Yudun Li

Dr. Yudun Li


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 August 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
KLKuan LI
Kuan LI
YLYudun Li
Yudun Li
GZGuohui Zhang
Guohui Zhang
KSKongming Sun
Kongming Sun
YHYanqi Hou
Yanqi Hou
Industrial microgrids are emerging as important providers of demand-side flexibility for active distribution networks. However, their participation in source–load coordination is hindered by complex production constraints, limited dispatch executability, and the widespread reliance on baseline-based demand response mechanisms. To address these challenges, this paper proposes a baseline-free source–load coordination framework for industrial microgrid clusters. A linear state–task network (LSTN) model is employed to characterize industrial production processes while preserving equipment operation, material balance, buffer storage, and production target constraints. Based on the feasible operating regions of individual microgrids, a simplified optimal adjustable load model (OALM) is developed at the aggregator level to identify and aggregate cluster-level flexibility boundaries without disclosing detailed production information. Building upon the aggregated flexibility region, a baseline-free target power tracking strategy is established, in which the distribution network issues absolute power targets and the aggregator coordinates multiple industrial microgrids to achieve their realization. The proposed framework simultaneously ensures production feasibility, scalable flexibility aggregation, and practical dispatch implementation. Case studies demonstrate that the aggregated industrial load can accurately track dispatch targets while satisfying all production constraints, thereby enhancing the capability of industrial microgrid clusters to participate in large-scale source–load interaction and renewable energy accommodation. Case study results show that when the number of industrial microgrids increases from 10 to 200, the total computation time increases from 5.08 s to 337.40 s, while the target tracking error remains within numerical tolerance. Compared with the conventional baseline-based virtual-battery (VB) method, whose root mean square error (RMSE) with respect to the intended absolute target reaches 241.30 kW under a ±10% baseline estimation error, the proposed method achieves near-zero tracking error. In addition, the production-agnostic aggregation model expands the flexibility boundary by 21.84% and generates targets that are not exactly executable under the full LSTN production constraints.

26 September 2026 in Energies
Verified
Journal Article
Open access
PDF file
YHYanqi Hou
Yanqi Hou
KLKuan Li
Kuan Li
YLYudun Li
Yudun Li
KSKongming Sun
Kongming Sun
With the increasing integration of distributed generation, energy storage, and flexible loads, active distribution networks have gained multiple fault-recovery options, including network reconfiguration, islanded operation, and coordinated source–load regulation. However, existing studies often lack an effective link between system-level restoration decisions and resource-level execution. To address this issue, this paper proposes a two-layer collaborative optimization method for multi-period fault recovery with fast decomposition. The upper layer develops a multi-period restoration model that jointly optimizes network reconfiguration, load restoration targets, and fault repair sequences, with the objectives of minimizing load loss and recovery cost while maximizing continuous power-supply duration. The model incorporates load priorities, switch operations, distributed generation, energy-storage states, flexible-load response, main-grid support, and inter-period coupling constraints. Based on the restoration targets generated by the upper layer, the lower layer applies a fast sort-and-fill decomposition strategy to allocate regulation demands among photovoltaic generation, wind power, energy storage systems, flexible loads, and main-grid support, thereby forming a closed-loop coordination mechanism between restoration planning and resource execution. The proposed method is validated on a modified IEEE 33-bus active distribution network under multi-period fault scenarios. Results show that the load restoration rate is 88.78% in Period 1 and reaches 100% from Period 2 onward. Compared with static restoration, unserved energy decreases from 4.6896 MWh to 0.3113 MWh, while restored energy increases from 8.2505 MWh to 12.6288 MWh. Over 1000 randomized feasible operating points, the maximum absolute objective gap between the proposed sort-and-fill procedure and direct LP re-optimization is 7.55×10−14%, and the maximum power-balance error is 2.73×10−12 kW. These results demonstrate that the proposed method improves restoration effectiveness while reproducing the exact lower-layer LP solution within numerical precision.