Adriana Jeremy Luna araya

Mrs. Adriana Jeremy Luna araya


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 May 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AAAdriana Jeremy Luna araya
Adriana Jeremy Luna araya
Rodrigo F. HerreraRodrigo F. Herrera
Rodrigo F. Herrera
KCKaren Castañeda
Karen Castañeda
Edison AtencioEdison Atencio
Edison Atencio
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
The design phase is critical in construction projects, as it directly impacts cost, quality, and execution efficiency. However, it suffers from structural deficiencies in communication, coordination, and early problem detection, leading to delays, cost overruns, and inefficiencies. While Lean Construction has been widely applied in execution phases, its adoption in design remains fragmented, lacking a clear framework for identifying and evaluating Lean tools in this context. This study aims to identify, classify, and evaluate Lean tools applicable to the building design phase, emphasizing their functionalities, benefits, and limitations. A systematic literature review and expert validation process led to the identification of 16 Lean tools and 26 design-related functionalities. Among these tools, Building Information Modeling (BIM), Last Planner System (LPS), and Agile Design Management (ADM) were identified as the most impactful, collectively addressing 88% of design functionalities. Expert insights revealed that ADM improves task control and decision-making clarity, LPS reduces uncertainty and enhances workflow reliability, and BIM strengthens coordination and early conflict detection. This study provides a structured perspective on Lean tool integration during design, highlighting their benefits and limitations and offering guidance for their implementation. The findings contribute to improving design efficiency, minimizing waste, and fostering collaboration in construction projects.