Cheng Long

Dr. Cheng Long


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 November 2025 in Energies
Verified
Journal Article
Open access
PDF file
JSJinhao Shen
Jinhao Shen
HZHua Zhang
Hua Zhang
XSXueneng Su
Xueneng Su
YGYiwen Gao
Yiwen Gao
KZKun Zheng
Kun Zheng
XLXinbo Liu
Xinbo Liu
If unplanned off-grid events occur in microgrids, stable operation is disrupted. In particular, dynamic unbalanced loads, power pulse, and voltage changes also lead to system instability. To overcome these issues, this paper develops a smooth droop control strategy for multi-functional inverters. By introducing a QPR (quasi-proportional resonant) controller, the load voltage regulator is designed to compensate for the harmonic and unbalanced voltages of microgrids. Compared with traditional strategies, the proposed multi-functional inverter can reduce voltage pulses by more than 60%, and the off-grid voltage THD (total harmonic distortion) is decreased from 7% to less than 3%. At the same time, dynamic unbalanced loads and non-linear dynamic loads are both considered, and the derived strategy achieves smoother grid-connected and off-grid switching. In grid-connected mode (the microgrid connects to the distribution network at the PCC), the peak voltages and overshoots across transitions are definitely decreased, and continuous monitoring shows that the grid’s current THD stays steadily below 3%. This meets compatibility requirements, avoids harmonic interference on distribution networks, and follows the core principle of IEC TS 62898-1:2023. The simulation and experimental results verify the effectiveness of the proposed multi-function inverter control strategy for grid-connected inverters.

9 September 2025 in Energies
Verified
Journal Article
Open access
PDF file
HZHua Zhang
Hua Zhang
XSXueneng Su
Xueneng Su
ZYZongmin Yu
Zongmin Yu
JWJING WANG
JING WANG
CLCheng Long
Cheng Long
High impedance grounding faults (HIGFs) are a common yet difficult-to-detect issue in distribution networks. Characterized by low fault currents and prolonged durations, they pose a significant risk of triggering secondary hazards such as wildfires. Existing HIGF prevention and control technologies face challenges in effectively addressing arc ignition, fault current limitation, and wildfire mitigation. To tackle these limitations, this paper proposes a novel asymmetric operational structure incorporating a single-phase isolation transformer and supplementary edge-phase capacitance. Through theoretical modeling and simulation analysis, the interrelations among fault current, phase voltage, zero-sequence voltage, and HIGF characteristics are systematically explored. A coordinated control strategy is developed to optimize three-phase voltage distribution within the distribution network. Simulation results demonstrate that the proposed configuration significantly reduces edge-phase voltages, suppresses fault current levels, prevents arc initiation, extends arc ignition delay times, and consequently mitigates wildfire risk. This study presents a new technical pathway for HIGF prevention and control, offering both practical engineering value and theoretical insight.

26 September 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
CLCheng Long
Cheng Long
HZHua Zhang
Hua Zhang
XSXueneng Su
Xueneng Su
YGYiwen Gao
Yiwen Gao
WLWei Luo
Wei Luo
The operational modes and fault characteristics of distribution networks incorporating distributed generation are becoming increasingly complex. This complexity increases the difficulty of predicting switch control action times, leads to scattered samples and data scarcity, and imposes higher demands on rapid fault isolation and load transfer control following system failures. To address this issue, this paper proposes a switch action time prediction and synchronous load transfer control method based on Bayesian optimization of bidirectional long short-term memory networks (Bo-BiLSTM). A distribution network simulation model incorporating distributed generation was constructed using MATLAB/Simulink. Three-phase voltage and current at the point of common coupling (PCC) were extracted as feature parameters to establish a switch operation timing database. Bayesian optimization was employed to tune the BiLSTM hyperparameters, constructing the Bo-BiLSTM prediction model to achieve high-precision forecasting of switch operation times under fault conditions. Subsequently, a load-synchronized transfer control strategy was proposed based on the prediction results. A dynamic delay mechanism was designed to achieve “disconnect-first, reconnect-later” sequential coordinated control. Physical experiments verified that the time difference between disconnection and reconnection was controlled within 2–12 ms, meeting the engineering requirement of less than 20 ms. Results demonstrate that the proposed control method enhances switch operation time prediction accuracy while effectively supporting rapid fault isolation and seamless load transfer in distribution networks, thereby improving system reliability and control precision.

