Bohdan Dołżycki

Dr. Bohdan Dołżycki


Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2017 in Construction and Building Materials
Verified
Journal Article
Closed access
BDBohdan Dołżycki
Bohdan Dołżycki
Mariusz JaczewskiMariusz Jaczewski
Mariusz Jaczewski
CSCezary Szydlowski
Cezary Szydlowski

1 August 2019 in Journal of Traffic and Transportation Engineering (English Edition)
Verified
Journal Article
Open access
BDBohdan Dołżycki
Bohdan Dołżycki
Piotr JaskulaPiotr Jaskula
Piotr Jaskula

14 April 2015 in Road Materials and Pavement Design
Verified
Journal Article
Closed access
JJJozef Judycki
Jozef Judycki
Piotr JaskulaPiotr Jaskula
Piotr Jaskula
BDBohdan Dołżycki
Bohdan Dołżycki
Marek PszczołaMarek Pszczoła
Marek Pszczoła
Mariusz JaczewskiMariusz Jaczewski
Mariusz Jaczewski
MSMarcin Stienss
Marcin Stienss
The paper presents the issue of low-temperature transverse cracks which have developed in newly constructed base courses made of high-modulus asphalt concrete mix (HMAC). Numerous transverse cracks developed in the analysed HMAC base during the winter season before the pavement was actually completed, both at the transverse joint locations and in the areas between them. This had not happened so far on such a scale during road construction projects in Poland. The research included both field examination and laboratory testing of high-modulus asphalt concrete used for construction of the base course of the A1 motorway pavement, followed by computational analysis to investigate the causes and mechanism of the analysed pavement distress. The first part of this paper describes the pavement structure, gives the main requirements applicable to HMAC, and presents the results of the cracking survey, visual assessment and laboratory tests carried out on cores cut from the analysed pavement. Later in the article, the causes of cracking are analysed, taking into account the temperature of air and pavement, performance grade assessment of the bitumen used in the works, homogeneity of the constructed layer and calculated thermal stresses induced in HMAC layers. The examinations and analyses allowed to conclude that the main causes of cracking included too stiff mix, taking into account the climate of Poland, deviations from the pre-defined installation practice during the construction of the base course and leaving the HMAC surface unprotected by the overlying layers: binder and wearing courses during winter. Finally, compliance with the best construction practice during placement of HMAC mixes and use of softer or polymer-modified bitumens are indicated as being critical to avoiding distress of HMAC pavement courses.

1 January 2017 in Procedia Engineering
Verified
Journal Article
Open access
Marek PszczołaMarek Pszczoła
Marek Pszczoła
Mariusz JaczewskiMariusz Jaczewski
Mariusz Jaczewski
CSCezary Szydlowski
Cezary Szydlowski
JJJózef Judycki
Józef Judycki
BDBohdan Dołżycki
Bohdan Dołżycki

1 January 2017 in Procedia Engineering
Verified
Journal Article
Open access
ŁMŁukasz Mejłun
Łukasz Mejłun
JJJózef Judycki
Józef Judycki
BDBohdan Dołżycki
Bohdan Dołżycki

10 August 2017 in MATEC Web of Conferences
Verified
Journal Article
Open access
PDF file
JJJózef Judycki
Józef Judycki
Piotr JaskulaPiotr Jaskula
Piotr Jaskula
Marek PszczołaMarek Pszczoła
Marek Pszczoła
Dawid RysDawid Rys
Dawid Rys
Mariusz JaczewskiMariusz Jaczewski
Mariusz Jaczewski
MSMarcin Stienss
Marcin Stienss
MATEC Web of Conferences, open access proceedings in Materials science, Engineering and Chemistry