Marlon Cordoba-Ramirez

Dr. Marlon Cordoba-Ramirez

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 February 2024 in Environmental Science and Pollution Research
Verified
Journal Article
Open access
PDF file
MCMarlon Cordoba-Ramirez
Marlon Cordoba-Ramirez
FCFarid Chejne
Farid Chejne
JAJader Alean
Jader Alean
CGCarlos A. Gómez
Carlos A. Gómez
ÁNÁfrica Navarro-Gil
África Navarro-Gil
GGGloria Gea
Gloria Gea
In this study, an experimental strategy to obtain biochar and activated carbon from torrefied palm kernel shell as an efficient material for CO2 removal was evaluated. Biochar was obtained by slow pyrolysis of palm kernel shell at different temperatures (350 °C, 550 °C, and 700 °C) and previously torrefied palm kernel shell at different temperatures (220 °C, 250 °C, and 280 °C). Subsequently, activated carbons were prepared by physical activation with CO2 from previously obtained biochar samples. The CO2 adsorption capacity was measured using TGA. The experimental results showed that there is a correlation between the change in the O/C and H/C ratios and the functional groups –OH and C=O observed via FTIR in the obtained char, indicating that both dehydration and deoxygenation reactions occur during torrefaction; this favors the deoxygenation reactions and makes them faster through CO2 liberation during the pyrolysis process. The microporous surface area shows a significant increase with higher pyrolysis temperatures, as a product of the continuous carbonization reactions, allowing more active sites for CO2 removal. Pyrolysis temperature is a key factor in CO2 adsorption capacity, leading to a CO2 adsorption capacity of up to 75 mg/gCO2 for biochar obtained at 700 °C from non-torrefied palm kernel shell (Char700). Activated carbon obtained from torrefied palm kernel shell at 280 °C (T280-CHAR700-AC) exhibited the highest CO2 adsorption capacity (101.9 mg/gCO2). Oxygen-containing functional groups have a direct impact on CO2 adsorption performance due to electron interactions between CO2 and these functional groups. These findings could provide a new experimental approach for obtaining optimal adsorbent materials exclusively derived from thermochemical conversion processes.

16 May 2025 in Environments
Verified
Journal Article
Open access
PDF file
JAJader Alean
Jader Alean
MBMarlon Bastidas-Barranco
Marlon Bastidas-Barranco
EBEfrain Boom-Carcamo
Efrain Boom-Carcamo
JLJuan Carlos Maya López
Juan Carlos Maya López
JMJuan C Maya
Juan C Maya
MCMarlon Cordoba-Ramirez
Marlon Cordoba-Ramirez
This work presents an effective design of a strategy to manage biomass waste (empty fruit bunch—EFB, kernel shell, and fiber) available from the processing of oil palm (Elaeis guineensis) in Colombia as a renewable energy source. This type of study is conducted for the first time in the country, and the proposed strategy is structured in four phases. Firstly, an inventory of available biomass waste was prepared based on information from 45 African palm oil companies of the approximately 70 that exist in the country. It was determined that the country had about 2762 kt of available waste (63.64% EFB, 12.55% kernel shell, and 23.81% fiber) for the year 2023. The estimates were conducted using a model that correlates processing capacity, the biomass generated, and the biomass demanded. The validation was performed using national reports. Subsequently, the minimum number (six) of storage centers in Colombia, where the largest amount of biomass can be stored, was determined. The center of gravity method was used to find the geographical location of each bulk storage center (municipality of Aracataca, Agustín Codazzi, San Martín, Puerto Wilches, Castilla La Nueva, and Cabuyaru). The next step was to determine the transportation costs as a decision criterion to select the best bulk storage center. When the required storage capacity does not exceed 211 kt·year−1, Agustín Codazzi is the best option because it has the lowest transportation cost (USD 1.01·t−1). When the storage capacity requirements exceed 211 kt·year−1 but are less than 423 kt·year−1, then Puerto Wilches and/or Aracataca are the best options (transportation cost of USD 1.7·t−1). In all cases, Cabuyaru has the highest costs (USD 6.56·t−1). Finally, an energy potential of 50,196 × 106 GJ·year−1 for the collected biomass was estimated, which makes this kind of waste an environmental alternative that could replace coal in Colombia.

