The factors influencing the qualitative and quantitative components of the result of surveying in open-pit mining using a quadcopter were identified and systematized, and the mathematical dependence of the influence of factors on the final error of surveying was determined. After a large number of field observations – numerous flights of a geodesic quadcopter over mining facilities – the subsequent mathematical justification of the results of the aerial photogrammetric surveying was made, which allowed to analyze the degree of participation in the final accuracy of the survey of each of the considered factors. The results of this study demonstrate the source of errors, which provide the surveyor with the opportunity to efficiently and competently carry out pre-flight preparation and planning of fieldwork. The study and subsequent consideration of the factors affecting the accuracy of surveying with the use of an unmanned aerial vehicle are the basis for the subsequent development and formation of a methodology for using a geodesic quadcopter in the conditions of open-pit mining.
1 January 2026 in International Journal of Engineering
Mining companies, that are mining minerals in difficult mining and geological conditions, regularly face the problem of ensuring the safety of mine workings from water breakthrough from overlying aquifers due to the lack of possibility of predicting the spread of the fracture zone above the mining face. Currently, there are direct methods of determining the geometric parameters of the water-conducting fracture zones above the excavation space. These methods are capital-intensive, allowing one to estimate the location of the upper boundary of the fracture zone at once, without the possibility of predicting it in advance. In this paper, we propose an approach to manage the state of the rock mass by predicting the height of the zone of water-conducting cracks depending on the changes in the size of the excavation space. The approach makes it possible to minimize the risk of man-made accidents and provide an operational forecast of the development of the fracture zone, taking into account the plans of mining operations.
Mining operations conducted beneath water-bearing strata pose significant risks associated with the development of water-conducting fracture zones in the overburden. The height criterion for this parameter is critical to ensuring the stability of underground mine workings and preventing the risk of water inrush incidents. The research is based on physical and numerical simulations and aims to forecast the development of the water-conducting fracture zone. The methodology is based on in situ hydrogeology data, geotechnical boreholes, physical 2D modeling of rock strata, discrete element modeling using UDEC, and finite–discrete element modeling using Prorock software. A physical model of layered rock mass is constructed to simulate unfilled excavation areas induced deformation under real polymetallic ore field conditions. Based on the results, relationships between vertical subsidence, layer curvature, inclination, and the height of the water-conducting fracture zone were obtained. Particular attention is given to the effects of tectonic discontinuities, chamber geometry, and backfilling on fracture development. A stepwise excavation sequence is simulated to reproduce field conditions and assess the evolution of stress and deformation fields in the overburden. The study reveals that the propagation of the fracture zone around a mine excavation adheres to a polynomial law, characterized by an increase in height concurrent with the expansion of the excavation. This approach enables the design of safe extraction strategies beneath aquifers or surface water bodies. The proposed framework is expected to enhance prediction accuracy and reduce uncertainties.
This paper introduces a technique for predictive assessment of changes in the position of power transmission towers and condition of overhead power lines, located in the zone of influence of displacements and deformations of the Earth's surface caused by mining activities. A special approach for monitoring the technical condition of towers and cables is proposed. It is intended to address the issue of controlling the condition of transmission lines that are under the influence of underground mining activities and to checkmate such impact.
The development of mineral resources requires predicting its possible impact on the undermined rock mass. The aim of this work is to ensure safe and efficient extraction and minimization of losses. This article considers the problem of formation of water conducting fracture zones in terms of its predictability using the finite elements method.
15 September 2020 in News of the Ural State Mining University
Relevance of the research topic. The paper shows main results of environmental parameters that affect the quality of 3D-models obtained by the photogrammetric method of surveying. Research objective. The article presents: the fundamental possibility of using a small-sized photogrammetric device for underground surveying and the parameters that affect the result of shooting in a confined low-light space. Research methods. Experiments included a set of independent serial photographs of a test site. To increase the results of experiments, object with a simple geometric shape have been used as test objects for extrapolating of the results of the survey to products of standard metal products. In these conditions, imitating abstract underground mine workings: with the lack of lighting, confined spaces, a small number of characteristic points in the background. The texture of the subject of photogrammetric survey and common geometric parameters of photo base accepted as studied factors. Various images were projected onto the test scene to form an artificial texture. Results and its applications. The experimental results confirm the possibility of using the proposed methods for identifying engineering communications nodes, oil and gas production facilities, elements of lifting machines and conductors in vertical mining devices. In addition, the authors performed an idea of improving the quality of photogrammetric models by projecting temporary artificial textures on the subject. The results of the work can be used for the improving of the methods of surveying, using digital photogrammetry technology Findings. It is possible to imrove the quality of digital photogrammetric models of engineering structures by projecting artificial textures onto them. The possibility of the creation of models of the subject increases the accuracy and controllability of the result. With increasing contrast and complexity of the texture being applied, digital photogrammetry algorithms better determine the correspondence between a pair of photographs.