The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.
2 January 2021 in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
The incorporation of bulk density uncertainty for Mineral Resource and Mineral Reserves (MRMR) steps is of great importance for successful mine planning process. In practice, most mining projects use an average density value for each lithological type of the deposit. However, density determinations require special attention as they directly affect the conversion of volumes to tonnages and ore grades to metal contents. The objective of this study is to measure and minimize the risks associated with the MRMR stages, including the density variability in mine planning. Traditional interpolation techniques in geostatistics were used to represent density spatial distribution in a block model, similarly to those used for grade estimation. This approach was developed and applied at a Brazilian iron ore mine. The results indicate MRMR are underestimated if density uncertainty is not considered. Mine design changes were observed, including 5% impact on the Life-of-mine (LOM) and 2% in Net Present Value (NPV).
Según el contexto de industria minera la programación de producción es la mejor metodología para determinar la mejor secuencia de explotación y asi obtener el mejor valor presente líquido y explotar la reserva máxima. La construcción de pilas de acopio y de mezcla representa una alternativa valiosa para la planificación de minado permitiendo garantizar la calidad del concentrado y las especificaciones de la planta de tratamiento. Para satisfacer las especificaciones de leyes y tonelaje, y reducir las variaciones las pilas de acopio y mezcla cumplen un papel importante para la planificación de corto y largo plazo. La programación linear clásica viene siendo ampliamente utilizada en problemas de mezcla presentes en la industria minera entretanto esta formulación permite apenas trabajar con una sola función objetivo en su formulación. El presente trabajo describe un sistema basado en goal programing, capaz de alcanzar las restricciones requeridas en la planificación a corto y largo plazo de forma simultánea. La formulación propuesta obtiene el mejor escenario operacional garantizando que las restricciones de costos sean respetadas. Esta formulación es útil pues da soporte a la toma de decisiones en las actividades de planificación a largo y corto plazo.
11 June 2021 in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
Complex load and haul cycles in mining are composed of individual steps, whose times could be better described by a statistical distribution than by the average value. In order to evaluate how loading times and dumping times behave, this paper tested a large dataset of loading and dumping times measured at an open pit limestone mine in Brazil against the distributions most commonly used to model these variables, Log-normal and Normal; as well as Gamma, Logistic, Weibull and Exponential distributions. None of the tested distributions provided statistically significant adherence to the data, but it was possible to identify that for most equipment, Logistic and Normal distributions would produce less error on stochastic modelling then the other tested distributions.
31 July 2022 in Advances in Materials Science and Engineering
An optimal dimensioning of the room and pillars of the square or rectangular section is finding adequate transversal section support for the pillar; in that sense, all forces acting on the pillar must be evaluated. The pillar has its ends subjected to normal (σ) and shear stresses (τ). In addition, the pillar can also be subjected to dynamic stresses from the seismic waves generated by rock blasting. Thus, when calculating the dimensions of a mine pillar, the stresses imposed by seismic waves must be considered. The combination of lithostatic and dynamic stresses generated by blasting can affect the pillar, generating regions, or areas that will exhibit the formation of cracks, microcracks, chipping, and other detrimental processes for its stability. In that regard, it is appropriate to assess the dynamic effects of the energy delivered in each wave pulse so that these dynamic quantities can be included in the dimensioning of the pillars. This paper presents the physical and mathematical formulation describing the dimensioning issues of room and pillars and its solution using numerical modeling. The numerical modeling is performed using nonlinear mathematical programming and simulation with FLAC 3D (Fast Lagrangian Analysis of Continua in 3D). In this study, it was proven that the stress generated by the seismic wave represents a dynamic stress of nearly 5.5MPa. 'Dimensioned pillars considering wave stresses allows it to recover an average 1.6% less when it is compared with pillars only under overlying rock mass'.