Dong-Min Kim

Prof. Dr. Dong-Min Kim

Department of Electrical Engineering, Kangwon National University, Samcheok, Republic of Korea
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 August 2021 in IEEE Access
Verified
Journal Article
Open access
YSYeong Geon Son
Yeong Geon Son
BOByeong-Chan Oh
Byeong-Chan Oh
MAMoses Amoasi Acquah
Moses Amoasi Acquah
RFRui Fan
Rui Fan
Dong-Min KimDong-Min Kim
Dong-Min Kim
SKSung-Yul Kim
Sung-Yul Kim
The increasing penetration of renewable resources causes some challenges like the electric power demand prediction uncertainty and energy surplus. Energy storage systems (ESS) are promising solutions for these challenges. However, considering the marginal capacity of ESSs according to the installation area and the economic portion of ESSs according to the installation capacity, the use of battery ESSs to reduce surplus energy is not efficient and has practical limitations. To efficiently resolve the challenges, a multi-energy system (MES) that is capable of operating different energy sources, such as natural gas storage (NGS), thermal energy storage (TES), ice energy storage (IES), and hydrogen energy storage (HES) has been proposed. The centerpiece of converting and managing multiple energy sources associated with the MES is the energy hub (EH). In this paper, we reviewed and compared the performance of existing ESSs and the MES, and the results have demonstrated the superiority of the MES. In addition, EHs that include power-to-gas, combined heat power, and combined cooling heat power, have been examined based on their structural characteristics. A review of the methods and the primary purpose of MES is also highlighted in this paper.

29 April 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
YCYeon-Ju Choi
Yeon-Ju Choi
BOByeong chan Oh
Byeong chan Oh
MAMoses Amoasi Acquah
Moses Amoasi Acquah
Dong-Min KimDong-Min Kim
Dong-Min Kim
SKSung-Yul Kim
Sung-Yul Kim
The microgrid is a power distribution system that supplies power from distributed generation to end-users. Demonstration projects and R&D regarding microgrids are currently in development in several advanced countries. In South Korea, renewable energy-based microgrid demonstration projects are carried out mainly as island or university campus grids. These R&D efforts aim to popularize microgrid systems in South Korea while considering the limited land availability, which impedes the widespread distribution of photovoltaic systems and the microgrid market’s growth. This study presents a floating photovoltaic system configured as an island microgrid combined with a hybrid power system. The floating photovoltaic system is configured on an idle water body integrated with an existing pumped hydroelectric system. The integration of a current pumped hydroelectric system minimizes a battery energy storage requirement, which compensates for the renewable energy sources’ intermittent power output. We evaluate the optimal power flow of the setup using a reliability index to ensure a stable power supply within the standalone microgrid and maximize the supply power range according to the demand response.

1 October 2017 in CIRED - Open Access Proceedings Journal
Verified
Journal Article
Open access
KJKwang Woo Joung
Kwang Woo Joung
Dong-Min KimDong-Min Kim
Dong-Min Kim
DCDongHee Choi
DongHee Choi
Jung-Wook PARKJung-Wook PARK
Jung-Wook PARK
Hee-Jin LeeHee-Jin Lee
Hee-Jin Lee
JSJun Bo Sim
Jun Bo Sim
This study proposes an energy management system (EMS) for stable operation of isolated microgrid which is composed of diesel generators, wind turbines, photovoltaic generation systems and battery energy storage systems (BESS). In the EMS, a power dispatch control is proposed in order to minimise diesel operation. There is also a state-of-charge (SOC) control to allow continuous use of the BESS. By dispatching the scheduled power of the diesel generators, the SOC can be regulated within its limits. A simulation model for isolated microgrid was developed using DIgSILENT Power Factory® software. To verify the performance of the proposed EMS, case studies are performed using practical data of Dukjuk Island in Korea.

