20 August 2021 in Energies
Verified
Journal Article
Open access
PDF file
PDPantelis Dratsas
Pantelis Dratsas
GPGeorgios Psarros
Georgios Psarros
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
The objective of this paper is to evaluate the contribution of energy storage systems to resource adequacy of power systems experiencing increased levels of renewables penetration. To this end, a coherent methodology for the assessment of system capacity adequacy and the calculation of energy storage capacity value is presented, utilizing the Monte Carlo technique. The main focus is on short-duration storage, mainly battery energy storage systems (BESS), whose capacity values are determined for different power and energy configurations. Alternative operating policies (OPs) are implemented, prioritizing system cost or reliability, to demonstrate the significant effect storage management may have on its contribution to system adequacy. A medium-sized island system is used as a study case, applying a mixed integer linear programming (MILP) generation scheduling model to simulate BESS and system operation under each OP, in order to determine capacity contribution and overall performance in terms of renewable energy sources (RES) penetration, system operating cost and BESS lifetime expectancy. This study reveals that BESS contribution to system adequacy can be significant (capacity credit values up to ~85%), with energy capacity proving to be the most significant parameter. Energy storage may at the same time enhance system reliability, reduce generation cost and support RES integration, provided that it is appropriately managed; a combined reliability-oriented and cost-driven management approach is shown to yield optimal results.

9 February 2023 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
PDPantelis Dratsas
Pantelis Dratsas
GPGeorgios Psarros
Georgios Psarros
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper proposes a novel real-time redispatch method for energy storage systems (ESSs) in resource adequacy studies. In case of real-time contingencies, a realistic operating profile is generated for ESSs to enhance system reliability by mitigating loss of load events, while maintaining their market schedule to the extent possible. Contrary to the standard approaches in the literature, the proposed method neither adopts a perfect foresight for future events, such as generator failures, nor does it resort to “greedy” adequacy-oriented management strategies which are detached from normal operation. Instead, storages follow a market-driven schedule, being suitably redispatched during real-time operation when necessary for adequacy reasons, subject to their energy and power capacity constraints. The redispatch method is deterministically formulated through a sequence of logical conditions and is integrated into a stochastic adequacy assessment model built upon Monte Carlo technique. Multiple battery energy storage configurations have been examined, with the Greek power system serving as a realistic case study, to evaluate the method against others available in the literature and calculate the capacity value of battery ESS.

6 December 2022 in Batteries
Verified
Journal Article
Open access
PDF file
PDPantelis Dratsas
Pantelis Dratsas
GPGeorgios Psarros
Georgios Psarros
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper investigates the anticipated benefits from the introduction of a battery energy storage system (BESS) behind-the-meter (BtM) of a wind farm (WF) located in a small non-interconnected island (NII) system. Contrary to the standard storage deployment applications for NII, where storage is either installed in front of the meter as a system asset or integrated into a virtual power plant with renewable energy sources, the BESS of this paper is utilized to manage the power injection constraints imposed on the WF, aiming to minimize wind energy curtailments and improve WF’s yield. A mixed integer linear programming generation scheduling model is used to simulate the operation of the system and determine the permissible wind energy absorption margin. Then, a self-dispatch algorithm is employed for the operation of the WF–BESS facility, using the BESS to manage excess wind generation that cannot be directly delivered to the grid. Additionally, the contribution of BESS to the capacity adequacy of the NII system is investigated using a Monte Carlo-based probabilistic model, amended appropriately to incorporate storage. Finally, an economic feasibility analysis is carried out, considering the possible revenue streams. By examining several BESS configurations, it has been shown that BtM BESS reduces energy curtailments and contributes substantially to resource adequacy as its energy capacity increases. However, the investment feasibility is only ensured if the capacity value of the BtM storage is properly monetized or additional dependability of wind production is claimed on the ground that the inherent intermittency of the wind production is mitigated owing to storage.

