Clarissa Notariano Biotto

Dr. Clarissa Notariano Biotto

Federal University of São Carlos
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 October 2021 in Buildings
Verified
Journal Article
Open access
PDF file
Eduardo I. Galaz-DelgadoEduardo I. Galaz-Delgado
Eduardo I. Galaz-Delgado
Rodrigo F. HerreraRodrigo F. Herrera
Rodrigo F. Herrera
Edison AtencioEdison Atencio
Edison Atencio
Felipe Muñoz La RiveraFelipe Muñoz La Rivera
Felipe Muñoz La Rivera
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
There is no comprehensive understanding of the problems that may impact the performance of the different actors that participate in the design of construction projects. In the absence of clarity about the problems and challenges that may impact the interactions, it is not possible to propose action plans to optimize the performance of the design teams. Therefore, this study proposes to identify the main problems and challenges in the interactions of design teams in building projects. A mixed review method is used to integrate bibliometric reviews, systematic reviews, and social network analysis to build a complete picture of the reviewed topic while highlighting certain key areas to ensure in-depth research. To achieve the objective of this work, the research was divided into three stages: (1) study of interactions in design teams; (2) identification of problems in design team interactions; and (3) study of problems in design team interactions. Through this study, four current major trends of research were identified: (1) Collaboration and BIM; (2) Design teams in the construction industry; (3) Design management; and (4) Collaborative design methodologies and processes. In addition, the most relevant problems or challenges within design team interactions arise in communication, collaboration, coordination, trust, and role identification.

1 June 2015 in Ambiente Construído
Verified
Journal Article
Open access
PDF file
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
CFCarlos Formoso
Carlos Formoso
EIEduardo Luis Isatto
Eduardo Luis Isatto
Um modelo BIM é uma representação digital de uma edificação, combinando informações tridimensionais e não-geométricas. Uma vez associado com as durações de atividades ou etapas da construção, o modelo resultante (modelo BIM 4D) pode ser utilizado para projetar e planejar sistemas de produção de empreendimentos de construção através da visualização do plano de execução da obra. Em geral, os estudos sobre o uso combinado da modelagem 4D e BIM realizados até este momento tem tido como foco decisões acerca do planejamento de processos construtivos específicos, dedicando pouca atenção quanto à implementação de modelos BIM 4D na gestão de sistemas de produção no contexto organizacional de empresas de construção. O presente trabalho tem como objetivo propor um método para apoiar a gestão de sistemas de produção em empreendimentos de construção através do uso da modelagem BIM 4D para o projeto do sistema de produção e planejamento da produção. Esta pesquisa adota a design science research como modo de produção de conhecimento, envolvendo quatro estudos empíricos em três empresas de construção de edificações residenciais. A principal contribuição da pesquisa consiste no método para uso de BIM 4D na gestão de sistemas de produção em empreendimentos de construção, além da identificação de um conjunto de benefícios que podem ser esperados a partir do uso dos modelos BIM 4D na gestão de sistemas de produção no contexto de empreendimentos de construção.

1 December 2017 in Proceedings of the Institution of Civil Engineers - Engineering Sustainability
Verified
Journal Article
Open access
FCFernanda Justin Chaves
Fernanda Justin Chaves
PTPatricia Tzortzopoulos
Patricia Tzortzopoulos
CFCarlos Torres Formoso
Carlos Torres Formoso
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
There is a large stock of solid-wall homes in the UK with poor thermal insulation and low energy performance. Although the UK government has supported efforts to improve these buildings, the identification of appropriate technical solutions that effectively improve the existing stock remains challenging. This research investigates how four dimensional building information modelling (4D BIM) could improve the retrofit of social housing, specifically that of ‘no-fines’ solid-wall homes, through the development of what-if scenarios that enable the analysis of alternative solutions considering costs, energy performance and disruption to users. This paper focuses on the use of 4D building information models to evaluate disruption to end users. The results indicate that the development of such models supports a better understanding of the retrofit process on site. It also supports the definition of production plans with as minimal disruption as possible to users while delivering energy-oriented and cost-effective solutions.

6 May 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AAAdriana Jeremy Luna araya
Adriana Jeremy Luna araya
Rodrigo F. HerreraRodrigo F. Herrera
Rodrigo F. Herrera
KCKaren Castañeda
Karen Castañeda
Edison AtencioEdison Atencio
Edison Atencio
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
The design phase is critical in construction projects, as it directly impacts cost, quality, and execution efficiency. However, it suffers from structural deficiencies in communication, coordination, and early problem detection, leading to delays, cost overruns, and inefficiencies. While Lean Construction has been widely applied in execution phases, its adoption in design remains fragmented, lacking a clear framework for identifying and evaluating Lean tools in this context. This study aims to identify, classify, and evaluate Lean tools applicable to the building design phase, emphasizing their functionalities, benefits, and limitations. A systematic literature review and expert validation process led to the identification of 16 Lean tools and 26 design-related functionalities. Among these tools, Building Information Modeling (BIM), Last Planner System (LPS), and Agile Design Management (ADM) were identified as the most impactful, collectively addressing 88% of design functionalities. Expert insights revealed that ADM improves task control and decision-making clarity, LPS reduces uncertainty and enhances workflow reliability, and BIM strengthens coordination and early conflict detection. This study provides a structured perspective on Lean tool integration during design, highlighting their benefits and limitations and offering guidance for their implementation. The findings contribute to improving design efficiency, minimizing waste, and fostering collaboration in construction projects.

12 March 2021 in Gestão & Tecnologia de Projetos
Verified
Journal Article
Open access
PDF file
FAFelipe Miguel Rocha Andrade
Felipe Miguel Rocha Andrade
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
SSSheyla M. Baptista Serra
Sheyla M. Baptista Serra
O processo de orçamentação para licitação de uma obra pública ocorre por meio da composição de custos unitários e pesquisa de preços dos insumos registrados em planilhas orçamentárias. A fase inicial deste processo é o levantamento dos quantitativos de materiais e serviços extraídos dos diferentes projetos do edifício. Normalmente, o levantamento é realizado de forma manual e pode apresentar-se falho. Ciente disso e sabendo da importância da avaliação de custos para um empreendimento público, somado da obrigatóriedade do Building Information Modelling (BIM) em obras públicas a partir de 2021, neste trabalho estudou-se a aplicação do BIM para extração de quantitativos e precificação vinculada às especificações do Sistema Nacional de Pesquisa de Custos e Índices da Construção Civil (SINAPI). O método de pesquisa utilizado foi o estudo de caso de uma obra pública. Para isso, utilizou-se documentos da licitação, como a planilha orçamentária inicial e o projeto básico de arquitetura em CAD 2D. Foram feitas duas modelagens BIM: a primeira para a extração de quantitativos e comparação com dados da licitação; e a segunda para compor diretamente os custos da alvenaria estrutural baseado nos serviços do SINAPI. Por fim, o estudo demonstrou similaridade entre quantitativos extraídos do modelo BIM com o processo manual para a licitação, porém, para se utilizar os dados de custos do SINAPI é necessário que o modelo seja elaborado visando, especificamente, a orçamentação.

3 July 2019
Verified
Conference Paper
Open access
PMPaula Mota
Paula Mota
FMFernanda Machado
Fernanda Machado
Clarissa Notariano BiottoClarissa Notariano Biotto
Clarissa Notariano Biotto
RMRicardo Mota
Ricardo Mota
BMBruno Mota
Bruno Mota