As natural disasters and abnormal weather phenomena continue to cause damage to power systems, resilience has become a critical characteristic for future power grids. While microgrids (MGs) have been studied as a potential source of resilience, previous research has mainly focused on operational strategies to improve the resilience of existing MGs. This study proposes a planning approach for a gas-electric-based integrated multi-energy system that includes a microgrid to enhance the power grid's resilience against serious failures. The approach includes an operational process to achieve a specific resiliency level at the lower level, and a bi-level optimization method that considers cost effects at the upper level. The proposed method uses mixed-integer linear programming (MILP) to establish the operational process based on the required resilience level and determine the optimal location for each asset in the microgrid. The effectiveness of the proposed method is evaluated using the IEEE 33 Bus test system in various severe failure scenarios. The results demonstrate that the proposed planning approach can effectively enhance the resilience of power grids through the integration of microgrids, and the bi-level optimization method can provide an optimal solution while considering the cost-effectiveness of the microgrid.
The microgrid is a power distribution system that supplies power from distributed generation to end-users. Demonstration projects and R&D regarding microgrids are currently in development in several advanced countries. In South Korea, renewable energy-based microgrid demonstration projects are carried out mainly as island or university campus grids. These R&D efforts aim to popularize microgrid systems in South Korea while considering the limited land availability, which impedes the widespread distribution of photovoltaic systems and the microgrid market’s growth. This study presents a floating photovoltaic system configured as an island microgrid combined with a hybrid power system. The floating photovoltaic system is configured on an idle water body integrated with an existing pumped hydroelectric system. The integration of a current pumped hydroelectric system minimizes a battery energy storage requirement, which compensates for the renewable energy sources’ intermittent power output. We evaluate the optimal power flow of the setup using a reliability index to ensure a stable power supply within the standalone microgrid and maximize the supply power range according to the demand response.
Establishing electric vehicle supply equipment (EVSE) to keep up with the increasing number of electric vehicles (EVs) is the most realistic and direct means of promoting their spread. Using traffic data collected in one area; we estimated the EV charging demand and selected priority fast chargers; ranging from high to low charging demand. A queueing model was used to calculate the number of fast chargers required in the study area. Comparison of the existing distribution of fast chargers with that suggested by the traffic load eliminating method demonstrated the validity of our traffic-based location approach.
Reliability is an important index which determines the power service and quality provided to customers. As the demand increases continuously and the system changes in accordance with the environmental regulation, the reliability assessment in the distribution system becomes crucial. In this paper, we propose methods for improving the reliability of the distribution system using electric vehicles (EVs) in the system. In this paper, EVs are used as power supplying devices, such as a transportable energy storage system (ESS) which supplies power when fault occurs in the system, and by using a time–space network (TSN) in particular, EV capacity in accordance with the load arrival time was calculated. Unlike other existing reliability assessments, we did not use the average load of customers. Instead, by taking into account the load pattern by times, we considered the priority for load supply in accordance with the failure scenarios and failure times. Based on the priority calculated for each time of failure and failure scenario, plans for EV operation to minimize expected customer interruption cost (ECOST), the reliability index in the distribution system, were established. Finally, a case study was performed using the IEEE RBTS (Roy Billinton Test System) 2 Bus and the performance of the model proposed in this paper was verified based on the result.
25 January 2024 in International Journal of Electrical Power & Energy Systems
This paper presents the VCHP platform as a solution to address PV curtailment and line congestion in scenarios of increasing renewable energy penetration. Solar PV generation profiles and load profiles were generated for three scenarios (2025, 2030, and 2035) using data provided by KPX. Modifications were made to the IEEE 30 Bus model to accurately reflect the Korean power system, including the introduction of PCA and LCA at relevant buses. Line congestion was evaluated using metrics such as TUR, STUR, and TLR. The research findings indicate that integrating the VCHP platform in all scenarios effectively alleviates line congestion, as shown by the TUR remaining below 1. Importantly, the reduction in line losses exceeds the decrease in power flow, demonstrating the effectiveness of VCHP in reducing power losses. The results suggest that as renewable energy sources increase, line congestion issues may arise in the existing power system. However, integrating the proposed VCHP platform is a valuable solution for effectively utilizing surplus PV energy and improving the stability of the power grid. The adoption of such a platform can significantly enhance the operation and management of the power system.