25 November 2024 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
PDPantelis Dratsas
Pantelis Dratsas
GPGeorgios Psarros
Georgios Psarros
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper proposes a real-time redispatch method for including PV-plus-battery plants in resource adequacy assessment (RAA) studies. The method offers the possibility to represent the market operation of the assets, while at the same time considering their response to reliability events, unlike existing methods in the literature that manage such assets in a single-dimensional manner, driven solely by adequacy contribution considerations or entirely ignoring this capability. In the proposed method, while the plant is initially dispatched in a market-oriented manner, i.e., with the objective of maximizing market revenues, its actual operation is adapted to meet system needs when reliability events take place. The method is incorporated into a Monte Carlo (MC) based RAA model in a computationally efficient manner, relying on a deterministic implementation of redispatching that does not impact significantly the computational burden of the RAA model, thus enabling the execution of multiple MC samples to achieve a high stochastic process accuracy. A merit order algorithm is also embedded into the RAA model to evaluate the PV-plus-battery market revenues. The model developed allows a refined calculation of the capacity value (CV) of such assets for different plant configurations and inverter loading ratios, while the upper and lower CV bounds are approximated via application of the adequacy- and market-oriented approaches available in the literature. Results show that the embedded storage energy capacity is crucial for the CV afforded by the assets, while any decrease in the inverter capacity does not significantly impact the CV value. Further, the CV of storage embedded in tightly coupled PV-plus-battery plants, where batteries are exclusively charged by the plant's own PV generation, is generally lower than the value of similar stand-alone storages operating without any charging constraints.

24 August 2024 in Energies
Verified
Journal Article
Open access
PDF file
CKChristiana Kostaki
Christiana Kostaki
PDPantelis Dratsas
Pantelis Dratsas
GPGeorgios Psarros
Georgios Psarros
ECEVANGELOS CHATZISTYLIANOS
EVANGELOS CHATZISTYLIANOS
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper presents a novel methodology for modeling hydropower plants (HPPs) with and without pumping capability in resource adequacy assessment studies. The proposed method is based on the premise that HPPs should maximize their contribution to system adequacy within their technical constraints by using the energy reserves in their upper reservoirs without significantly deviating from their market schedule. The approach of this paper differs from the conventional operating policies for incorporating HPPs into resource adequacy assessment studies, which either adhere to a fixed market schedule or perform peak shaving, and are inelastic to real-time events or do not resort to realistic temporal correlations between natural water inflows on upper reservoirs and the water discharge needs to cover demand peaks, respectively. The modeling approach focuses on large-reservoir HPPs with natural inflows and is generic enough to deal with both stations incorporating pumping capabilities and those without. It utilizes the state-of-the-art Monte Carlo simulation technique to form the availability of system assets and determine the loss of load incidents. The market schedule and level of reservoir fulfillment for the HPPs are retrieved from a cost-optimal power system simulation algorithm executed offline before the application of the resource adequacy assessment. The effectiveness of the proposed methodology is demonstrated through its implementation in a case study of a power system experiencing different levels of adequacy, comparing the obtained results with various traditional HPP modeling methods from the literature.

5 March 2026 in IEEE Access
Verified
Journal Article
Open access
ECEvangelos S. Chatzistylianos
Evangelos S. Chatzistylianos
GPGeorgios Psarros
Georgios Psarros
PDPantelis Dratsas
Pantelis Dratsas
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper presents a climate-aware stochastic capacity expansion planning (CEP) framework that addresses the growing need for robust policy and investment decisions towards high renewable penetration, giving due consideration to climate variability. The developed model incorporates demand, renewable generation, and hydro inflows for 35 climate years, preserving intra-annual variability, correlation of resources, and variance of climate conditions. To address the computational burden of fully stochastic models, several clustering techniques are assessed, namely k-means, k-medoids, hierarchical, and a novel cost-driven approach. Unlike traditional clustering methods, the cost-driven approach clusters climate years according to their impact on system cost, delivering near-optimal results with more than a 90% reduction in computation time. The study also explores whether deterministic model runs, i.e. solving for each climate year individually, can approximate the stochastic optimum. A percentile-based analysis shows that energy mixes derived from intermediate-to-upper percentiles of the capacity envelope can approximate optimal cost within about 3-5%. Overall, these findings highlight the importance of considering multiple climate years and selecting appropriate scenario reduction techniques to ensure robust and cost-effective system planning.