Guorui Feng

Dr. Guorui Feng

orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

4 July 2024 in Processes
Verified
Journal Article
Open access
PDF file
WWWenda Prof. Dr. Wu
Wenda Prof. Dr. Wu
TWTianchen Wang
Tianchen Wang
JBJianbiao Bai
Jianbiao Bai
JLJinhu Liu
Jinhu Liu
Xiang-yu WangXiang-yu Wang
Xiang-yu Wang
GFGuorui Feng
Guorui Feng
Gob-side entry driving near an advancing working face can improve the recovery rate of coal resources and keep the balance between mining and development. However, the large displacement of the gob-side entry caused by the mining dynamics of abutment pressure challenges the safety and processes of coal mining. This article takes the 15102 tailentry of Xizhang Coal Mine in Changzhi City, Shanxi Province, as an example to study the stability of the coal pillar and the failure characteristics of the surrounding rock and proposes cooperative control strategies of surrounding rock stability. Field tests indicated that when the coal pillar width was 15 m, the displacements of the entry floor, roof, coal pillar side, and solid coal side were 1121 mm, 601 mm, 783 mm, and 237 mm, respectively. A meticulously validated numerical model, incorporating a double-yield model for the gob materials and calibrated parameters, was developed to investigate the stress changes and yield zone distribution across the coal pillar with different sizes. The results of the simulation indicate that the influence range of the dynamic abutment pressure caused by mining in the upper section of gob-side entry driving is 30 m ahead and 70 m behind. When the coal pillar width increases from 7 m to 20 m, the internal stress of the coal pillar increases continuously, while the internal stress of the solid coal decreases continuously. It is estimated that the reasonable coal pillar width should be 7 m, which is subjected to a lower load. The cooperative control strategies comprising a narrow coal pillar, hydraulic fracturing roof cutting for pressure relief, and entry dynamic support were proposed and applied in the 15103 tailentry. The final displacements of the floor, roof, coal pillar side, and solid coal side were 66.01%, 62.06%, 61.05%, and 63.30% lower than that of the 15102 tailentry in the same period, respectively, which effectively controlled the stability of surrounding rock. In addition, this finding for the gob-side entry driving near an advancing working face in this study can potentially be applied to other similar projects.

24 April 2020 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
CZChunwang Zhang
Chunwang Zhang
ZJZhixin Jin
Zhixin Jin
GFGuorui Feng
Guorui Feng
XSXuanmin Song
Xuanmin Song
GRGao Rui
Gao Rui
ZYZhang Yujiang
Zhang Yujiang

29 June 2022 in IEEE Sensors Journal
Verified
Journal Article
Closed access
XWXiaoya Wei
Xiaoya Wei
GFGuorui Feng
Guorui Feng
TQTingye Qi
Tingye Qi
JGJun Guo
Jun Guo
ZLZhen Li
Zhen Li
ZLZhu Li
Zhu Li
To reduce all kinds of noise interference in the transient electromagnetic signal, and improve the resolution of abnormal resistance in detection area. In this paper, a method based on Slime Mould Algorithm (SMA) optimized Variational Mode Decomposition (VMD) combined with Wavelet Threshold Denoising (SMA-VMD-WTD) was proposed to identify and eliminate the noise. Firstly, the slime mould algorithm (SMA) was used to select the key parameters in VMD. Then, the signal was adaptively decomposed by VMD according to the optimized parameters to obtain certain modal components, and divided them into effective signal components and noise components. Finally, the effective signal components were further processed by Wavelet Threshold Denoising (WTD) and reconstructed to obtain the transient electromagnetic signal with noise removal. The simulation signal tests with different noise intensity were built, and this method was compared with Ensemble Empirical Mode Decomposition (EEMD), WTD, unoptimized VMD and SMA to optimize VMD for reducing noise analysis of simulation tests. The results showed that SMA-VMD-WTD was more effective in identifying and eliminating transient electromagnetic signal noise. The method was applied to a geological exploration area, which verified the field applicability of this method. The results of the simulation tests and field test showed that SMA-VMD-WTD was a better denoising method for transient electromagnetic signal.

20 October 2023 in Theoretical and Applied Fracture Mechanics
Verified
Journal Article
Closed access
CSCheng Song
Cheng Song
GFGuorui Feng
Guorui Feng
JBJinwen Bai
Jinwen Bai
JCJiaqing Cui
Jiaqing Cui
KWKai Wang
Kai Wang
RQRuipeng Qian
Ruipeng Qian

1 April 2021 in Construction and Building Materials
Verified
Journal Article
Closed access
HWHaochen Wang
Haochen Wang
TQTingye Qi
Tingye Qi
GFGuorui Feng
Guorui Feng
XWXiaoze Wen
Xiaoze Wen
ZWZehua Wang
Zehua Wang
XDXianjie Du
Xianjie Du