23 November 2023 in IEEE Access
Verified
Journal Article
Open access
In-Su BaeIn-Su Bae
In-Su Bae
ESEun-Tae Son
Eun-Tae Son
SKSung-Yul Kim
Sung-Yul Kim
Dong-Min KimDong-Min Kim
Dong-Min Kim
This study proposes a method for optimizing the cable sizes in the collection systems of wind turbines on offshore wind farms. Although cable size optimizations for offshore wind farms may require a high initial investment, the power losses are considerably reduced over the system lifespan, thereby justifying the high investment. The proposed method employs a simple binary integer programming model that can determine optimum cable sizes and related cable costs (installation and loss costs) with minimal inputs regarding the topology of the wind-turbine collection system. It can be employed to design the electrical infrastructure of offshore wind farms using heuristic or metaheuristic approaches, as it can automatically calculate the power flows in arcs using bus injection to branch current matrices, even if the system topology changes. Furthermore, we have introduced a method of calculating the power losses by accounting for the diverse capacities and availabilities of WTs to reflect the actual characteristics of WTs. Our method was validated at two offshore wind-farm sites in the Southwestern Sea of Korea, one 60 MW and the other 400 MW, and this study provides some simple examples and the related parameters. Owing to the optimal cable size, the proposed technique (combined with K-clustering based genetic algorithm) demonstrated cost savings in the range of 1.55%-2.21% within the wind-turbine collection system when compared with the conventional metaheuristic methods. Moreover, the cost-based topology modifications achieved cost savings in the range of 0.18%-0.66%.

20 December 2022 in Energies
Verified
Journal Article
Open access
PDF file
YSYeong Geon Son
Yeong Geon Son
ESEun-Tae Son
Eun-Tae Son
MAMoses Amoasi Acquah
Moses Amoasi Acquah
SCSung-Hoon Choo
Sung-Hoon Choo
HJHyunsik Jo
Hyunsik Jo
SKSung-Yul Kim
Sung-Yul Kim
In South Korea, Renewable Energy Sources (RES) have been increasing with the application of energy policies, such as Feed in Tariff (FIT) and the Renewable Portfolio Standard (RPS). However, a rapid increase in RES supply leads to an uncertain power supply due to the intermittent output of RES. A representative example is the curtailment of Wind Turbines (WT), which frequently occurs in Jeju Island, South Korea. The proportion of RES power on Jeju Island is 67%, and there are cases where WT is curtailed among the operable sections to maintain the balance of power supply and demand. This paper applies Power-to-Gas (P2G) technology to hydrogenate, store, and utilize unused power to solve this problem. In this paper, Aewol-eup in Jeju Island is selected as a target site for case study. An Integrated Energy System (IES) for various energy operations is designed to control RES output. This paper proposes the optimal facility configuration and finally drives the optimal design and operation solution of IES by analyzing the objective functions and focusing on the Independent Power Producer (IPP) perspective.

15 March 2022 in Energies
Verified
Journal Article
Open access
PDF file
ESEun-Tae Son
Eun-Tae Son
In-Su BaeIn-Su Bae
In-Su Bae
SKSung-Yul Kim
Sung-Yul Kim
Dong-Min KimDong-Min Kim
Dong-Min Kim
Recently, it has been suggested that microgrids (MGs) can improve the resilience of distribution systems. However, predictions about future faults are uncertain. This makes calculating the exact value of the benefits of system resilience enhancement close to impossible at the time of MG planning. Therefore, this paper proposes a framework for MG planning, which focuses on resilience estimation. To consider the uncertainties of future failure events, the proposed method for estimating the resilience utilized the Monte Carlo simulation. In addition, an optimal scenario was estimated using a cost–benefit analysis and constraints on the expected value of resilience enhancement. In the case study, an actual MG installation at D-university was evaluated to obtain the optimal MG planning scenario. The results show that the capacity and installation locations of the distributed generators (DGs) impact the resilience enhancement. The proposed method can effectively derive the optimal MG planning scenario by evaluating the possibility of future operations based on the segmentation of both the system configuration and type of DG to improve the resilience of distribution systems.