Beck Nader

Beck Nader

Auto-generated profile, based on publicly available information

Beck Nader

Universidade Federal de Minas Gerais, Brasil

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 June 2023 in Mining
Verified
Journal Article
Open access
PDF file
JMJônatas Franco Campos da Mata
Jônatas Franco Campos da Mata
ANAlizeibek Saleimen Nader
Alizeibek Saleimen Nader
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
Integrated Optimization can find optimized solutions for a project to define open pit and mine scheduling with greater reliability. This work aims to demonstrate how the insertion of geometallurgical variables can significantly change the financial return of a project. Two geometallurgical variables are considered in mine planning simulations. Specific energy corresponds to the energy consumed in the comminution of the ore, and process recovery measures the percentage of metal incorporated into the product. Three scenarios were developed considering an iron ore deposit. In the Base Case (BC) scenario, the recovery was fixed, and the specific energy of comminution was not considered. GeoMet1 considers the variable recovery varying for each block. GeoMet2 considered both recovery and specific energy as variables varying for each block. GeoMet1 and GeoMet2 presented Net Present Value (NPV), respectively, as 3.68% and 13.57% lower than the BC. This overestimation of the BC results can be viewed as an optimistic case of mine planning that is very common in the mining industry. These results show that the use of specific energy and recovery variables is fundamental to obtaining more reliable mine planning.

1 June 2019 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
FSFelipe Ribeiro Souza
Felipe Ribeiro Souza
TCTaís Renata Câmara
Taís Renata Câmara
VTVidal Félix Navarro Torres
Vidal Félix Navarro Torres
BNBeck Nader
Beck Nader
RGRoberto Galery
Roberto Galery
The transport distance in a mining operation strongly influences a mine operation revenue and its operational cycle because it is a fundamental part of the total mining costs. Generally, the transport route is determined based on an engineer's practical knowledge, which does not consider any mechanism to optimize the possible routes to be taken. In an attempt to establish a methodology for calculating the path that results in minimum costs to transport the mined block to its destination, the Dijkstra methodology is applied to a tree graph analysis, where the mining blocks are analysed as nodes of the tree. The transport cost is reflected as the arc of the graphs, which can use the Euclidean distance or the transport time for the calculation of the minimum path. The result obtained from the Dijkstra algorithm provided a non-operational route; to overcome this problem, an adjustment was performed through non-parametric equations. In this manner, it was possible to determine the transport costs for each block of the model. The paths based on Euclidean distance and transport time showed a tendency to increase for deeper mining regions. Identifying areas of largest growth and correctly quantifying their values increase the efficiency of mining planning.

1 March 2020 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
LCLeonardo Soares Chaves
Leonardo Soares Chaves
LCLuiz Alberto Carvalho
Luiz Alberto Carvalho
FSFelipe Ribeiro Souza
Felipe Ribeiro Souza
BNBeck Nader
Beck Nader
COCarlos Enrique Arroyo Ortiz
Carlos Enrique Arroyo Ortiz
GVGeorge Eduardo Sales Valadão
George Eduardo Sales Valadão
The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.

1 October 2019 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
FSFelipe Ribeiro Souza
Felipe Ribeiro Souza
TCTaís Renata Câmara
Taís Renata Câmara
VTVidal Félix Navarro Torres
Vidal Félix Navarro Torres
BNBeck Nader
Beck Nader
RGRoberto Galery
Roberto Galery
The production rate of a mining operation has an important effect on the operational cycle and gross profit, which are often evaluated based on engineering practices. Assessment of the economic performance of mine operations in mining engineering is of great importance because an incorrect production rate can result in significant financial losses. The production rate is composed of two bases: the cost estimation and the price scenario. Bureau of Mines studies performed on American mines indicated that processing costs can be estimated through the production rate. This article proposes to connect the model presented by the Bureau of Mines and queuing theory to describe the operational costs, which are used to develop a production optimization methodology. The proposed cost composition describes a production system to verify the law of diminishing returns and the economy of scale. Between these regions of the production curve, the optimum point was determined with mathematical precision.

1 December 2018 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
LCLuiz Alberto Carvalho
Luiz Alberto Carvalho
FSFelipe Ribeiro Souza
Felipe Ribeiro Souza
LCLeonardo Soares Chaves
Leonardo Soares Chaves
BNBeck Nader
Beck Nader
TCTaís Renata Câmara
Taís Renata Câmara
RGRoberto Galery
Roberto Galery
Geologic modeling is an important step in determining the benefits and final pit dimensions for mining operations. Geostatistical models and distance-based functions are the main methods used to estimate the grade behavior. However, these two methods, despite their similar mean values, differ in spatial variability. The objective of this article is to prove, by comparing the two methodologies, that models with different spatial variability using the Lerchs-Grossmann algorithm will output subtly different final pit dimensions and scheduling. Furthermore, with the direct block schedule (DBS), these differences can be considerable. The tests compared the methodologies using the following three models: inverse distance (ID), ordinary kriging (OK) and turning bands simulation (TBS). The results demonstrate that the Lerchs-Grossmann algorithm is only slightly sensitive to the spatial variability of the grade; however, DBS requires the model populations to be better defined because of its greater sensitivity to spatial variability.

1 March 2023 in REM - International Engineering Journal
Verified
Journal Article
Open access
VRVilson Carlesso dos Reis
Vilson Carlesso dos Reis
BNBeck Nader
Beck Nader