The optimal reactive power dispatch (ORPD) problem is an important issue to assign the most efficient and secure operating point of the electrical system. The ORPD became a strenuous task, especially with the high penetration of renewable energy resources due to the intermittent and stochastic nature of wind speed and solar irradiance. In this paper, the ORPD is solved using a new natural inspired algorithm called the marine predators’ algorithm (MPA) considering the uncertainties of the load demand and the output powers of wind and solar generation systems. The scenario-based method is applied to handle the uncertainties of the system by generating deterministic scenarios from the probability density functions of the system parameters. The proposed algorithm is applied to solve the ORPD of the IEEE-30 bus system to minimize the power loss and the system voltage devotions. The result verifies that the proposed method is an efficient method for solving the ORPD compared with the state-of-the-art techniques.
This paper proposes an adaptive grasshopper optimization algorithm (AGOA) for solving the optimal power flow (OPF) problem with the optimal incorporation of a center-node unified power flow controller (C-UPFC). The C-UPFC which is an advanced flexible AC transmission system (FACTS) device is inserted in series with a transmission line (TL) at its midpoint for providing the power flow control together with independent voltage control. The proposed AGOA is based on applying the Levy flight distribution and spiral path orientation of search agents to the traditional grasshopper optimization algorithm (GOA) to diminish the stagnation problem of the basic GOA at local optima and enhance its searching ability. Therefore, this AGOA technique is implemented for optimal sizing and siting of the C-UPFC on standard IEEE 30-bus and 57-bus systems as well as 26-bus system, and then compared with other well-known techniques to verify its effectiveness. To assess the installation of the C-UPFC in a power system, the optimal capacities and locations of the C-UPFC are determined for different objective functions, such as the fuel cost, fuel cost with a valve point loading effect (VPLE), piecewise cost and emission. Simulation results reveal that the proposed algorithm is more efficient and superior for OPF solution compared with the other algorithms reported in the literature. Furthermore, the optimal integration of the C-UPFC in the power system is considerably minimizing the power loss and improving the voltage profile.
The Egyptian irrigation system depends mainly on canals that take water from the River Nile; nevertheless, the arid climate that dominates most of the country influences the high rate of water losses, mainly through evaporation. Thus, the main objective of this study is to develop a practical approach that helps to accommodate solar photovoltaic (PV) panels over irrigation canals to reduce the water evaporation rate. Meanwhile, a solar PV panel can contribute effectively and economically to an on-grid system by generating a considerable amount of electricity. A hybrid system includes a solar PV panel and a diesel generator. Several factors such as the levelized cost of energy (LCOE), total net present cost, loss of power supply probability, and greenhouse gas emissions should be considered while developing a technoeconomically feasible grid-connected renewable integrated system. A mathematical formulation for the water loss was introduced and the evaporation loss was monthly estimated. Thus, this study also aims to enhance an innovative metaheuristic algorithm based on a cuckoo search optimizer to show the way forward for developing a technoeconomic study of an irrigation system integrated with an on-grid solar PV panel designed for a 20-year lifespan. The results are compared using the mature genetic algorithm and particle swarm optimization to delimit the optimal size and configuration of the on-grid system. The optimal technoeconomic feasibility is connected to the graphical information system to delimit the optimal length and direction of the solar PV accommodation covering the canals. Finally, based on the simulated results, the optimal sizing and configuration of the irrigation-system-integrated on-grid solar PV accommodation have less impact on the LCOE without violating any constraint and, at the same time, generating clean energy.
Wind speed variations affect the performance of the wind energy conversion systems (WECSs) negatively. This paper addressed an advanced law of the backstepping controller (ABC) for enhancing the integration of doubly fed induction generator (DFIG)-based grid-connected WECS under wind range of wind speed. This enhancement was achieved through three control schemes, which were blade pitch control, rotor-side control, and grid-side control. The blade pitch control was presented to adjust the wind turbine speed when the wind speed exceeds its rated value. In addition, the rotor and grid-side converter controllers were presented for improving the direct current link voltage profile and achieving maximum power point tracking (MPPT) under speed variations, respectively. To evaluate the effectiveness of the proposed ABC control, a comparison between PI and sliding-mode control (SMC) was presented, considering the parameters of a 1.5 MW DFIG wind turbine in the Assilah zone in Morocco. Moreover, some changes in the DFIG parameters were introduced to investigate the robustness of the proposed controller under parameter uncertainties. Simulation results showed the capability of the proposed ABC controller to enhance the performance of the DFIG-WECS based on variable speed and variable pitch turbine, at both below and above-rated speed, leading to an error around 10−3 (p.u), with an ATE = 0.4194 in the partial load region; in terms of blade pitch control, an error of 2.10−4 (p.u) was obtained, and the DC-link voltage profile showed a measured performance of 5 V and remarkable THD value reduction compared to other techniques, with a measured THD value of 2.03%, 1.67%, and 1.46% respectively, in hyposynchronous, hypersynchronous, and pitch activation modes of operation. All simulations were performed using MATLAB/SIMULINK based on real wind profiles in order to make an exhaustive analysis with realistic operating conditions and parameters.
Large-scale wind turbines with a large blade radius rotates under fluctuating conditions depending on the blade position. The wind speed is maximum in the highest point when the blade in the upward position and minimum in the lowest point when the blade in the downward position. The spatial distribution of wind speed, which is known as the wind shear, leads to periodic fluctuations in the turbine rotor, which causes fluctuations in the generator output voltage and power. In addition, the turbine torque is affected by other factors such as tower shadow and turbine inertia. The space between the blade and tower, the tower diameter, and the blade diameter are very critical design factors that should be considered to reduce the output power fluctuations of a wind turbine generator. To model realistic characteristics while considering the critical factors of a wind turbine system, a wind turbine model is implemented using a squirrel-cage induction motor. Since the wind speed is the most important factor in modeling the aerodynamics of wind turbine, an accurate measurement or estimation is essential to have a valid model. This paper estimates the average wind speed, instead of measuring, from the generator power and rotating speed and models the turbine’s aerodynamics, including tower shadow and wind shear components, without having to measure the wind speed at any height. The proposed algorithm overcomes the errors of measuring wind speed in single or multiple locations by estimating the wind speed with estimation error less than 2%.
1 January 2023 in International Journal of Renewable Energy Research