Jiqing Li

Dr. Jiqing Li


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2020 in Renewable Energy
Verified
Journal Article
Closed access
MLMin Lu
Min Lu
ZXZuhong Xiong
Zuhong Xiong
KFKejing Fang
Kejing Fang
XLXi Li
Xi Li
JLJiqing Li
Jiqing Li
TLTao Li
Tao Li

22 October 2013 in Water Science & Technology
Verified
Journal Article
Closed access
PDF file
JLJiqing Li
Jiqing Li
YZYu-Shan Zhang
Yu-Shan Zhang
CJChang-Ming Ji
Chang-Ming Ji
AWAi-Jing Wang
Ai-Jing Wang
JLJay R. Lund
Jay R. Lund
This paper examines long-term optimal operation using dynamic programming for a large hydropower system of 10 reservoirs in Northeast China. Besides considering flow and hydraulic head, the optimization explicitly includes time-varying electricity market prices to maximize benefit. Two techniques are used to reduce the ‘curse of dimensionality’ of dynamic programming with many reservoirs. Discrete differential dynamic programming (DDDP) reduces the search space and computer memory needed. Object-oriented programming (OOP) and the ability to dynamically allocate and release memory with the C++ language greatly reduces the cumulative effect of computer memory for solving multi-dimensional dynamic programming models. The case study shows that the model can reduce the ‘curse of dimensionality’ and achieve satisfactory results.

28 June 2021 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
JLJiqing Li
Jiqing Li
JHJing Huang
Jing Huang
PLPengteng Liang
Pengteng Liang
JLJay Lund
Jay Lund

28 June 2023 in Hydrology and Earth System Sciences
Verified
Journal Article
Open access
PDF file
JLJiqing Li
Jiqing Li
JHJing Huang
Jing Huang
LZLei Zheng
Lei Zheng
WZWei Zheng
Wei Zheng
Hydrological time series (HTS) are the key basis of water conservancy project planning and construction. However, under the influence of climate change, human activities and other factors, the consistency of HTS has been destroyed and cannot meet the requirements of mathematical statistics. Series division and wavelet transform are effective methods to reuse and analyse HTS. However, they are limited by the change-point detection and mother wavelet (MWT) selection and are difficult to apply and promote in practice. To address these issues, we constructed a potential change-point set based on a cumulative anomaly method, the Mann–Kendall test and wavelet change-point detection. Then, the degree of change before and after the potential change point was calculated with the Kolmogorov–Smirnov test, and the change-point detection criteria were proposed. Finally, the optimization framework was proposed according to the detection accuracy of MWT, and continuous wavelet transform was used to analyse HTS evolution. We used Pingshan station and Yichang station on the Yangtze River as study cases. The results show that (1) change-point detection criteria can quickly locate potential change points, determine the change trajectory and complete the division of HTS and that (2) MWT optimal framework can select the MWT that conforms to HTS characteristics and ensure the accuracy and uniqueness of the transformation. This study analyses the HTS evolution and provides a better basis for hydrological and hydraulic calculation, which will improve design flood estimation and operation scheme preparation.

29 May 2019 in Applied Water Science
Verified
Journal Article
Open access
PDF file
MSMay Myat Moe Saw
May Myat Moe Saw
JLJiqing Li
Jiqing Li
Hydropower is the world's leading renewable energy resources in electricity generation that produces 71% of electricity more than other forms of energy sources such as coal, gas, and oil which are not reliable and gradually diminish day by day. Therefore, hydropower is essential and considered as an economical factor for producing electricity. There are many untapped hydropower resources in the world. The developing country, Myanmar, is also have about 100 GW unexploited energy potential from the rivers for hydropower electrification. This paper is the review paper which presents about the condition of the hydroelectricity in Myanmar in detail.

12 March 2025 in Water Research
Verified
Journal Article
Closed access
LZLei Zheng
Lei Zheng
CTChao Tan
Chao Tan
JLJiqing Li
Jiqing Li
JHJing Huang
Jing Huang
Xiaohong ChenXiaohong Chen
Xiaohong Chen
BZBikui Zhao
Bikui Zhao