Widi Hartono

Dr. Widi Hartono

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2025 in Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
WHWidi Hartono
Widi Hartono
SKStefanus A. Kristiawan
Stefanus A. Kristiawan
DHDewi Handayani
Dewi Handayani
WSWahyudi Sutopo
Wahyudi Sutopo
In Indonesia, construction accidents have occurred during the construction of bridges and elevated roads, peaking in 2017. The lifting of girder beams has failed in several construction projects, and the formwork has failed during pier construction. The reasons for these work accidents are human and equipment factors, which caused material losses and loss of life. A risk assessment model for bridge construction work accidents in construction projects is proposed in this paper, with the work breakdown structure (WBS), risk breakdown structure (RBS), analytic hierarchy process (AHP), and rating being integrated to assess the risk of bridge construction work accidents. This model is expected to improve safety in bridge construction by providing effective safety planning, especially in the accident risk assessment process. The study results indicate that the WBS and RBS can outline and explain the identification of construction safety risks for bridges and provide insight into the interrelationship of construction phases and the potential risks. The relationship between the WBS and RBS is created in the form of a coupling matrix, and we identify the potential risky activities at each phase and the corresponding construction phases. The AHP can be used to calculate the weights and priorities of the WBS and analyze the magnitude of the risk index for its related risky activities; then, the rating method can be used to analyze the risk index. Girder and diaphragm installation work involves a high risk of workers falling during the erection of girders. Doi: 10.28991/CEJ-2025-011-01-010 Full Text: PDF

1 January 2024 in Matriks Teknik Sipil
Verified
Journal Article
Open access
PDF file
WHWidi Hartono
Widi Hartono
DHDewi Handayani
Dewi Handayani
AHAzharia Nur Hapsari
Azharia Nur Hapsari
Jembatan merupakan salah satu infrastruktur penting. Pada proyek pembangunan suatu jembatan terdiri atas dua bagian, yaitu pekerjaan struktur bawah dan pekerjaan struktur atas. Di dalam setiap proyek pembangunan jembatan pasti berkaitan erat dengan risiko kecelakaan kerja. Setiap pekerjaan memiliki risiko kecelakaan kerja yang berbeda- beda diantaranya pada pekerjaan struktur bawah jembatan. Salah satu pekerjaan struktur bawah jembatan yang memiliki potensi risiko yang cukup tinggi adalah pekerjaan fondasi dan pile cap. Oleh karena itu, perlu untuk mengetahui risiko kecelakaan kerja paling dominan pada pekerjaan fondasi dan pile cap, cara penanganan, serta cara pencegahan yang tepat dari risiko paling dominan tersebut. Penelitian ini menggunakan Australian / New Zealand Risk Management Standard (AS/NZS) 4360: 2004 sebagai pedoman dalam menganalisis risiko kecelakaan kerja yang ada. Pada penelitian ini dilakukan pengambilan data dengan metode studi literatur, metode penyebaran kuesioner, dan wawancara. Data hasil kuesioner yang diperoleh akan melewati tiga tahap analisis yaitu analisis frekuensi, analisis dampak, dan analisis nilai risiko untuk memperoleh hasil penelitian yang sesuai dengan tujuan penelitian. Hasil analisis penelitian ini menunjukkan risiko paling dominan yang terjadi adalah risiko kecelakaan kerja pada saat pekerjaan pengangkutan tiang pancang dengan rata- rata nilai risiko sebesar 5,53 dan tergolong ke dalam level risiko “Medium risk” yaitu sedang. Untuk menanggulangi risiko paling dominan tersebut dapat dilakukan upaya pencegahan diantaranya melaksanakan dan memenuhi standar safety menurut aturan yang berlaku, melakukan pemeriksaan alat dan bahan, serta kondisi lokasi sebelum dilakukan pekerjaan pengangkutan tiang pancang ke titik yang dituju, dan memberikan konsekuensi atau hukuman bagi para pelanggar aturan yang berlaku termasuk aturan safety dalam suatu proyek. Penanganan yang direkomendasikan oleh peneliti adalah melakukan pertolongan pertama pada pekerja yang mengalami kecelakaan kerja yang sebelum dibawa ke fasilitas kesehatan terdekat. Setelah itu dilakukan investigasi atas risiko yang terjadi dan dilakukan upaya penanganan risiko kecelakaan kerja supaya tidak terjadi lagi. Kata kunci : Safety, Risiko, Jembatan, Fondasi, Pile ca

