Construction projects are riddled with risks that should be shared by both owners and contractors alike. The principal-agent theory has proven to be an influential theoretical apparatus in designing optimal risk-sharing rules and provides contractors with proper incentives to improve project efficiencies. According to the principal-agent theory, it is optimal to let the contractor assume all of the risk if it is risk-neutral. However, this article argues that this theoretical model may lead to a biased incentive structure. To demonstrate this point, this article analyzes the necessity of risk-sharing between the owner and risk-neutral contractor in construction projects. Taking into account cases where the respective planning efforts of the owner and contractor are supposed to be unverifiable and mutually complementary in terms of cost overrun risk, we find that either double moral hazard (i.e., both parties take opportunistic strategies) or inefficient breach of contract by the contractor occurs if the contractor assumes the entire cost overrun risk. An optimal risk-sharing strategy, therefore, plays an important role in coordinating both parties to choose efficient strategies.
1 December 2023 in Journal of Construction Engineering and Management
This study aims to investigate the incentive mechanism of different availability payment methods applied in Public Private Partnership (PPP) contracts. We present a basic model in a multitask environment in which a risk-averse private contractor chooses two types of noncontractible efforts: one is unproductive, in the sense that it saves building cost but sacrifices social benefits; the other one is productive, as it reduces operating cost without social loss. We find that the PPP contract using separate charges for availability and performance is more desirable than using single unitary charge if the government can detect the social loss cause by unproductive effort. However, the latter brings about more social welfare over the former if the social loss is not observable to the government and the observable value of benefit-cost ratio of the unproductive effort is relatively larger than the benefit-cost ratio of the productive effort.
28 March 2023 in Engineering, Construction and Architectural Management
Purpose: A public–private partnership (PPP) is an agreement between the government and private investors to deliver long-term public services. The efficiency of PPP projects depends on PPP contracts stipulating contractual parties' corresponding responsibilities and rights to deal with relational and performance risks. Although more complex contracts provide more remedies for mitigating ex-post transaction costs, they also result in the increased ex ante transaction costs associated with contract writing. Thus, contractual complexity is a design choice that can reduce the overall contract transaction costs.Design/methodology/approach: Using 365 transportation PPP projects in China from 2010 to 2019, this study applies the Poisson regression model to examine the effects of payment mechanisms, ownership by investors and equity structure on contractual complexity.Findings: PPP contracts have control and coordination functions with unique determinants. Parties in the government-pay mechanism are more likely to negotiate coordination provisions, which results in greater contractual complexity. PPP projects with state-owned enterprises (SOEs) have less contractual complexity in terms of both two functions of provisions, whereas the equity structure has no impact on contractual complexity.Originality/value: These findings provide a nuanced understanding of how various contractual provisions are combined to perform control or coordination functions and make managerial recommendations to parties involved in PPP projects.
1 January 2018 in Mathematical Problems in Engineering
Sustainable operation of public-private partnership (PPP) infrastructure projects that are characterized by considerable external benefits is of vital importance. However, a liquidity shock might trigger an inefficient liquidation of a project by the special purpose vehicle (SPV) and the bank, whose objectives are to maximize the profits generated by the project. This study argues that performance guarantee and subsidy policies implemented by the government play a role in encouraging socially efficient decision-making by the SPV and the bank to ensure the continuation of socially valuable projects. The results show that both government subsidy and performance guarantee policies are effective in avoiding the inefficient liquidation of PPP infrastructure projects when the external benefits are large and certain. However, a performance guarantee policy might lead to inefficient continuation when the external benefits of a project are uncertain. Finally, we discuss the possibility that an integrated policy combining performance guarantees and government subsidies improves the efficiency of a PPP infrastructure project.
30 April 2018 in Mathematical Problems in Engineering
This study analyses the contractual efficiency of public-private partnership (PPP) infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV) established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard). Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.