Kwang-Hoon Yoon

Mr. Kwang-Hoon Yoon

Soongsil University, Seoul, Republic of Korea
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 September 2022 in Energies
Verified
Journal Article
Open access
PDF file
KYKwang-Hoon Yoon
Kwang-Hoon Yoon
JSJoong-woo Shin
Joong-woo Shin
TNTea-Yang Nam
Tea-Yang Nam
JKJacChul Kim
JacChul Kim
WMWon-Sik Moon
Won-Sik Moon
The increasing use of photovoltaics (PVs) in distribution systems owing to the low-carbon policy has given rise to the need for various technological changes. In particular, the operation of on-load tap changers (OLTCs) has attracted attention. In traditional distribution systems, the OLTC operates via a line-drop compensator (LDC), which focuses on the load to solve the low-voltage problem; however, the problem of over-voltage caused by PVs persists. Currently, a method for operating an OLTC using the measured voltage is being researched; however, solving the voltage problem for several feeders connected to a main transformer (MT) is not viable. Therefore, this study proposes an OLTC operation method to address the feeder with the largest voltage problem depending on the direction of power flow. The proposed method selects a point where the OLTC operates using the difference between the measured and reference voltages. Setting the reference voltage can solve the problem that occurs due to the direction of power flow. Finally, the effectiveness of the proposed method is verified via case studies. Based on the results, we can conclude that the proposed method effectively solves the voltage problem, and an increase in hosting capacity can be expected.

30 March 2022 in Energies
Verified
Journal Article
Open access
PDF file
JSJoong-woo Shin
Joong-woo Shin
KYKwang-Hoon Yoon
Kwang-Hoon Yoon
HCHui-Seok Chai
Hui-Seok Chai
JKJacChul Kim
JacChul Kim
In the power distribution system of South Korea, the sectionalizer minimizes and recovers the system from failures, and prohibits independent operation of distributed energy resources. Therefore, it is difficult to expect reliability improvements owing to a photovoltaic system in the power distribution system. Herein, we propose a reliability-centered maintenance-scheduling method based on an economic analysis of photovoltaic integration facilities to ensure the economic feasibility of the photovoltaic system operator and the reliability of the power distribution system. Photovoltaic integration facilities are divided into two categories based on their spread of the failure, and the maintenance scheduling is evaluated according to the maximum and minimum losses according to the time of failure. Facilities that cause power outages to photovoltaics and to loads have relatively little effect on the time of failure. This is because the effects of the power outages in the loads predominate. In contrast, facilities that only cause photovoltaic outages are affected by the generation time. In particular, insulated gate bipolar transistors that operate only during photovoltaic generation have been found to be more economical for corrective replacement than preventive replacement.

14 March 2022 in Energies
Verified
Journal Article
Open access
PDF file
KYKwang-Hoon Yoon
Kwang-Hoon Yoon
JSJoong-woo Shin
Joong-woo Shin
JKJacChul Kim
JacChul Kim
LHLEE HYEONGJIN
LEE HYEONGJIN
JKJin-Seok Kim
Jin-Seok Kim
Owing to the increasing penetration level of distributed energy resources (DER) and direct current (DC) load, the usage of low-voltage direct current (LVDC) systems has expanded to achieve efficient operations. However, because the LVDC system reaches the peak fault current at a faster rate than the alternating current (AC) system, a solution that protects the system components is necessary to maintain system integrity. It is required by the low-voltage ride-through (LVRT) that the DERs maintain their interconnections with the LVDC system and support fault recovery. In this study, a method is proposed to allow the application of the superconducting fault current limiter (SFCL) to reduce the fault current and enhance the LVRT capability. However, when the DER maintain a connection to support fault recovery, the conventional resistive-type SFCL must withstand the burden of high-temperature superconducting (HTSC) operation during fault state dependence on LVRT. Therefore, this study proposes a trigger-type SFCL to reduce the burden of the HTSC element and enhance the LVRT capability. The voltage sag related to the LVRT was improved owing to the SFCL. The proposed solution was confirmed using PSCAD/EMTDC, which is a commercial software.