This paper analyzes the operating and economic benefits anticipated from the introduction of centrally managed battery energy storage systems (BESSs) in noninterconnected island (NII) grids with high renewable energy source (RES) penetration. A mixed integer linear programming based generation management model is developed to simulate the operation of NII systems with and without BESS facilities. The impact of BESS energy and power capacity sizing is discussed, showing that the main contribution of storage lies in the provision of fast response reserves that facilitate the integration of increased intermittent RES generation. A feasibility analysis is then performed, considering BESS facilities either as independent storage investments or as facilities being developed in conjunction with new wind power capacity. The levelized cost of energy or reserves is calculated to evaluate the required remuneration to ensure investment viability.
16 February 2015 in IEEE Transactions on Sustainable Energy
In this paper, the electrical response of a partially shaded photovoltaic (PV) array, comprising several strings connected in parallel, is investigated. The PV array is simulated by employing an enhanced version of the widely used single-diode model, reformulated in an explicit manner employing the Lambert W function. The multiple maximum power points (MPPs) that appear on the P-V characteristic of the array in partial shading conditions are analyzed, in terms of their number and properties. Simplified empirical expressions are then derived to calculate the voltage, current, and power for each local MPP, at any irradiance level and temperature, using only datasheet information, in a most simple and straightforward manner, without resorting to detailed modeling and simulations. The derived formulae are validated using both simulation and experimental results.
The objective of this paper is to evaluate the contribution of energy storage systems to resource adequacy of power systems experiencing increased levels of renewables penetration. To this end, a coherent methodology for the assessment of system capacity adequacy and the calculation of energy storage capacity value is presented, utilizing the Monte Carlo technique. The main focus is on short-duration storage, mainly battery energy storage systems (BESS), whose capacity values are determined for different power and energy configurations. Alternative operating policies (OPs) are implemented, prioritizing system cost or reliability, to demonstrate the significant effect storage management may have on its contribution to system adequacy. A medium-sized island system is used as a study case, applying a mixed integer linear programming (MILP) generation scheduling model to simulate BESS and system operation under each OP, in order to determine capacity contribution and overall performance in terms of renewable energy sources (RES) penetration, system operating cost and BESS lifetime expectancy. This study reveals that BESS contribution to system adequacy can be significant (capacity credit values up to ~85%), with energy capacity proving to be the most significant parameter. Energy storage may at the same time enhance system reliability, reduce generation cost and support RES integration, provided that it is appropriately managed; a combined reliability-oriented and cost-driven management approach is shown to yield optimal results.
This paper proposes a novel real-time redispatch method for energy storage systems (ESSs) in resource adequacy studies. In case of real-time contingencies, a realistic operating profile is generated for ESSs to enhance system reliability by mitigating loss of load events, while maintaining their market schedule to the extent possible. Contrary to the standard approaches in the literature, the proposed method neither adopts a perfect foresight for future events, such as generator failures, nor does it resort to “greedy” adequacy-oriented management strategies which are detached from normal operation. Instead, storages follow a market-driven schedule, being suitably redispatched during real-time operation when necessary for adequacy reasons, subject to their energy and power capacity constraints. The redispatch method is deterministically formulated through a sequence of logical conditions and is integrated into a stochastic adequacy assessment model built upon Monte Carlo technique. Multiple battery energy storage configurations have been examined, with the Greek power system serving as a realistic case study, to evaluate the method against others available in the literature and calculate the capacity value of battery ESS.