Jack Kurki-Fox

Dr. Jack Kurki-Fox

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
MHMeredith Hovis
Meredith Hovis
JHJoseph Chris Hollinger
Joseph Chris Hollinger
Frederick CubbageFrederick Cubbage
Frederick Cubbage
TSTheodore Shear
Theodore Shear
BDBarbara Doll
Barbara Doll
TPThomas Potter
Thomas Potter
Increased global temperatures resulting from anthropogenically induced climate changes have increased the frequency and severity of adverse weather events, including extreme rainfall events, floods, and droughts. In recent years, nature-based solutions (NBS) have been proposed to retain storm runoff temporarily and mitigate flood damages. These practices may help rural farm and forest lands to store runoff and reduce flooding on farms and downstream communities and could be incorporated into a conservation program to provide payments for these efforts, which would supplement traditional farm incomes. Despite their potential, there have been very few methodical assessments and detailed summaries of NBS to date. We identified and summarized potential flood reduction practices for the Coastal Plain of North Carolina. These include agricultural practices of (1) cover cropping/no-till farming; (2) hardpan breakup; (3) pine or (4) hardwood afforestation, and (5) agroforestry; establishing the wetland and stream practices of (6) grass and sedge wetlands and earthen retention structures, (7) forest wetland banks, and (8) stream channel restoration; and establishing new structural solutions of (9) dry dams and berms (water farming) and (10) tile drainage and water retention. These practices offer different water holding and storage capacities and costs. A mixture of practices at the farm and landscape level can be implemented for floodwater retention and attenuation and damage reduction, as well as for providing additional farm and forest ecosystem services.

20 March 2023 in Science of The Total Environment
Verified
Journal Article
Open access
JKJack Kurki-Fox
Jack Kurki-Fox
BDBarbara A. Doll
Barbara A. Doll
BMBonnie Monteleone
Bonnie Monteleone
KWKayla West
Kayla West
GPGloria Putnam
Gloria Putnam
Uwe SchneidewindUwe Schneidewind
Uwe Schneidewind
While microplastics (MP) have been found in aquatic ecosystems around the world, the understanding of drivers and controls of their occurrence and distribution have yet to be determined. In particular, their fate and transport in river catchments and networks are still poorly understood. We identified MP concentrations in water and streambed sediment at fifteen locations across the Neuse River Basin in North Carolina, USA. Water samples were collected with two different mesh sizes, a trawl net (>335 μm) and a 64 μm sieve used to filter bailing water samples. MPs >335 μm were found in all the water samples with concentrations ranging from 0.02 to 221 particles per m3 (p m-3) with a median of 0.44 p m-3. The highest concentrations were observed in urban streams and there was a significant correlation between streamflow and MP concentration in the most urbanized locations. Fourier Transform Infrared (FTIR) analysis indicated that for MPs >335 μm the three most common polymer types were polyethylene, polypropylene, and polystyrene. There were substantially more MP particles observed when samples were analyzed using a smaller mesh size (>64 μm), with concentrations ranging from 20 to 130 p m-3 and the most common polymer type being polyethylene terephthalate as identified by Raman spectroscopy. The ratio of MP concentrations (64 μm to 335 μm) ranged from 35 to 375, indicating the 335 μm mesh substantially underestimates MPs relative to the 64 μm mesh. MPs were detected in 14/15 sediment samples. Sediment and water column concentrations were not correlated. We estimate MP (>64 μm) loading from the Neuse River watershed to be 230 billion particles per year. The findings of this study help to better understand how MPs are spatially distributed and transported through a river basin and how MP concentrations are impacted by land cover, hydrology, and sampling method.

6 June 2020 in Water
Verified
Journal Article
Open access
PDF file
BDBarbara Doll
Barbara Doll
JKJack Kurki-Fox
Jack Kurki-Fox
DLDaniel E. Line
Daniel E. Line
Recent extreme rainfall events produced severe flooding across North Carolina’s Coastal Plain, revealing deep vulnerabilities in many communities. Climate change is expected to exacerbate these problems by further increasing rainfall intensity and the frequency of extreme rainfall events. Due to the risks posed by these changing rainfall patterns, a shift in the approach to infrastructure planning and management is needed for many floodprone communities, particularly in regard to managing streams and floodplains in urban areas. This study proposes a framework for systematically evaluating stream restoration in combination with engineered improvements to culvert and bridge crossings to identify and optimize options for mitigating extreme events in urban areas. To illustrate the methodology, extensive hydraulic modeling was conducted to test four different strategies for reducing flooding along a channelized and armored stream, Big Ditch, located in Goldsboro, North Carolina, USA. The results indicate that neither floodplain restoration nor infrastructure modification alone could alleviate flooding along Big Ditch. Rather, a combination approach would be required to mitigate flooding, which could result in substantial benefits for storms in excess of the 100-year event. The results suggest that shifting to a multi-faceted approach to improve resiliency to extreme events could improve public safety and reduce future damages due to flooding.

