Yuhui Jin

Dr. Yuhui Jin


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 March 2026 in Construction and Building Materials
Verified
Journal Article
Closed access
WZWanmao Zhang
Wanmao Zhang
DLDunwen Liu
Dunwen Liu
KCKunpeng Cao
Kunpeng Cao
YJYuhui Jin
Yuhui Jin
YTYu Tang
Yu Tang

15 November 2024 in Journal of Civil Structural Health Monitoring
Verified
Journal Article
Closed access
PDF file
DLDunwen Liu
Dunwen Liu
YJYuhui Jin
Yuhui Jin
YTYu Tang
Yu Tang
CKCao Kunpeng
Cao Kunpeng
HZHuanlin Zhang
Huanlin Zhang

2 September 2025 in Buildings
Verified
Journal Article
Open access
PDF file
DLDunwen Liu
Dunwen Liu
JZJimin Zhong
Jimin Zhong
YZYupeng Zhang
Yupeng Zhang
YJYuhui Jin
Yuhui Jin
To address the challenge of determining the borehole layout scheme in the practical application of high-pressure gas expansion rock breaking, this study takes the excavation of the safety passage at Kaixuan Road Station on the North Extension Line 2 of Chongqing Metro Line 18 as the engineering background. The rock-breaking capacity was evaluated by analyzing the damaged zone volume caused by gas expansion using FLAC3D 6.0 numerical simulation software, and vibration monitoring was conducted for the historical buildings on the surface. This study revealed the following: (1) When the borehole depth is 1.2 m and the charge length is 0.6 m, the optimal angle is 70°, with the optimal vertical and horizontal spacing between holes being 1200 mm and 2000 mm, respectively. (2) The numerical simulations indicated that by adjusting the charge density, the optimized sandstone borehole network parameters could be applied to mudstone strata, and the rock-breaking effect was similar. The difference in the volume of the damaged zones obtained in the two strata was less than 3%. (3) The vibration analysis demonstrated that the peak particle velocity generated by high-pressure gas expansion rock fracturing at the ancient building directly above was 0.06316 cm/s, which was lower than the threshold value of 0.1 cm/s and approximately 67.95% lower than that of explosive blasting. Furthermore, when the tunnel depth exceeded 29 m, the vibration velocity of surface structures remained within the safety range. The results verified the feasibility of applying the same borehole network parameters to different strata, providing theoretical support for the practical application of high-pressure gas expansion rock fracturing technology in engineering projects.

18 October 2025 in Measurement
Verified
Journal Article
Closed access
KCKunpeng Cao
Kunpeng Cao
KHKong Kian Hau
Kong Kian Hau
DLDunwen Liu
Dunwen Liu
WZWanmao Zhang
Wanmao Zhang
YJYuhui Jin
Yuhui Jin

31 August 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DLDunwen Liu
Dunwen Liu
YZYupeng Zhang
Yupeng Zhang
JZJimin Zhong
Jimin Zhong
YJYuhui Jin
Yuhui Jin
With the development of subway transportation, how to excavate large-section tunnels and find more convenient and reliable support methods has become an issue that cannot be ignored. This paper addresses issues such as low construction efficiency of core rock columns during the construction of large-section subway tunnels in sandstone–mudstone interbedded geological conditions. It proposes an optimized support scheme that replaces traditional core rock columns with temporary steel supports (steel columns). Finite element analysis was used to compare the deformation of the surrounding rock when retaining the core rock columns, using temporary steel columns to replace the core rock columns, and not providing additional support. Five interlayer positions and four interlayer angles were analyzed to identify the most dangerous geological conditions. Based on this analysis, the reasonable spacing of the temporary steel columns was investigated. The results indicate that temporary steel columns and core rock columns can effectively reduce vertical deformation of the surrounding rock, with steel columns showing slightly better results. Replacing core rock columns with steel columns is feasible. To control tunnel rock mass deformation, this project should ensure that the spacing between temporary steel columns is maintained between 21.88 m and 56.80 m. However, in construction sections with good rock mass conditions, the spacing can be extended as long as safety is ensured.

2 December 2025 in Scientific Reports
Verified
Journal Article
Open access
DLDunwen Liu
Dunwen Liu
YJYuhui Jin
Yuhui Jin
KCKunpeng Cao
Kunpeng Cao
YTYu Tang
Yu Tang
CWChong Wang
Chong Wang
Low-disturbance excavation constitutes a critical technology for rock mass engineering in environmentally sensitive areas, exerting decisive impacts on environmental protection and construction efficiency. This study employs a combined methodology incorporating small-scale model tests, field measurements, and numerical simulations to systematically investigate multi-parameter borehole layout schemes in limestone strata. Through PVDF piezoelectric sensors installed on smallscale model borehole walls, this research precisely captured the dynamic borehole wall forces during high-pressure gas expansion for the first time, establishing reliable design parameters with peak expansion tube forces reaching 581 MPa and validating its hard rock fracturing capability. The fieldcalibrated FLAC3D numerical model systematically compared the dynamic response patterns of rock mass plastic zone and near-field vibrations to three controlling parameters: burial depth, horizontal borehole spacing, and expansion tube density, identifying the optimal parameter combination of horizontal borehole spacing at 1.5 m × 2.0 m and a borehole depth of 1.5 m (burial depth of 1.3 m). Field application has verified that this optimized drilling pattern significantly enhances hard rock fragmentation efficiency, induces dense fracture networks, and substantially reduces mechanical rockbreaking losses.