Anasya Arsita Laksmi

Anasya Arsita Laksmi

Auto-generated profile, based on publicly available information

Anasya Arsita Laksmi

Program Studi Teknik Sipil, Fakultas Sains dan Teknologi Pertahanan, Universitas Pertahanan Republik Indonesia, Kabupaten Bogor, Indonesia

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 September 2022 in Solid Earth Sciences
Verified
Journal Article
Open access
MFMuhammad Hamzah Fansuri
Muhammad Hamzah Fansuri
MCMuhsiung Chang
Muhsiung Chang
PSPungky Dharma Saputra
Pungky Dharma Saputra
NPNina Purwanti
Nina Purwanti
ALAnasya Arsita Laksmi
Anasya Arsita Laksmi
SPSurya Dewi Puspitasari
Surya Dewi Puspitasari


5 February 2025 in Engineering Proceedings
Verified
Conference Paper
Open access
PDF file
PSPungky Dharma Saputra
Pungky Dharma Saputra
MFMuhammad Hamzah Fansuri
Muhammad Hamzah Fansuri
ALAnasya Arsita Laksmi
Anasya Arsita Laksmi
MRM Ragil
M Ragil
MSMadeline Nauli Basa Simbolon
Madeline Nauli Basa Simbolon
The Indonesian government is currently focusing on infrastructure development, including military infrastructure to strengthen national defense. One of these projects is the development of the Indonesian Army Central Hospital, which is being continually expanded with facilities such as proton beam therapy. Due to its underground construction, special attention must be given to construction safety to prevent workplace accidents. This study focuses on assessing construction safety risks at the military hospital using activity-based failure modes and effects analysis (FMEA). The research methodology employed is a mixed-method approach involving 5 construction safety experts and 100 respondents directly involved in underground structure construction. Descriptive data analysis was conducted, serving as the basis for calculating risk priority numbers (RPN) using the FMEA method. Three main activities were identified with very high risks ranked from 1 to 10: lifting of contiguous pile casing, basement excavation, and installation of cast in situ bored pile gutter. These activities entail safety risks with RPN values ranging from 100 to 125, including worker’s hands being caught in tools/materials, being struck by tools/materials, falling/slipping into excavations, and being buried/struck by excavated soil. This research has positive implications as a reference for developing construction safety plans that include risk identification, risk assessment, and determination of control measures.

1 January 2023 in AIP Conference Proceedings
Verified
Conference Paper
Open access
PDF file
PSPungky Dharma Saputra
Pungky Dharma Saputra
LSLuxpetrus Agustian Suhandi
Luxpetrus Agustian Suhandi
INIdi Namara
Idi Namara
NPNina Purwanti
Nina Purwanti
MFMuhammad Hamzah Fansuri
Muhammad Hamzah Fansuri
ALAnasya Arsita Laksmi
Anasya Arsita Laksmi
Indonesia is active in infrastructure development, especially the railway infrastructure. Currently, there are a lot of elevated railway construction projects and there are many construction accidents in elevated construction. Different construction methods in elevated construction lead to different safety risks. Therefore, it is necessary to identify safety risks, especially high risks. The main objective of this research is to identify high safety risks in box girder construction on elevated railway projects. This research was designed in 3 main stages, starting from risk identification, expert validation, and risk assessment survey. The main variable is the safety risk in box girder construction with launching gantry, heavy shoring, and cast in situ method. The project reviewed is the Double Track (DDT) Railway Project in Jakarta. The result of the analysis shows that there were some high safety risks in box girder construction with launching gantry method, heavy shoring method, and cast in situ method i.e. traffic accident, hit by heavy equipment, fall from a height, struck down by material, wire hanger broke, formwork collapse, heavy shoring collapse, heavy equipment overturned and collapsed and struck down by box girder. The result of this research can be a determinant in the development of good construction safety planning for the next elevated railway project.

1 January 2023 in AIP Conference Proceedings
Verified
Conference Paper
Open access
PDF file
PSPungky Dharma Saputra
Pungky Dharma Saputra
LSLuxpetrus Agustian Suhandi
Luxpetrus Agustian Suhandi
NPNina Purwanti
Nina Purwanti
MFMuhammad Hamzah Fansuri
Muhammad Hamzah Fansuri
ALAnasya Arsita Laksmi
Anasya Arsita Laksmi
The development of elevated railway infrastructures in Indonesia is going rapidly. The uniqueness of the T-Pier construction in the elevated railway project is the construction method that causes many activities to execute. The explained activities in the construction method were not clear, neither treated in much detail. In line with the problem, this research aim is to identify T-Piers construction work activities specifically. The project sample was MRT Jakarta CP 103 elevated section and T-Pier construction was the object of the case study. The first stage of this research was archive analysis, expert validation, and surveying of 100 bridge engineers. The collected data were analyzed by the descriptive analysis method. Then the work breakdown structure tree diagram was developed and shown the activities development. There were 31 activities identified starting from preparation until finishing and grouped into the main section group of activities i.e. pile cap, pier column, installation, and dismantling of temporary shoring, and pier head group activities. All the experts agreed that the activities identified were valid and almost all respondents 100% agree. The activities identified were at level 5 in the work breakdown structure development. The detailed activities can be standardized as a reference in future similar projects.

7 February 2025 in Jurnal Komposit
Verified
Journal Article
Open access
PDF file
FRFatchur Rahman
Fatchur Rahman
FNFuad Ardian Nurudin
Fuad Ardian Nurudin
ALAnasya Arsita Laksmi
Anasya Arsita Laksmi
Penelitian ini menganalisis hidrologi di DAS Ciherang menggunakan empat metode Hidrograf Satuan Sintetik (HSS): Snyder-Alexeyev, Nakayasu, ITB-1, dan ITB-2. Setiap metode diterapkan untuk menilai efektivitasnya dalam memprediksi hidrograf banjir berdasarkan karakteristik fisik DAS dan data curah hujan dari tahun 2013 hingga 2023. Hasil penelitian menunjukkan bahwa metode Snyder-Alexeyev menghasilkan waktu naik 4.43 jam, waktu turun 20.17 jam, dan debit puncak 1.627 m³/det. Metode Nakayasu, dengan waktu naik tercepat 2.049 jam dan waktu turun 20.49 jam, menghasilkan debit puncak tertinggi sebesar 2.523 m³/det. Metode ITB-1 menunjukkan waktu naik 2.951 jam, waktu turun 29.512 jam, dan debit puncak 1.895 m³/det. Metode ITB-2 menghasilkan waktu naik 2.049 jam, waktu turun 20.49 jam, dan debit puncak 1.891 m³/det. Di antara metode yang diuji, Nakayasu dan ITB-2 menunjukkan respons tercepat, dengan Nakayasu menghasilkan debit puncak tertinggi. Temuan ini memberikan wawasan penting bagi manajemen banjir dan perencanaan infrastruktur di DAS Ciherang dan wilayah lain yang serupa.