The increasing sophistication of grid-connected photovoltaic (GCPV) systems necessitates advanced fault detection and diagnosis (FDD) methods to ensure operation efficiency and security. In this paper, a novel two-stage hybrid AI architecture is analyzed that couples an autoencoder using Long Short-Term Memory (LSTM) for unsupervised anomaly detection with an RF classifier for focused fault diagnosis. The architecture is critically compared to that of a baseline-only RF baseline on a synthetic dataset. The results of this two-stage hybrid AI show a strong overall accuracy of (83.1%). The hybrid model’s first stage trains only on unlabeled healthy data, reducing the reliance on extensive and often unavailable labeled fault datasets. This design has the safety-critical advantage of marking unfamiliar faults as anomalies instead of committing to a misclassification. By integrating anomaly detection with classification, the architecture enables early stage screening of faults and targeted categorization, even in data-scarce scenarios. This offers a scalable, interpretable solution suitable for deployment in real-world GCPV systems where robustness and early detection are critical. While the method exhibits reduced sensitivity to subtle or recurring faults, it demonstrates strong reliability in confidently detecting distinct and significant anomalies. Additionally, the approach improves interpretability, facilitating clearer identification of performance constraints such as the autoencoder’s moderate fault sensitivity (AUC = 0.61). This study confirms the hybrid approach as a very promising FDD solution, in which the architectural advantages of safety and maintainability offer a more worthwhile proposition to real-world systems than incremental improvements in a single accuracy measure.
1 January 2025 in International Transactions on Electrical Energy Systems
Electric vehicle (EV) technologies have become crucial in the current times as they are projected to be one of the major contributors to energy transition in global transportation and power system. They have been identified to offer social, technical, economic, and environmental benefits. Solar and hybrid EV chargers offer more significant advantages over grid‐tied chargers. Despite the many advantages that EVs bring, there are also drawbacks associated with this technology. This paper therefore provides an extensive review on EV charging technologies and methods, international standards, and protocols. The work reviews solar power for EV charging stations, where grid‐tied and off‐grid systems are intensely examined. The system architecture and configuration, and charging station layouts are presented. An in‐depth comparative review of charging technologies’ infrastructure Capital Expenditure (CAPEX) and Operational Expenditure (OPEX) cost analysis is examined. Eight global solar EV charging projects are closely analyzed and compared. From these case studies, lessons learnt and best practices are derived and a summary is provided. The challenges and future trends are also reviewed and presented in this work. The review presented in this work is useful to a wide range of individuals and groups, including but not limited to governments, potential buyers, policymakers, and researchers.
This paper presents a scenario-based, Gaborone-oriented surrogate-feeder study using a modified IEEE 69-bus radial test feeder remapped onto representative Gaborone urban functional zones, to test whether coordinated siting and control of EV charging stations (EVCS), photovoltaic (PV) generation, and battery energy storage (BESS) can increase the EV charging load a feeder accepts without further degrading its already non-compliant evening-peak voltage (below the ANSI C84.1 0.95 p.u. limit even before any EVCS, PV, or BESS is added). The capacities reported are therefore incremental no-further-degradation capacities rather than standard feasible hosting capacities and should not be read as utility-specific EV connection limits. Four scenarios are examined: an uncoordinated baseline, unmanaged PV/BESS addition, Adaptive Dandelion Optimizer (ADBO)-based joint siting/sizing of EVCS, PV, and BESS with smart-inverter Volt-VAR/Volt-Watt control, and stochastic/high-penetration stress testing. Uncoordinated PV/BESS addition is found to introduce a separate midday overvoltage and reverse-flow risk without resolving the pre-existing undervoltage. Coordinated ADBO-based siting adds substantial incremental EVCS capacity without further lowering the minimum voltage, and Volt-VAR control adds further support at the evening peak by using otherwise-idle nighttime PV inverter capacity; neither intervention achieves full statutory compliance. A stochastic cloud-transient test also reveals a rapid substation power ramp that a voltage-compliance check alone would miss. ADBO is benchmarked against PSO, a real-coded GA, and GWO: it reaches a comparable best-case objective value but is less consistent across runs and converges more slowly, so it is presented as a tested candidate rather than a demonstrated superior method. The principal limitation of this study is that the feeder, load, irradiance, and algorithm-comparison data are a transparent surrogate and sensitivity analysis rather than measured utility data; the results should accordingly be interpreted as a methodological demonstration of coordinated EVCS-PV-BESS planning rather than a validated assessment of Botswana Power Corporation’s Gaborone network.
1 April 2026 in IOP Conference Series: Earth and Environmental Science
The research objective of this study is to review two Synchronous Reference Frame Phase Locked Loop (SRF-PLL) controllers on the performance of a grid-tied Solar Photovoltaic System (SPVS) for industrial applications. This study contributes to a better understanding of Phase Locked Loop (PLL) controllers, their effect on the performance of Photovoltaic (PV) system and the economic analysis of PV systems to assists Khoemacau Copper Mining (KCM) mine and researchers in making decisions in the same field. In this paper a grid-tied SPVS was modelled using the MATLAB software. The irradiance was varied from 500 w/m2 to 1000 w/m2 and the frequency of the grid was changed from 50 Hertz to 2 Hertz, output graphs of the SPVS were extracted and reviewed. The economic analysis was performed by calculating the economic indicators of a project. From the two SRF-PPL controllers, SRF-PLL 1 controller has proven to provide better grid synchronization even during frequency changes. The PV system indicated a levelized cost of electricity (LCOE) of BWP 0.27/kWh (USD 0.02/kWh) and a payback period of 4.2 years. The study offers a thorough and visually appealing report comparing the two SRF-PLL controllers that are used to synchronize the SPVS with the grid. The study also fills in the knowledge gap about the two-capacitor Direct Current-Direct Current (DC-DC) boost converter and most importantly; by showing the current prices of PV systems, this literature has offered financial estimates for the present costs of industrial PV systems.