xingchen shangguan

Dr. xingchen shangguan

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 September 2020 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
XSxingchen shangguan
xingchen shangguan
Chuan-Ke ZhangChuan-Ke Zhang
Chuan-Ke Zhang
YHYong He
Yong He
Li JinLi Jin
Li Jin
LJLin Jiang
Lin Jiang
Min WuMin Wu
Min Wu
Uncertain transmission delays and sampling periods, parameters uncertainties regarding the power system, load fluctuations, and the intermittent generation of renewable energy sources (RESs) will significantly influence a power system's frequency. This paper designs a robust delay-dependent PI-based load frequency control (LFC) scheme for a power system based on sampled-data control. First, a sampled-data-based delay-dependent LFC model of power system is constructed. Then, by applying the Lyapunov theory and the linear matrix inequality technique, a novel stability criterion is developed for the LFC of the power system by considering the sampling period and transmission delay of the communication network, which ensures that the proposed scheme operates in large sampling periods and under transmission delays. Next, an exponential decay rate (EDR) is introduced to guide the design of a robust PI-based LFC scheme. The LFC scheme with robustness is designed by setting a small EDR. The values of EDR are adjusted by the given robust performance evaluation conditions of parameter uncertainties and $H_\infty$ performance. Finally, case studies are carried out based on a one-area power system and a three-area power system with RESs. Simulation results show that the proposed LFC scheme performs strong robustness against parameter uncertainties regarding the power system and communication network, load fluctuations, and the intermittent generation of RESs.

19 April 2021 in IEEE Transactions on Control Systems Technology
Verified
Journal Article
Closed access
XSxingchen shangguan
xingchen shangguan
YHYong He
Yong He
Chuan-Ke ZhangChuan-Ke Zhang
Chuan-Ke Zhang
Li JinLi Jin
Li Jin
Wei YaoWei Yao
Wei Yao
Min WuMin Wu
Min Wu
Load frequency control (LFC) of modern power systems tends to employ open communication networks to transmit measurement/control signals. Under a limited network bandwidth, the continuous and high-sampling-rate signal transmission will be prone to degradation of the LFC performance through network congestion. This brief proposes a decentralized control performance standards (CPSs)-oriented event-triggered (ET) LFC scheme for power systems under constrained communication bandwidth. The proposed scheme comprises the ET LFC scheme and the CPSs-oriented regulation scheme. In the CPSs-oriented regulation scheme, regulation rules are designed to adjust the threshold parameter of the ET LFC scheme based on the North American Electrical Reliability Council (NERC)’s CPS1 and CPS2. The rules generate a larger threshold parameter to lower the triggering frequency in order to reduce unnecessary transmission of measurement/control signals, while ensuring the frequency and tie-lie power of the power systems to meet the required CPS1 and CPS2 instead of the asymptotic stability requirement in the existing research. The reduced transmission of these signals lessens the communication burden. In addition, the decentralized control strategy is used to solve the problems of poor large scalability and computational dimension caused by the centralized control strategy. The effectiveness of the proposed scheme is evaluated on an IEEE 39-bus test system with renewable energy sources.

1 July 2022 in IEEE Transactions on Industrial Electronics
Verified
Journal Article
Closed access
XSxingchen shangguan
xingchen shangguan
YHYong He
Yong He
Chuan-Ke ZhangChuan-Ke Zhang
Chuan-Ke Zhang
Wei YaoWei Yao
Wei Yao
YZYifan Zhao
Yifan Zhao
Min WuMin Wu
Min Wu
Load frequency control (LFC) of modern power systems tends to employ open communication networks to transmit measurement/control signals, which makes the LFC scheme more vulnerable to random time delays and time-delay attacks (TDAs). In this article, a resilient and active time-delay-compensation-based LFC scheme is proposed to compensate the random time delays and TDAs. At first, a state observer is employed to estimate the state of the LFC system. Then, a networked predictive control method is used to predict the control signals of the system in future moments. Next, an evaluation and compensation scheme for random time delays and TDAs is constructed in the actuator side of the LFC scheme based on the updating period of the actuator and the timestamp technique. Due to the stochastic characteristics of the random time delays or TDAs, the stability condition of the proposed scheme is developed with the aid of the mean-square stability theory. Moreover, a dual-loop open communication is employed in the proposed scheme to improve the reliability and resilience. At last, simulation and experiment tests are undertaken to demonstrate the effectiveness of the proposed scheme.

1 February 2020 in Applied Energy
Verified
Journal Article
Closed access
XSxingchen shangguan
xingchen shangguan
YHYong He
Yong He
CZChuanke Zhang
Chuanke Zhang
LJLin Jiang
Lin Jiang
JSJoseph William Spencer
Joseph William Spencer
MWMin Wu
Min Wu

10 February 2021 in IEEE Transactions on Cybernetics
Verified
Journal Article
Closed access
Li JinLi Jin
Li Jin
YHYong He
Yong He
Chuan-Ke ZhangChuan-Ke Zhang
Chuan-Ke Zhang
XSxingchen shangguan
xingchen shangguan
LJLin Jiang
Lin Jiang
Min WuMin Wu
Min Wu
This article presents a novel reconstructed model for the delayed load frequency control (LFC) schemes considering wind power, which aims to improve the computational efficiency for PID controllers while retaining their dynamic performance. Via fully exploiting system states influenced by time delays directly, this novel reconstructed method is proposed with a controller isolated. Hence, when the PID controllers are unknown, the stability criterion based on this model can resolve controller gains with less time consumed. For given PID gains, this model can be employed to establish criteria for stability analysis, which can realize the tradeoff between the calculation accuracy and efficiency. The case study is first based on a two-area traditional LFC system to validate the merits of a novel reconstructed model, including accurately estimating the influence of time delay on system frequency stability with increased computational capability. Then, under traditional and deregulated environments, case studies are carried out on the two-area and three-area schemes, respectively. Through the novel reconstructed model, the efficiency of obtaining controller parameters is highly improved while their robustness against the random wind power, tie-line power changes, inertial reductions, and time delays remains almost unchanged.

14 September 2021 in IEEE Transactions on Fuzzy Systems
Verified
Journal Article
Closed access
XSxingchen shangguan
xingchen shangguan
YHYong He
Yong He
Chuan-Ke ZhangChuan-Ke Zhang
Chuan-Ke Zhang
LJLin Jiang
Lin Jiang
Min WuMin Wu
Min Wu
This article proposesa control performance standard (CPS)-based fuzzy event-triggered scheme for load frequency control (LFC) of power systems with a limited communication bandwidth. First, a CPS-based fuzzy LFC system is established to reduce the wear and tear of the generating unit equipment. Then, based on the Lyapunov stability theory, a stability criterion of the LFC system is proposed to ensure the stable operation of the LFC system, which considers the threshold parameter of the event-triggered condition and the fuzzy gain in the fuzzy LFC system. Next, based on the stability criterion and the Gaussian-type curve-fitting method, a functional expression between the fuzzy gain and the threshold parameter is obtained. According to the expression, the threshold parameter is updated in real time with the change of fuzzy gain, so as to further save usage of the communication network bandwidth. Case studies based on a one-area power system and an IEEE 39-bus benchmark test system are undertaken. Simulation results show that the proposed scheme achieves three objectives: 1) to comply with CPS1 and CPS2 in the North American Electric Reliability Council; 2) to reduce wear and tear of the generating unit equipment; and 3) tosave more communication network resources.