using activity-based failure modes and effects analysis (FMEA). A mixed-method approach is adopted, incorporating insights from five construction safety experts and data from 100 individuals directly involved in the upper structure construction of the spaceframe hangar. Descriptive data analysis was employed to establish the foundation for computing risk priority numbers (RPNs) using the FMEA technique. Three primary activities were identified as having extremely high risks: workers falling from heights during the lifting and erection of the space frame, workers falling from heights during basement excavation while installing floor slab formwork, and workers falling from heights during the casting of floor slabs. These activities present safety risks with RPN values ranging from 64 to 100, including incidents of workers falling from heights and being struck by materials. This study serves as a crucial reference for formulating construction safety plans that encompass risk identification, assessment, and control measures. The findings provide essential insights into various safety hazards in construction projects, particularly those related to military infrastructure. By identifying and assessing these risks, the research facilitates the development of more effective and comprehensive safety protocols. Implementing the recommended control measures ensures a proactive approach to mitigating potential accidents and injuries. Consequently, this research contributes to academic knowledge and enhances safety standards and practices within the construction industry.
The military airbase plays a crucial role in national defense, particularly in air defense. One of the most critical facilities at a military airbase for supporting air operations is the runway that serves as the area where fighter aircraft take off and land; hence. If such an event occurs, the Air Force’s capability, specifically the ability of fighter aircraft to take off and land, would be compromised, disrupting air operations. Therefore, the rapid damage runway repair (RADARR) method, aligned with the rigid pavement construction approach, is essential. The foundation of the construction implementation involves creating a Work Breakdown Structure (WBS) as a reference for RADARR operation planning. This study aims to develop a WBS as the basis for RADARR operation time planning. The research method employed is a mixed-method approach with descriptive analysis. The variables under investigation include work packages, construction methods, work activities, and the duration of operations. This study comprises expert judgment, pilot surveys, respondent surveys, and focus group discussion (FGD) followed by the development of RADARR WBS, measure the operational time of RADARR through respondent surveys. These findings serve as a valuable reference for executing RADARR construction work within the military context.