In this paper, an analysis of the feasibility of photovoltaic installations for individual consumers in Poland was carried out. For this purpose, an author’s model of the feasibility of small-scale photovoltaic installations for individual consumers was developed, depending on the following: the adopted strategy for the installed capacity and the changing economic and social environment in which electricity from this installation will be produced. Based on the model built, the costs of obtaining electricity from a photovoltaic installation were determined, using the methodology of calculated costs of electricity production. The lifetime of a small photovoltaic installation is 20 years, during which time the conditions for generating electricity can change significantly. Accordingly, five states of the economic and social environment were determined, ranging from extremely unfavourable to extremely favourable. The total costs of procuring electricity in these states took into account the additional costs or benefits of changing the price of electricity additionally procured from the electricity grid, in years with less sunshine, or sold to the grid, in years with high sunshine, and the possibilities of taxing the production of that energy. Using the method of individual choice, which is an element of game theory, the optimal strategy for equipping the customer with a small photovoltaic installation was determined, taking into account the changing economic and social environment.
The European Union aims to achieve climate neutrality by 2050, with biogas and biomethane expected to play an increasingly important role in the decarbonisation of the energy system. This study investigates the economic and social determinants shaping the development of biogas production in European countries and identifies an optimal investment strategy for new biogas plants under varying environmental conditions. An expert–mathematical method was applied to assess and hierarchise twenty economic and social factors influencing biogas production, based on evaluations provided by 71 experts from eleven European countries. Subsequently, individual choice criteria derived from game theory were used to determine the optimal strategy for biogas plant construction under conditions of uncertainty. The results indicate that six determinants—EU-level production support mechanisms, investment costs, national support instruments, process efficiency improvements, community involvement, and agricultural raw material prices—account for 52.9% of the total impact on biogas development potential. Among the analysed investment options, large-scale biogas plants with an installed capacity of 3 MW were identified as the optimal strategy, offering the lowest unit production costs and the lowest risk of cost overruns across diverse economic and social environments. These findings provide policy-relevant insights for supporting efficient and socially acceptable biogas deployment in Europe.