Shengsheng Li

Shengsheng Li

Auto-generated profile, based on publicly available information

Shengsheng Li

Nanjing NARI Information Communication Technology Co., Ltd.,Nanjing,China

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2013 in Advances In Space Research
Verified
Journal Article
Closed access
MLMingzhi Luo
Mingzhi Luo
ZYZhouqi Yang
Zhouqi Yang
JLJingbao Li
Jingbao Li
HXHuiyun Xu
Huiyun Xu
SLShengsheng Li
Shengsheng Li
PSPeng Shang
Peng Shang

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
ZXZhipeng Xu
Zhipeng Xu
XFXuhai Feng
Xuhai Feng
SLShengsheng Li
Shengsheng Li
LFLiming Fan
Liming Fan
CLChangwu Liu
Changwu Liu
In shaft construction, conducting shaft drilling and pregrouting simultaneously is expected to speed up the sinking rate and save the cost. Reasonable determination of the spatial locations of the drilled shaft and grouting holes and proper defining of the start time of each construction work are the crucial techniques. To smoothly execute the simultaneous operations, the bedrock to be grouted is divided into two sections. The upper bedrock is injected first using straight grouting holes to act as a tight cover to protect shaft drilling. Then, the lower formations are grouted using S‐shaped grouting holes, which are performed simultaneously with shaft drilling. The construction time of simultaneous operations of pregrouting for the lower bedrock using S‐shaped holes and shaft drilling is the saved time. The main technical challenges include the stability of grouting holes and safety of shaft walls, as well as the disposal of the contaminative waste drilling mud. The stability of grouting holes which might affect by the shaft drilling‐induced ground vibration could be evaluated according to the penetration of ground vibration caused by TBM tunnelling. If the grouting hole is in the range of ground vibration, protective measures including casing and ground improvement should be utilized to ensure the stability of grouting holes. The stability of unlined walls of the drilled shaft caused by the increased groundwater pressure can be achieved by a tight cover between the drilled shaft and pregrouting holes. The thickness of the cover is actually the length of the straight holes. The cover should have sufficient thickness and impermeability, which can considerably reduce or even completely stop the increased groundwater pressure in vicinity of the drilled shaft. The thickness and permeability of the cover could be determined using Maag’s solution for penetration of grouts in porous media. On the other hand, the waste drilling mud with proper modifications can be reutilized to prepare clay‐cement‐like grouts, which could provide an eco‐friendly and cheap solution to harmlessly treat the huge volume of waste drilling mud. The properties of waste drilling mud and behaviors of grouts prepared using the waste mud should be experimentally investigated before reutilization, owing to uncertainties of geology in various cases. The construction time using the simultaneous operation method is just about 60% of that of the traditional excavation method, and the low value of measured residual water inflow shows the reliability of reusing the waste drilling mud as grouting materials. The proposed method could virtually improve the shaft sinking rate and save the construction cost. The principles developed for these technical challenges have been proved to be applicable in practices, which are believed to strongly support the applicability of this new method in other cases.

26 May 2023
Verified
Conference Paper
Closed access
SLShengsheng Li
Shengsheng Li
LLLi Li
Li Li
JTJinjin Tu
Jinjin Tu
RJRui Jiang
Rui Jiang
Yue YuYue Yu
Yue Yu
XDXiaowei Du
Xiaowei Du
With the increasingly complex indoor environment nowadays, people still have high requirements for indoor positioning accuracy. Indoor positioning errors are mainly caused by signal band interference and non-line-of-sight. In the face of frequency band interference, this paper chose Ultra-Wide-Band signal as the positioning basis. Deal with the non-line-of-sight, this paper proposed an indoor positioning system based on improved Kalman filter, which reduces the new error caused by Kalman filter in complex scene conversion and improves the positioning accuracy. The system used five or more base stations for positioning, and selected the CHAN algorithm, which is sensitive to positioning errors, to solve the initial position. Residual processing was performed on the initial position and the positions of each base station to generate a credible factor, and then different confidence regions were divided according to the factor. For different confidence regions, the Kalman filter gain coefficient K was pre-set to improve the stability of the positioning results for frequent transitions between line-of-sight and non-line-of-sight scenes. The experimental results show that the system can reduce the error to 80cm in the simulation environment. And in actual scenes, it can reduce to 60cm.

18 August 2023
Verified
Conference Paper
Closed access
ZZZiqian Zhang
Ziqian Zhang
YCYu Chen
Yu Chen
SLShengsheng Li
Shengsheng Li
SWShenliang Wang
Shenliang Wang
LLLi Li
Li Li
For current challenges of multi-dimensional data sharing and business integration of power transmission and transformation main equipment, this paper proposes a method for visual data fusion based on a digital twin in the power grid resource business center and conducts application verification finally. This paper is driven by the presentation and inter-action of digital twins, with scene interaction fusion as the main mode to construct twin scenes. Multiple information is embedded into the twin scenes as a supplement. For the cross-scale characteristics that need to be considered in large-scale geographic scenes and small-scale fine 3D models of power grid equipment, tile caching technology is used for map and satellite data fusion, the front-end and back-end separation of a four-layer logical architecture is used for 3D scene data fusion and free view video scene fusion is based on embedded camera positioning guided feature point texture. Finally, the above methods are applied and verified. The results showed that the above comprehensive technology can effectively solve the integration problem of facilities and surrounding environment, thereby meeting the actual production and operation needs.