This study examines the modernization of the 61-4179 TVZ passenger coach for transporting light automobiles up to 3 tons, addressing the efficiency of multifunctional rail use. The objective was to assess how additional mass–dimensional loading influences strength, load distribution, and the dynamic stability of the vehicle–track system. Finite element simulations in ANSYS Workbench 2021 R2 determined stress distribution, deformations, and safety margins, while multibody dynamics modeling in Universal Mechanism evaluated wheel–rail contact forces, carbody accelerations, and stability coefficients. Field tests on curves with radii of 350 m and 300 m at 60 km/h validated the models. Carbody accelerations were 0.65–0.68 m/s2, below the 0.7 m/s2 regulatory limit; wheelset attack angles remained under 0.01 rad; and derailment safety coefficients were 1.6–1.8, all meeting international standards. Uniform load distribution maintained stability and suppressed oscillations. However, critical scenarios (wheel wear, extreme flange clearance, higher speeds) produced parameters approaching threshold values. To mitigate risks, clearance adjustment per δ0 standards, a 1:20 guard-rail inclination, and optimized crossing profiles are proposed. These measures reduced lateral dynamic forces by 12–15% and raised the strength coefficient by 1.2–1.3. The results confirm technical feasibility, operational safety, and extended service life, supporting sustainable multimodal transport development.
Seasonal groundwater rise of 2.5–3.0 m leads to full saturation of the lakeside slope of the railway embankment, significantly reducing the strength of clayey–sandy loam layers. Laboratory shear tests showed that saturation decreases the internal friction angle from 24–26° to 16–19°, while effective cohesion drops from 12–18 kPa to 0–3 kPa, identifying the 3–6 m depth interval as the critical weak zone. These parameters were incorporated into PLAXIS 2D/3D hydro-mechanical models to assess the embankment behaviour under three scenarios: natural conditions, high water level, and reinforced configuration. Under elevated water levels, lateral displacement toward the lakeside increased to 0.16–0.21 m, and the plastic strain zone expanded by a factor of 2.4, reducing the safety factor from FS ≈ 1.32 to below 1.10. The proposed stabilization system—replacement of a 1.5 m weak layer, installation of geotextile reinforcement, and application of a bituminous waterproofing layer—substantially improved stability, reducing maximum lateral displacement to 0.12 m (≈43% reduction) and restoring the safety factor to FS = 1.25–1.40. The results demonstrate that low-cost geosynthetic barriers provide an effective and practical engineering solution for maintaining the long-term stability of railway embankments exposed to seasonal inundation.
The purpose of the study is to establish compliance of the design of the modernized car with the requirements for safe operation. An option has been proposed for upgrading a passenger wagon to a Mobile Diagnostic Complex for transporting a combined vehicle equipped with appropriate flaw detection equipment intended for rail diagnostics. The authors have established the most optimal option for locating the diagnostic vehicle on board the Mobile Diagnostic Complex (MDC) wagon, taking into account the additional load from the vehicle. To achieve this goal, the article developed a three-dimensional model of the supporting structure of the wagon body, proposed a methodology and presented the results of a study of the stress-strain state of the wagon body, taking into account the additional weight of the wagon. The article develops a methodology for studying the natural frequencies of vibrations of the wagon body and develops a three-dimensional model of the wagon for calculating dynamic indicators in the Universal Mechanism software package. Taking into account the previously carried out strength calculations, as well as in order to maintain the factory life cycle indicators of the supporting structure of the wagon body, it is recommended to use the model in the first version.