12 February 2025 in Engineering Proceedings
Verified
Conference Paper
Open access
PDF file
WHWidi Hartono
Widi Hartono
SKStefanus Kristiawan
Stefanus Kristiawan
DHDewi Handayani
Dewi Handayani
WSWahyudi Sutopo
Wahyudi Sutopo
The safety of bridge construction has become a special concern for the Indonesian government since many bridge construction accidents occurred in 2017 and 2018. Construction projects involve a small number of contractor employees, so when conducting accident risk assessments, the results become less accurate. Monte Carlo simulation is a method that can be applied to conduct risk analysis with limited available data. This research began with the identification of potential risks that might occur in bridge construction, resulting in 24 types of risks. Risk assessment was conducted based on the list of risks identified by the contractor’s employees who were working on a bridge project. The results of the risk assessment were then analyzed and prepared for the Monte Carlo simulation process. The simulation results showed accurate outcomes with a total of 10,000 simulations. The greatest risks occur when a worker falls, which has a risk index of 12.5961, and a girder collapses during installation, which has a risk index of 16.1873.

1 January 2024 in Matriks Teknik Sipil
Verified
Journal Article
Open access
PDF file
WHWidi Hartono
Widi Hartono
DHDewi Handayani
Dewi Handayani
FSFarasheila Sabrina
Farasheila Sabrina
Proyek jembatan beton merupakan proyek pembangunan infrastruktur dengan kecelakaan kerja terbanyak. Berdasarkan data tersebut dilakukan penelitian apa saja potensi risiko kecelakaan kerja yang mendominasi dan bagaimana cara pengendalian dan penanggulangan kecelakaan kerja pada proyek kontruksi jembatan beton. Metode analisis penelitian ini menggunakan metode semi-kuantitatif deskriptif. Penelitian ini menggunakan metode pengumpulan data berupa penyebaran kuesioner untuk analisis kuantitatif dan wawancara untuk analisis kualitatif. Instrumen penelitian mengacu pada standar Australia/New Zealand Standard (AS/NZS) 4360:2004 dengan 3 tahap yaitu identifikasi risiko, penilaian risiko, dan respons risiko. Berdasarkan hasil analisis dan pembahasan pada proyek jembatan beton dapat disimpulkan bahwa risiko yang mendominasi yaitu pekerjaan pengukuran kerangka kontrol vertikal dan horizontal pada pekerjaan persiapan, pekerjaan fondasi pada pekerjaan struktur bawah jembatan, dan pekerjaan pemasangan girder pada pekerjaan struktur atas jembatan. Respons risiko tersebut yaitu dengan menggunakan alat pelindung diri (APD) dan membuat standar operasional prosedur (SOP).

1 February 2020 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
DHDewi Handayani
Dewi Handayani
WHWidi Hartono
Widi Hartono
ABAlfin Wirawan Bagaskara
Alfin Wirawan Bagaskara
Cycling to school is a Surakarta City government program to reduce the use of motorbikes by students. The development of facilities for cyclists by the City of Surakarta is still limited to certain areas. On the other hand, the traffic conditions when going to school and coming home from school are problems and considerations for students to cycle to school. This paper will examine the factors that influence junior high school students to cycle to school in Surakarta using the ANP (Analytic Network Process) method. There are four main factors and 16 sub-factors of each of the main factors used in this paper. The main factors are behaviour, physical condition, social conditions, and environmental conditions. The results of the study that the environmental conditions are the greatest factor students cycling to school. When reviewed as a whole, these factors are calculated simultaneously, and found the five most influential factors. The five factors are bike ownership, health, parent’s salary, gender and no cycling friends.

15 April 2024 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
WHWidi Hartono
Widi Hartono
DHDewi Handayani
Dewi Handayani
HRHanis Cahya Rhamadani
Hanis Cahya Rhamadani
Indonesia as the population increases, but this is inversely proportional to the availability of land so that the idea of developing high-rise buildings arises. Building projects are high-risk projects, at height there are many hazards such as falling, slipping, falling materials, and electrocution. This study uses a simple linear regression method to see how height affects work accidents and conducts a risk assessment. The results of large-sized companies, height has a significant effect on the risk of falling from height by 30.5%, the risk of eye, skin and respiratory disorders by 14.8% and the risk of being pinched at the work site by 21.4%. In medium-sized companies, height has a significant effect on the risk of falling from height by 15.6% and the risk of eye, skin and respiratory disorders by 11.7%. In small-size companies, height has a significant effect on the risk of falling from height by 12.2% and the risk of being hit by materials from above by 45.5%. The result of the risk assessment for all company qualifications is falling from a height with an average risk index value for large companies of 15.36 (high risk), medium companies 16.52 (high risk) and small companies 8.47 (medium risk).