24 February 2026 in INGE CUC
Verified
Journal Article
Open access
MCMarlon Cordoba-Ramirez
Marlon Cordoba-Ramirez
LCLeonel Alfredo Noriega-De la Cruz
Leonel Alfredo Noriega-De la Cruz
MBMarlon Jose Bastidas Barranco
Marlon Jose Bastidas Barranco
DFDario Andres Serrano Florez
Dario Andres Serrano Florez
AAAndres Adolfo Amell Arrieta
Andres Adolfo Amell Arrieta
Este estudio presenta el desarrollo e implementación de un sistema de adquisición de datos (SAD.1) de bajo costo para el monitoreo en tiempo real de un sistema eólico instalado en una planta piloto Power to Gas (PtG), ubicada en la media Guajira. Con la finalidad de diseñar una herramienta funcional y económica que permitiera registrar y analizar el desempeño energético del sistema eólico, contribuyendo a la gestión eficiente de la planta piloto PtG. El sistema utiliza comunicación Modbus RTU bajo el estándar RS485, con un microcontrolador Arduino Uno y un módulo MAX485 para la conversión de señales a niveles TTL. Los datos son extraídos del inversor eólico y transmitidos vía puerto serial a una PC, donde un script en Python los procesa, promedia cada cinco minutos y almacena en archivos .CSV. Se lograron establecer perfiles operativos durante un año de monitoreo, identificando una mayor generación entre las 7:00 a.m. y 6:00 p.m., y baja o nula producción en horario nocturno. El SAD.1 permite evaluar el comportamiento del sistema eólico tanto de manera individual como integrado con el sistema fotovoltaico, aportando datos clave para optimizar la planificación y gestión energética de la planta PtG.

18 December 2025 in Energies
Verified
Journal Article
Open access
PDF file
MCMarlon Cordoba-Ramirez
Marlon Cordoba-Ramirez
MBMarlon Bastidas-Barranco
Marlon Bastidas-Barranco
Dario Andres Serrano FlorezDario Andres Serrano Florez
Dario Andres Serrano Florez
LCLeonel Alfredo Noriega De La Cruz
Leonel Alfredo Noriega De La Cruz
AAAndres Amell
Andres Amell
This study presents the operational assessment of a pilot-scale power-to-gas (PtG) facility located in La Guajira, Colombia, which integrates a 10 kW photovoltaic array and a 5 kW wind turbine to power a system with two anion exchange membrane (AEM) electrolyzer of 4.8 kW in total for green hydrogen production. Unlike most studies that rely on simulations or short-term evaluations, this study analyzes nine months of real operating data to quantify renewable energy availability, system capacity factors, and effective hydrogen output under tropical conditions. The results show that the hybrid system generated 7111 kWh during the monitoring period. The comparison of theoretical models with real-time energy production shows a low correlation between the data. The MBE ranged from 1253 to 2988 for the solar system, from −814 to 1013 for the wind system, and from 338 to 2714 for the hybrid system. The RMSE values obtained for each evaluated month ranged from 3179 to 3811 for the solar system, from 928 to 1910 for the wind system, and from 2310 to 4327 for the hybrid system, suggesting that the theoretical models tend to overestimate the energy production of the hybrid system in general terms. From the renewable energy produced in real conditions, 92 kg of hydrogen was produced at an average rate of 9 kg/month, considering the availability of wind and solar resources. However, approximately 300 kWh/month of renewable electricity remained unused because the removable generation did not meet the operating conditions of the electrolyzers, highlighting the importance of improved energy management and storage strategies. These findings provide a real scenario of power-to-gas system performance under Caribbean climatic conditions in Colombia, demonstrate the challenges of resource intermittency and system underutilization, and underline the importance of design systems that allow these intermittencies to be managed for the more optimal production of hydrogen from renewable sources. The outcomes contribute to the understanding of small-scale PtG systems in developing regions and support decision making for future scaling and replication of hybrid renewable–hydrogen infrastructures.