The issue of sub-module (SM) capacitor voltage unbalance is a hot topic in the current research into the modular multilevel converter (MMC). An excellent strategy comprises mitigating the SM capacitor voltage imbalance by adjusting the SM on time. The traditional capacitor voltage balancing control regulates the speed to maintain accuracy. A unique SM capacitor voltage balancing control strategy is presented in this paper and is based on conventional capacitor voltage balance management and neural network prediction. Firstly, the SM capacitor voltage and arm current are speculated by operating the time series forecasting technique in real time, considering the dynamic changes in the SM capacitor voltage and arm current. Secondly, the SM capacitor voltage distinction between the actual and theoretical value is determined, and a deviation’s mixed Gaussian distribution is established to estimate its compensation voltage. Thirdly, the SM triggering sequence is anticipated by using the neural network along with the pilot values of the SM capacitor voltage, arm current, and the offset compensation value, and the control is executed. Finally, a three-phase, six-leg, eight-module, nine-level MMC model is built to verify the feasibility of the suggested approach.
A wireless power transfer (WPT) system usually needs dual-side cooperated control for efficiency optimization and power regulation, and requires wireless communication between the transmitter and the receiver. Phase shift keying (PSK) communication is a good choice for WPT systems because of its advantages of high security and low hardware cost. However, the converter phase modulation required by the PSK communication causes output power and voltage fluctuations. In this brief, we analyze the relationship between the phase modulation depth and the output fluctuation amplitude. Then we propose a pulse density modulation-based feedforward power compensation method to compensate the fluctuations caused by the PSK communication. Experimental results show that the proposed power compensator can suppress the output voltage fluctuations to an insignificant level without a large output filter capacitor. The proposed method overcomes the main drawback of the PSK communication in WPT systems.
The DC collection system of wind farms can effectively solve the problems of harmonic resonance and reactive power transmission in large-scale wind power AC collection systems, and has broad development prospects. The DC/DC converter is critical equipment in the wind farm DC collection system, and its reliability is related to the entire collection system’s safe and stable operation. The reliability of DC/DC converters is affected by factors such as system operating conditions and control strategies. Based on this, a reliability evaluation model for boost full-bridge isolated (BFBIC) DC/DC converters is proposed from the device level to the submodule level and then to the equipment level, incorporating operating conditions and control strategies into reliability analysis. Firstly, in device-level reliability modeling, the impact of DC/DC converter operating conditions and control strategies on insulated gate bipolar transistor (IGBT) module losses and junction temperature fluctuations are considered. Secondly, fault tree analysis (FTA) is used to establish the reliability model of the BFBIC submodule and DC/DC converter. In the end, we verify the effectiveness of the proposed model through a numerical example, and provide solid data support for analyzing the reliability of the wind farm DC collection system.
To improve the operational efficiency of the Virtual Power Plant (VPP) and the effectiveness and reliability of scheduling boundary characterization, this paper proposes a time-decoupled distributed optimization algorithm. First, based on the Lyapunov optimization theory, time decoupling is implemented within the VPP, transforming long-term optimization problems into single-period optimization problems, thereby reducing optimization complexity and improving operational efficiency. Second, the Alternating Direction Method of Multipliers (ADMM) framework is used to decompose the optimization problem into multiple subproblems, combined with a hybrid strategy to improve the particle swarm optimization algorithm for solving the problem, thus achieving distributed optimization for the VPP. Finally, to facilitate intra-day interaction between the VPP and the distribution network, the remaining controllable capacity of the VPP’s devices is used as the spinning reserve to address renewable energy fluctuations. A dynamic scheduling boundary model is constructed by introducing wind and solar fluctuation factors. Based on time decoupling and algorithm improvement, the scheduling boundaries are solved and updated on a rolling basis. Simulation results show that, firstly, the time decoupling strategy based on Lyapunov optimization has an error of less than 3%, and the solving time is reduced by 86.11% after decoupling, significantly improving solving efficiency and validating the feasibility and effectiveness of the time decoupling strategy. Secondly, the hybrid strategy-improved particle swarm optimization algorithm achieves improvements in convergence speed and accuracy compared to other algorithms. Finally, the VPP scheduling boundary and scheduling cost characterization times are 115 s and 6.7 s, respectively, effectively meeting the timeliness of VPP and distribution network interaction while ensuring the safety and reliability of the scheduling boundaries.