Shen-gang Li

Shen-gang Li

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 September 2016 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
CJChangyu Jin
Changyu Jin
SLShen-gang Li
Shen-gang Li
JLJianpo Liu
Jianpo Liu

23 August 2018 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Pengjiao JiaPengjiao Jia
Pengjiao Jia
WZWen Zhao
Wen Zhao
YCYang Chen
Yang Chen
SLShen-gang Li
Shen-gang Li
Jianyong HanJianyong Han
Jianyong Han
JDJiachao Dong
Jiachao Dong
It is an effective approach to use Steel Tube Slab (STS) structure combined with the Pile-Beam-Arch (PBA) method to construct a large-space underground station. Traditional construction methods cannot meet the requirement of construction because of the complicated soil layers and high building densities in urban areas. The STS method can effectively increase the rigidity of the supporting system by using steel tubes. Firstly, the stress of bolts and steel tubes are investigated in the construction process based on the field monitoring data. Subsequently, FLAC3D is used to establish a three-dimensional model, which is verified based on the in-situ monitoring data; the effect of excavation process on ground settlement, deformation of STS structure and bridge pile are studied by numerical results. Moreover, the key parameters such as welding of flanges and the step length are studied. The results show that the stress of the steel tubes and flanges does not exceed the designed strength during the construction process. Based on the numerical simulation data, it is indicated that the STS structure can be a very effective and dependable measure in controlling and reducing the surface settlement and the existing adjacent buildings. The numerical results can be used to guide the later construction.

26 January 2025 in Construction and Building Materials
Verified
Journal Article
Closed access
SLShen-gang Li
Shen-gang Li
SLShuangshuang Liu
Shuangshuang Liu
TZTianbiao Zhang
Tianbiao Zhang
ZWZhiguo Wang
Zhiguo Wang
WZWen Zhao
Wen Zhao

8 February 2013 in Journal of Coal Science and Engineering (China)
Verified
Journal Article
Closed access
PDF file
SLShen-gang Li
Shen-gang Li
WZWen Zhao
Wen Zhao
YHYun-Sheng Huang
Yun-Sheng Huang
YLYun-Xia Lei
Yun-Xia Lei
LYLong-Mei Yu
Long-Mei Yu

30 August 2024 in Buildings
Verified
Journal Article
Open access
PDF file
BLBo Lu
Bo Lu
WZWen Zhao
Wen Zhao
SLShen-gang Li
Shen-gang Li
MDManman Dong
Manman Dong
ZXZhikang Xia
Zhikang Xia
YSYunfang Shi
Yunfang Shi
The deformation and damage to seasonal permafrost roadbeds, as seasons shift, stems from the intricate interplay of temperature, moisture, and stress fields. Fundamentally, the frost heave and thaw-induced settlement of soil represent a multi-physics coupling phenomenon, where various physical processes interact and influence each other. In this investigation, a comprehensive co-coupling numerical simulation of both the temperature and moisture fields was successfully executed, utilizing the secondary development module within the finite element software, COMSOL Multiphysics 6.0. This simulation inverted the classical freezing–thawing experiment involving a soil column under constant temperature conditions, yielding simulation results that were in excellent agreement with the experimental outcomes, with an error of no more than 10%. Accordingly, the temperature, ice content, and liquid water content distributions within the seasonal permafrost region were derived. These parameters were then incorporated into the stress field analysis to explore the intricate coupling between the moisture and temperature fields with the displacement field. Subsequently, the frost heave and thaw settlement deformations of the roadbed were calculated, accounting for seasonal variations, thereby gaining insights into their dynamic behavior. The research results show that during the process of freezing and thawing, water migrates from the frozen zone towards the unfrozen zone, with the maximum migration amount reaching 20% of the water content, culminating in its accumulation at the interface separating the two. Following multiple freeze–thaw cycles, this study reveals that the maximum extent of freezing within the roadbed reaches 2.5 m, while the road shoulder experiences a maximum freezing depth of 2 m. A continuous trend of heightened frost heave and thaw settlement deformation of the roadbed is observed in response to temperature fluctuations, leading to the uneven deformation of the road surface. Specifically, the maximum frost heave measured was 51 mm, while the maximum thaw settlement amounted to 13 mm.

1 June 2022 in Underground Space
Verified
Journal Article
Open access
ZWZhiguo Wang
Zhiguo Wang
WZWen Zhao
Wen Zhao
HWHe Wang
He Wang
洋陈洋 陈
洋 陈
QBQian Bai
Qian Bai
SLShen-gang Li
Shen-gang Li