Jelena Ignjatovic

Ms. Jelena Ignjatovic


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2019 in Podzemni radovi
Verified
Journal Article
Open access
PDF file
KUKatarina Urošević
Katarina Urošević
JZJelena Zakonović
Jelena Zakonović
JIJelena Ignjatovic
Jelena Ignjatovic
RGRadmila Gaćina
Radmila Gaćina
Mining is a global industry that is of great importance for every product which is used by human. For mining, process efficiency, reducing production downtime, increasing profitability are all very important. Soft computing technologies (SC) are helping in the process of transforming the mining industry into a safer and more environmental friendly industry, but keeping in mind the financial aspect as well. In this paper some of fields of blasting activities in which the SC methods have been applicated, will be presented. Trough the following chapters some of the most significant researches will be reviewed.

10 March 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JIJelena Ignjatovic
Jelena Ignjatovic
DSDejan Stevanovic
Dejan Stevanovic
MBMirjana Banković
Mirjana Banković
Petar MarkovićPetar Marković
Petar Marković
Operational (short-term) planning in open-pit mining is a critical phase for ensuring grade control and production stability, particularly in complex geological environments. While long-term plans define the strategic goals, they often overlook shift-level variability and operational constraints of a shovel-truck system. This paper presents an optimization model based on a genetic algorithm (GA) for shift-by-shift operational planning. The model integrates real-world technological constraints of the equipment used, including fixed shift capacity (2000 t) and various constraints characteristic of active mining locations. The fitness function is designed to minimize the deviations from the targeted quality range for iron (Fe: 47–50%) and silica (SiO2: ≤11%), while ensuring rational use of mineral reserves. The model was tested on a case study involving eight limonite ore open pits over a period of one production year (1000 shifts). The results show that the GA-generated plan reaches quality requirements in 98.1% of all shifts. This GA approach provides more balanced mining operations and confirms and ensures the achievement of goals from long-term plans, reducing the reliance on large-scale homogenization stockpiles. The developed tool is implemented in Excel/VBA and offers a practical framework for mining engineers to work with.