We propose an algorithm to set the parameters of volt–var curves to improve the performance of distributed generation. Specifically, we optimally set the volt–var curves of the smart inverter for proper control of the distributed generation output. To improve the overall distribution system performance, we consider the minimization of voltage deviation, system loss, and peak of reactive power in an objective function, thereby providing optimal volt–var curve parameters. The proposed algorithm overcomes various limitations of existing studies. First, we use distribution system factors in a multiobjective optimization function to adjust volt–var curve parameters that deviate from the default settings. Second, we consider the service transformers that affect the system voltage according to the photovoltaic generation output in the test model during optimization. Third, we analyze the system improvement according to the number of parameters to be optimized. Fourth, we analyze the implementation of the optimized volt–var curve according to the practical periods when the smart inverter settings can be updated. Fifth, we evaluate different suitable volt–var curves for multiple photovoltaic generators grouped using clustering. Using the proposed algorithm, the distribution system operator can set the optimal volt–var curve according to the system conditions and requirements. We conducted simulations of the proposed method using OpenDSS, a quasistatic time-series simulation, on a test model reflecting the characteristics of a South Korean distribution system. The simulation results confirm that the overall system performance increases when the optimal volt–var curve settings obtained from the proposed algorithm are used.
This paper proposes a method to improve the performance of a distribution system by optimizing volt–var function of a smart inverter to alleviate the voltage deviation problem due to distributed generation connection. In order to minimize voltage deviation and line losses which represent the performance of a distribution system, this paper proposes an algorithm that optimally sets the parameters of the volt–var function. In the process of optimizing the parameters of the volt–var function, the algorithm proposed in this paper considers minimizing the contribution of the reactive power in order not to affect the output of the distributed generation. In order to apply to the field, the distribution system in South Korea considering the configuration and operation regulation was selected as a test model for algorithm verification. As a result, the system performance was successfully improved by optimally setting the volt–var function of the smart inverter which is an effective way to solve the over-voltage problem caused by distributed generation connection. This paper verified the proposed method through OpenDSS, a quasi-static time-series simulation, for the test model considering the characteristics of the distribution system in South Korea.
The increasing use of photovoltaics (PVs) in distribution systems owing to the low-carbon policy has given rise to the need for various technological changes. In particular, the operation of on-load tap changers (OLTCs) has attracted attention. In traditional distribution systems, the OLTC operates via a line-drop compensator (LDC), which focuses on the load to solve the low-voltage problem; however, the problem of over-voltage caused by PVs persists. Currently, a method for operating an OLTC using the measured voltage is being researched; however, solving the voltage problem for several feeders connected to a main transformer (MT) is not viable. Therefore, this study proposes an OLTC operation method to address the feeder with the largest voltage problem depending on the direction of power flow. The proposed method selects a point where the OLTC operates using the difference between the measured and reference voltages. Setting the reference voltage can solve the problem that occurs due to the direction of power flow. Finally, the effectiveness of the proposed method is verified via case studies. Based on the results, we can conclude that the proposed method effectively solves the voltage problem, and an increase in hosting capacity can be expected.
The penetration of wind turbine generators onto the grid has grown worldwide at unprecedented rates in recent years. This raises the concern that the tripping of wind turbine generators could potentially cause system collapses. To alleviate these concerns, wind turbine generators need to maintain connection with the grid when a grid fault occurs. This has provoked many countries to adopt low-voltage ride-through (LVRT) for wind turbine generators. The LVRT is the capability of wind turbine generators to maintain connectivity during certain periods of voltage sag. The wind turbine generators should be connected to the grid to support fault recovery. Also, wind turbine generators must provide reactive power according to the grid voltage sag. Therefore, much research has been focused on enhancing LVRT capability. To enhance LVRT capability, this paper proposes the application of a superconducting fault current limiter (SFCL) in the system. The fault current was suppressed and the voltage sag was improved through the application of the SFCL. By improving the voltage sag, the wind turbine generator and the grid were able to maintain a connection. However, suppression of the fault current can cause a problem in the overcurrent relay (OCR) trip time delay. The trip time delay was solved by OCR resetting. Through a power system computer-aided design/electromagnetic transients including DC (PSCAD/EMTDC), the enhancement of LVRT capability and improvement of the trip delay was confirmed.
9 January 2013 in IEEE Transactions on Applied Superconductivity
An electric railway system uses a single-phase source that is supplied through a Scott transformer from a three-phase transmission system. In addition, the electric railway system has rapidly changing load characteristics in time. An unbalance is generated owing to the rapidly changing large single-phase loads. Subsequently, the unbalanced load causes an unbalanced transmission line. A voltage unbalance in the source influences the power equipment by causing a reduction in the power generation capacity of the generator and a decrease in the output of the other facilities in the transmission line. In addition, many flexible ac transmission systems are applied to transmission lines to compensate for and control electric power. A voltage unbalance causes a control error in these systems. We propose the application of a superconducting fault current limiter to improve the voltage unbalance in a transmission system linked to a Scott transformer. In addition, we analyzed the effects of the proposed method using transient simulations.
In the power distribution system of South Korea, the sectionalizer minimizes and recovers the system from failures, and prohibits independent operation of distributed energy resources. Therefore, it is difficult to expect reliability improvements owing to a photovoltaic system in the power distribution system. Herein, we propose a reliability-centered maintenance-scheduling method based on an economic analysis of photovoltaic integration facilities to ensure the economic feasibility of the photovoltaic system operator and the reliability of the power distribution system. Photovoltaic integration facilities are divided into two categories based on their spread of the failure, and the maintenance scheduling is evaluated according to the maximum and minimum losses according to the time of failure. Facilities that cause power outages to photovoltaics and to loads have relatively little effect on the time of failure. This is because the effects of the power outages in the loads predominate. In contrast, facilities that only cause photovoltaic outages are affected by the generation time. In particular, insulated gate bipolar transistors that operate only during photovoltaic generation have been found to be more economical for corrective replacement than preventive replacement.