Efpraxia  Giannopoulou

Efpraxia Giannopoulou

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 May 2023 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
NPNikolaos C Papadakis
Nikolaos C Papadakis
EGEfpraxia Giannopoulou
Efpraxia Giannopoulou
YYYiannis Yiannakoudakis
Yiannis Yiannakoudakis
GZGeorge Zidianakis
George Zidianakis
AKAvraam Kartalidis
Avraam Kartalidis
Sports centres constitute major energy consumers. This article presents the proposed energy performance upgrade process and the achieved results for the municipal sports centre in Arkalochori, Greece. The facility consists of a swimming pool centre, an outdoor 8 × 8 football court, and two tennis and basketball courts. It operates with considerably high energy consumption due to the lack of any measure towards its energy efficiency improvement since its initial construction in 2002. Due to the significantly high heating cost, the swimming pool centre remains operative only during the summer period. The energy performance upgrade of the facility was holistically approached through all possibly applicable passive and active measures: insulation of opaque surfaces and replacement of openings, construction of a new, bioclimatic enclosure for the swimming pool’s centre and conversion of the current outdoor facility to an indoor one, installation of heat pumps for indoor space conditioning and swimming pool heating, installation of a solar–combi system for domestic hot water production, upgrade of all indoor and outdoor lighting equipment and installation of a photovoltaic plant on the new enclosure’s roof for the compensation of the remaining electricity consumption. With the proposed measures, the municipal sports centre is upgraded to a zero energy facility. The payback period of the investment was calculated at 14 years on the basis of the avoided energy procurement cost. The swimming pool’s centre operation is prolonged during the entire annual period. This work has been funded by the Horizon 2020 project with the acronym “NESOI” and was awarded the public award of the “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.

3 November 2025 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
George S. StavrakakisGeorge S. Stavrakakis
George S. Stavrakakis
NSNikolaos Savvakis
Nikolaos Savvakis
DEDakanali Eirini
Dakanali Eirini
YYYiannis Yiannakoudakis
Yiannis Yiannakoudakis
SYSofia Yfanti
Sofia Yfanti
This article presents the accumulated technical and scientific knowledge from energy performance upgrade work in emblematic and essential municipal and public buildings in Crete and the Greek islands, such as the Venetian historical building Loggia, which is used as the Heraklion City Hall, the Natural History Museum of Crete, Pancretan Stadium, the municipal swimming pool of the municipality of Minoa Pediadas, the indoor sports hall in Leros, primary schools, high schools and a cultural center. Each one of the aforementioned buildings has a distinct use, thus covering almost all different categories of municipal or public buildings and facilities. The applied energy performance upgrade process in general terms is: (1) Mapping of the current situation, regarding the existing infrastructure and final energy consumption. (2) Formulation and sizing of the proposed passive measures and calculation of the new indoor heating and cooling loads. (3) Selection, sizing and siting of the proposed active measures and calculation of the new expecting energy sources consumption. (4) Sizing and siting of power and heat production systems from renewable energy sources (RES). Through the work accomplished and presented in this article, practically all the most technically and economically feasible passive and active measures were studied: insulation of opaque surfaces, opening overhangs, natural ventilation, replacement of openings, daylighting solar tubes, open-loop geo-exchange plants, refrigerant or water distribution networks, air-to-water heat pumps, solar thermal collectors, lighting systems, automation systems, photovoltaics etc. The main results of the research showed energy savings through passive and active systems that can exceed 70%, depending mainly on the existing energy performance of the facility. By introducing photovoltaic plants operating under the net-metering mode, energy performance upgrades up to zero-energy facilities can be achieved. The payback periods range from 12 to 45 years. The setup budgets of the presented projects range from a few hundred thousand euros to 7 million euros.

16 August 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
NPNikolaos C Papadakis
Nikolaos C Papadakis
EGEfpraxia Giannopoulou
Efpraxia Giannopoulou
YYYiannis Yiannakoudakis
Yiannis Yiannakoudakis
GZGeorge Zidianakis
George Zidianakis
AKAvraam Kartalidis
Avraam Kartalidis
Sport centers are significant energy consumers. This article outlines the engineering design for a comprehensive energy performance upgrade of the indoor sport hall in Arkalochori, Greece, and presents the projected results. The indoor sport hall constitutes a major sport facility in the mainland of Crete, hosting a broad cluster of sport municipal activities and the official basketball games of the local team in the 2nd national category. Having being constructed in the mid ‘90s, the facility exhibits very low thermal performance, with considerably high U-factors for all constructive elements (from 4 to 5 W/m2∙K), still use of diesel oil for indoor space heating and domestic heat water production and ineffective, old lamps and luminaries covering the lighting needs of the facility. The energy performance upgrade of the indoor sport hall was holistically approached, through all possibly applicable passive and active measures: insulation of opaque surfaces and replacement of openings, installation of new stone wool panels, installation of heat pumps for indoor space conditioning, elimination of diesel oil for any final energy use, installation of a solar-combi system for domestic hot water production, upgrade of all indoor and outdoor lighting equipment, installation of solar tubes on the main sport hall roof for natural lighting and installation of a photovoltaic plant on the same roof for the compensation of the remaining electricity consumption. With the proposed measures, the indoor sport hall is upgraded to zero energy facility. The payback period of the investment was calculated at 26 years, on basis of the avoided energy resources procurement cost. This work has been funded by the Horizon 2020 project with the acronym “NESOI” and was awarded with the public award of the “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.

28 October 2023 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
NPNikolaos C Papadakis
Nikolaos C Papadakis
EGEfpraxia Giannopoulou
Efpraxia Giannopoulou
YYYiannis Yiannakoudakis
Yiannis Yiannakoudakis
GZGeorge Zidianakis
George Zidianakis
AKAvraam Kartalidis
Avraam Kartalidis
Sports centers are significant energy consumers. This article outlines the engineering design for a comprehensive energy performance upgrade of the indoor sports hall in Arkalochori, Greece, and presents the projected results. The indoor sports hall constitutes a major sport facility on the mainland of Crete, hosting a broad cluster of sport municipal activities and the official basketball games of the local team in the 2nd national category. Having been constructed in the mid-1990s, the facility exhibits very low thermal performance, with considerably high U-factors for all constructive elements (from 4 to 5 W/m2∙K), still use of diesel oil for indoor space heating and domestic heat water production, and ineffective old lamps and luminaries covering the lighting needs of the facility. The energy performance upgrade of the indoor sports hall was studied, and the following passive and active measures were considered: Opaque-surfaces’ thermal insulation and openings’ replacement, stone wool panels, installation of heat pumps for indoor space conditioning, removal of diesel oil for any end use, production of domestic hot water from a novel solar-combi system, upgrade of lighting equipment, installation of solar tubes on the main sports hall roof for natural lighting as well as of a photovoltaic system for covering the remaining electricity consumption. With the proposed interventions, the studied building becomes a zero-energy facility. The payback period of the investment was calculated at 26 years on the basis of the avoided energy cost. This work was funded by the “NESOI” Horizon 2020 project and received the public award “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.