Wenwei Wang

Dr. Wenwei Wang


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 January 2025 in Energy Science & Engineering
Verified
Journal Article
Open access
PQPeng‐Qi Qiu
Peng‐Qi Qiu
WWWenwei Wang
Wenwei Wang
KWKai Wang
Kai Wang
JNJian‐Guo Ning
Jian‐Guo Ning
XZXiao‐Qiang Zhang
Xiao‐Qiang Zhang
TCTing‐Ting Cai
Ting‐Ting Cai
Bolt support mechanisms represent a key technique to support the surrounding rock in coal mines. In deep rock engineering applications, the bolt‐supported structure of the surrounding rock of a deep roadway under high bearing stress may fail under dynamic loads such as those of blasting vibrations and earthquake motion. In this study, dynamic uniaxial compression tests were conducted on steel bar reinforced rock to investigate the rockbolt performance under dynamic loading. The deformation of the specimen surface and rockbolt was recorded during the test. The strengths and failure modes of the bolted rock samples were investigated. The results show that the bolt and rock deform asynchronously when the bolted specimen is subjected to a dynamic load, and the time of the asynchronous deformation of the specimens with different bolt angles is considerably different. When the stress wave acts along the direction of the bolt, it is more likely to cause the failure of the bolted specimen. Anchorage agents should be employed to realize the synchronous deformation of the bolt and rock mass. The slip and dislocation of the anchorage agent/rock surface and anchorage agent/bolt interface are the key factors influencing the failure of bolted specimens. The influence of a dynamic stress wave on the surrounding rock support structure of a deep roadway can be effectively reduced by improving the antisliding characteristics of the anchoring agent and increasing the bolt density. The research results can provide theoretical guidance and serve as a reference to realize the reinforcement engineering of underground permanent chambers and roadways.

3 February 2026 in Mining
Verified
Journal Article
Open access
PDF file
EOEgor Evgenevich Odintsov
Egor Evgenevich Odintsov
ZZZidong Zhao
Zidong Zhao
VGVladimir Nikolaevich Gusev
Vladimir Nikolaevich Gusev
KWKai Wang
Kai Wang
WWWenwei Wang
Wenwei Wang
Mining operations conducted beneath water-bearing strata pose significant risks associated with the development of water-conducting fracture zones in the overburden. The height criterion for this parameter is critical to ensuring the stability of underground mine workings and preventing the risk of water inrush incidents. The research is based on physical and numerical simulations and aims to forecast the development of the water-conducting fracture zone. The methodology is based on in situ hydrogeology data, geotechnical boreholes, physical 2D modeling of rock strata, discrete element modeling using UDEC, and finite–discrete element modeling using Prorock software. A physical model of layered rock mass is constructed to simulate unfilled excavation areas induced deformation under real polymetallic ore field conditions. Based on the results, relationships between vertical subsidence, layer curvature, inclination, and the height of the water-conducting fracture zone were obtained. Particular attention is given to the effects of tectonic discontinuities, chamber geometry, and backfilling on fracture development. A stepwise excavation sequence is simulated to reproduce field conditions and assess the evolution of stress and deformation fields in the overburden. The study reveals that the propagation of the fracture zone around a mine excavation adheres to a polynomial law, characterized by an increase in height concurrent with the expansion of the excavation. This approach enables the design of safe extraction strategies beneath aquifers or surface water bodies. The proposed framework is expected to enhance prediction accuracy and reduce uncertainties.