Cuiying Feng

Cuiying Feng


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Waste Management
Verified
Journal Article
Closed access
YMYanfang Ma
Yanfang Ma
WZWen Zhang
Wen Zhang
CFCuiying Feng
Cuiying Feng
Benjamin LevBenjamin Lev
Benjamin Lev
ZLZongmin Li
Zongmin Li

3 June 2019 in International Transactions in Operational Research
Verified
Journal Article
Closed access
PDF file
JCJianhu Cai
Jianhu Cai
QZQian Zhou
Qian Zhou
JSJianyue Sun
Jianyue Sun
XHXiaoqing Hu
Xiaoqing Hu
CFCuiying Feng
Cuiying Feng
XLXuejiao Li
Xuejiao Li

9 September 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CFCuiying Feng
Cuiying Feng
SHShengsheng Hu
Shengsheng Hu
YMYanfang Ma
Yanfang Ma
ZLZongmin Li
Zongmin Li
In a resource-constrained project scheduling problem, most studies ignore that resource supply is a separate optimization problem, which is not in line with the actual situation. In this study, the project scheduling problem and the resource supply problem are regarded as a dynamic game system, with interactive influences and constraints. This study proposes a Stackelberg dynamic game model based on the engineering supply chain perspective. In this model, the inherent conflicts and complex interactions between the Multi-mode Resource-Constrained Project Scheduling Problem (MRCPSP) and the Multi-Period Supply Chain Problem (MPSCP) are studied to determine the optimal equilibrium strategy. A two-level multi-objective programming method is used to solve the problem. The MRCPSP is the upper-level planning used to optimize project scheduling and activity mode selection to minimize project cost and duration; MPSCP is a lower-level planning method that seeks to make resource transportation decisions at a lower cost. A two-layer hybrid algorithm, consisting of Genetic Algorithm (GA) and Particle Swarm Optimization (PSO), is proposed to determine the optimal equilibrium strategy. Finally, the applicability and effectiveness of the proposed optimization method are evaluated through a case study of a large hydropower construction project, and management suggestions for related departments are provided.

26 June 2018
Verified
Book Chapter
Closed access
PDF file
CFCuiying Feng
Cuiying Feng
TNTing Ni
Ting Ni
GZGengui Zhou
Gengui Zhou