Dealing with and maintaining high-quality standards in the design and construction phases is challenging, especially for on-site construction. Issues like improper implementation of building components and poor communication can widen the gap between design specifications and actual conditions. To prevent this, particularly for energy-efficient buildings, it is vital to develop resilient, sustainable strategies. These should optimize resource use, minimize environmental impact, and enhance livability, contributing to carbon neutrality by 2050 and climate change mitigation. Traditional post-occupancy evaluations, which identify defects after construction, are impractical for addressing energy performance gaps. A new, real-time inspection approach is necessary throughout the construction process. This paper suggests an innovative guideline for prefabricated buildings, emphasizing digital ‘self-instruction’ and ‘self-inspection’. These procedures ensure activities impacting quality adhere to specific instructions, drawings, and 3D models, incorporating the relevant acceptance criteria to verify completion. This methodology, promoting alignment with planned energy-efficient features, is supported by BIM-based software and Augmented Reality (AR) tools, embodying Industry 4.0 principles. BIM (Building Information Modeling) and AR bridge the gap between virtual design and actual construction, improving stakeholder communication and enabling real-time monitoring and adjustments. This integration fosters accuracy and efficiency, which are key for energy-efficient and nearly zero-energy buildings, marking a shift towards a more precise, collaborative, and environmentally sensible construction industry.
Ninety percent of the existing building stock in Europe was built before 1990. These buildings are in urgent need for a significant improvement of energy-efficiency through renovation. State-of-the-art renovation solutions are available, but costly and lengthy renovation processes and incomprehensible technical complexities hinder the achievement of a wide impact at a European scale. This paper presents a research on Plug-and-Play (PnP) technologies supported by Building Information Modelling (BIM) to provide affordable, interchangeable and quick-installation solutions to overcome the main barriers of building deep renovation.
1 January 2015 in International Journal of 3-D Information Modeling
Collective Self-Organised (CSO) housing projects are an emerging trend in Europe. In these projects communities engage in co-design throughout the process. Little knowledge exists that can support CSOs with the process of managing their projects by using state-of-the-art building information (BI) technologies. The authors introduce a BI supported CSO housing design process that can support CSOs through all stages in the design process, from early conceptual location planning through to selection of interior finishing. They illustrate the project using a demonstrative illustration of a CSO housing design process. The paper will concentrate on the development of innovative Collaborative Design Technology (CDT) solutions. The tools will be demonstrated on the basis of an illustrative demonstration case in which the CSO-process is combined with an IFD (Industrial, Flexible and Durable) building system. The particular advantages for architectural design practice will be highlighted throughout and gaps in the literature addressed.
At present European buildings typically consume two to five times more energy than predicted at the design stage. An important cause of this performance gap is the discrepancies between the design specification and the As-Built condition. Such discrepancies are mainly due to the gaps in knowhow between design, production and construction professionals. Design is more and more contained into a virtual environment and loses touch with the physical production and construction sites. As the construction sector enters the Industry 4.0 era, Building Information Modelling (BIM) based Mixed Reality can intertwine virtual and real worlds to bridge the knowhow gaps.
Dealing with and maintaining high-quality standards in the design and construction phases is challenging, especially for on-site construction. Issues like improper implementation of building components and poor communication can widen the gap between design specifications and actual conditions. To prevent this, particularly for energy-efficient buildings, it's vital to develop resilient, sustainable strategies. These should optimize resource use, minimize environmental impact, and enhance livability, contributing to carbon neutrality by 2050 and climate change mitigation. Traditional post-occupancy evaluations, which identify defects after construction, are impractical for addressing energy performance gaps. A new, real-time inspection approach is necessary throughout the construction process. This paper suggests an innovative guideline for prefabricated buildings, emphasizing digital 'self-instruction' and 'self-inspection'. These procedures ensure activities impacting quality adhere to specific instructions, drawings, and 3D models, incorporating relevant acceptance criteria to verify completion. This methodology, promoting alignment with planned energy-efficient features, is supported by BIM-based software and Augmented Reality (AR) tools, embodying Industry 4.0 principles. BIM and AR bridge the gap between virtual design and actual construction, improving stakeholder communication and enabling real-time monitoring and adjustments. This integration fosters accuracy and efficiency, key for energy-efficient and Nearly Zero-Energy Buildings, marking a shift towards a more precise, collaborative, and environmentally sensible construction industry.