5 May 2022 in Water
Verified
Journal Article
Open access
PDF file
JKJack Kurki-Fox
Jack Kurki-Fox
BDBarbara Doll
Barbara Doll
DLDaniel E. Line
Daniel E. Line
MBMadalyn E. Baldwin
Madalyn E. Baldwin
TKTravis M. Klondike
Travis M. Klondike
AFAndrew A. Fox
Andrew A. Fox
As the frequency of more intense storms increases and concerns grow regarding the use of dams and levees, the focus has shifted to natural infrastructure (NI) for flood mitigation. NI has shown some success at small scales; however, little work has been carried out at the large watershed scale during extreme events. Three NI measures (afforestation, water farming, and flood control wetlands) were evaluated in the Neuse River Basin of eastern North Carolina. Detailed geospatial opportunity and hydrologic modeling of the measures were conducted in three subwatersheds of the basin and results were extrapolated to other subwatersheds. NI opportunity was greater and associated modeled peak flow reductions were larger for two subwatersheds located in the lower portion of the basin, where there is less development and flatter land slopes. Peak flow reductions varied spatially depending on the type and placement of NI combined with the hydraulic and morphologic characteristics of the stream network. Extrapolation of reductions to other subwatersheds produced a 4.4% reduction in peak flow for the 100 year storm at the outlet of the river basin in Kinston as a result of water farming on 1.1%, wetlands controlling runoff from 5.7%, and afforestation of 8.4% of the river basin.

30 May 2020 in Water
Verified
Journal Article
Open access
PDF file
BDBarbara Doll
Barbara Doll
JKJack Kurki-Fox
Jack Kurki-Fox
JPJonathan L. Page
Jonathan L. Page
NNNatalie Nelson
Natalie Nelson
JJJeffrey Johnson
Jeffrey Johnson
Stream restoration for mitigation purposes has grown rapidly since the 1980s. As the science advances, some organizations (Chesapeake Bay Program, North Carolina Department of Environmental Quality) have approved or are considering providing nutrient credits for stream restoration projects. Nutrient treatment on floodplains during overbank events is one of the least understood processes that have been considered as part of the Chesapeake Bay Program’s Stream Restoration Nutrient Crediting program. This study analyzed ten years of streamflow and water quality data from five stations in the Piedmont of North Carolina to evaluate proposed procedures for estimating nitrogen removal on the floodplain during overbank flow events. The volume of floodplain flow, the volume of floodplain flow potentially treated, and the nitrogen load retained on the floodplain were calculated for each overbank event, and a sensitivity analysis was completed. On average, 9% to 15% of the total annual streamflow volume accessed the floodplain. The percentage of the average annual volume of streamflow potentially treated ranged from 1.0% to 5.1%. Annually, this equates to 0.2% to 1.0% of the total N load retained/removed on the floodplain following restoration. The relatively low nitrogen retention/removal rates were due to a majority of floodplain flow occurring during a few large events each year that exceeded the treatment capacity of the floodplain. On an annual basis, 90% of total floodplain flow occurred during half of all overbank events and 50% of total floodplain flow occurred during two to three events each year. Findings suggest that evaluating only overbank events may lead to undervaluing stream restoration because treatment is limited by hydrologic controls that restrict floodplain retention time. Treatment is further governed by floodplain and channel size.

14 May 2025 in Earth Surface Processes and Landforms
Verified
Journal Article
Open access
LELayla El‐Khoury
Layla El‐Khoury
JKJack Kurki-Fox
Jack Kurki-Fox
BDBarbara Doll
Barbara Doll
Excessive or accelerated streambank erosion can harm stream ecosystems and negatively impact water supply and infrastructure systems. Streambank erosion can be the most significant source of in‐stream sediment loads and associated contaminants. Site‐specific, low‐cost and timesaving methods to quantify active erosion rates are needed to identify and prioritize locations for restoration actions focused on reducing sediment loads and improving stream functions. Therefore, we examined several methods for quantifying streambank erosion at smaller spatial and temporal scales that are typical of most restoration projects. Physical surveys, aerial imagery analysis and Unmanned Aircraft System (UAS) based light detection and ranging (LiDAR) surveys were conducted to document erosion at three streams in the Blue Ridge and Ridge and Valley regions of Virginia. Three methods were used to quantify bank retreat: 1) cross‐section (XS) surveys, 2) top‐of‐bank (TOB) surveys and 3) aerial imagery analysis. The bank retreat rates were compared to rates estimated from aerial images collected during 2007 to 2019. All three methods were then paired with field‐measured bank heights to estimate the volume of erosion. Reachwide erosion volumes were also estimated with digital elevation models (DEM) of Difference (DoD) using LiDAR data collected with an UAS. The estimated eroded sediment volumes varied widely across all methods but were of a similar magnitude. DoD produced the lowest estimated sediment loads, highest uncertainty and was statistically different from the average of the maximum erosion measured at all cross‐sections. The volume of streambank erosion ranged from 0.18 to 1.26 m3/m/yr across all sites for all methods excluding DoD. Based on the small size of our study streams and the short monitoring period (one to two years), DoD was the least suitable method. Selecting the appropriate method for documenting and quantifying erosion depends on the time available, the purpose of estimating erosion, the resolution required and stream conditions.