23 July 2026 in Processes
Verified
Journal Article
Open access
PDF file
HZHua Zhang
Hua Zhang
CLCheng Long
Cheng Long
XSXueneng Su
Xueneng Su
YGYiwen Gao
Yiwen Gao
QXQian Xie
Qian Xie
KZKun Zheng
Kun Zheng
This paper proposes a dynamic intelligent method for voltage violation management in high-renewable-penetration distribution networks. The method employs a dual-agent architecture: DERMS_Agent coordinates task scheduling, data management, and computational resource allocation, while Solution_Agent performs three-phase unbalanced power flow calculation and MIQP-based voltage violation joint optimization. Four key technical contributions are presented. (i) An asymmetric nodal admittance matrix is developed to incorporate transformer tap-phase-shift and capacitor branches within a unified formulation. (ii) Five categories of analytical sensitivities are systematically derived, covering transformer tap, phase shift, and capacitor compensation effects for both voltage regulation and harmonic suppression. (iii) A three-parameter MIQP joint optimization model is constructed with voltage deviation minimization as the objective and three-phase unbalance and resonance avoidance as constraints. (iv) A two-stage hybrid solution strategy combining Ipopt continuous relaxation with Gurobi neighborhood enumeration is designed to achieve real-time solvability. Validation on a real 10 kV feeder with 91 transformer areas over 768 time sections (8 days) demonstrates a 95.6% voltage violation resolution rate within the first three polling cycles and an average single-section solution time of 0.83 s, satisfying the real-time requirements of 15 min operational control cycles.

18 September 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
HZHua Zhang
Hua Zhang
CLCheng Long
Cheng Long
XSXueneng Su
Xueneng Su
YGYiwen Gao
Yiwen Gao
WLWei Luo
Wei Luo
As the penetration rate of distributed power sources increases and distribution network structures grow increasingly complex, the uncertainty in switch action control during load transfer has become a critical issue affecting grid safety and reliability. Traditional control methods based on precise probability-based predictive control are susceptible to bias introduced by prior settings under small-sample conditions, making it difficult to meet the stringent requirements of time-synchronized control. To address this, this study proposes an imprecise probability-based synchronous load transfer control method for distribution networks. By integrating the Imprecise Dirichlet model (IDM) with a Naive Credal Classifier (NCC), it constructs an interval predictive control model for switching action timing. This approach effectively mitigates the prior-dependency issue and enhances estimation robustness under small sample conditions. Combined with a dynamic delay strategy, this approach strictly controls the interval between disconnection and reconnection actions within 20 ms, preventing circulating current risks and ensuring transfer reliability. Simulation and experimental results demonstrate that the proposed method outperforms traditional Bayesian classifiers in both time prediction control accuracy and model robustness, providing a theoretical foundation and a reference for engineering applications for secure action control in distribution networks.

11 December 2025 in Processes
Verified
Journal Article
Open access
PDF file
CLCheng Long
Cheng Long
HZHua Zhang
Hua Zhang
XSXueneng Su
Xueneng Su
YGYiwen Gao
Yiwen Gao
WLWei Luo
Wei Luo
The operational modes and fault characteristics of distribution networks incorporating distributed generation are becoming increasingly complex. This complexity increases the difficulty of predicting switch control action times and leads to scattered samples with data scarcity. Consequently, it imposes higher demands on rapid fault isolation and load transfer control following system failures. To address this issue, this paper proposes a switch action time prediction and synchronous load transfer control method based on Bayesian optimization of bidirectional long short-term memory (Bo-BiLSTM) networks. A distribution network simulation model incorporating distributed generation was constructed using MATLAB/Simulink (R2023a). Three-phase voltage and current at the Point of Common Coupling (PCC) were extracted as feature parameters to establish a switch operation timing database. Bayesian optimization was employed to tune the BiLSTM hyperparameters, constructing the Bo-BiLSTM prediction model to achieve high-precision forecasting of switch operation times under fault conditions. Subsequently, a load-synchronized transfer control strategy was proposed based on the prediction results. A dynamic delay mechanism was designed to achieve “open first and then close” sequential coordinated control. Physical experiments verified that the time difference between opening and closing was controlled within 2–12 milliseconds (ms), meeting the engineering requirement of less than 20 ms. The results demonstrate that the proposed control method enhances switch operation time prediction accuracy while effectively supporting rapid fault isolation and seamless load transfer in distribution networks, thereby improving system reliability and control precision.