Abdulaziz Saud Almohassen

Dr. Abdulaziz Saud Almohassen

Building Engineering, Imam Abdulrahman Bin Faisal University, Dammam, Saudi Arabia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 January 2023 in Buildings
Verified
Journal Article
Open access
PDF file
SASaleh Alyami
Saleh Alyami
AAAhmed Abd El Aal
Ahmed Abd El Aal
ALI MUFLAH ALQAHTANYALI MUFLAH ALQAHTANY
ALI MUFLAH ALQAHTANY
NANaief Ali Aldossary
Naief Ali Aldossary
RJRehan Jamil
Rehan Jamil
AAAli H. Alsalem
Ali H. Alsalem
Cities around the world increasingly recognize the need to build on their resilience to deal with converging forces such as disasters, environmental degradation, urban sprawl, and climate change. Given the significance of critical infrastructure networks (CINs) for maintaining the quality of life in buildings and communities, improving their resilience is of high importance to governors, planners, and policymakers. Therefore, this study is proposed to spatially analyze the resilience of CINs in Saudi Arabia and to develop a holistic resilience framework for buildings and communities. The research method of this study involves a case study of Najran, including a collection of CIN data, history of natural disasters, and future potential hazards. The data were compiled to list the basic parameters required for the development of resilience criteria. Overall results show that CINs in the city of Najran were performing below average compared with the measurement criteria. The study highlights the need to make improvements in terms of the robustness, redundancy, and flexibility of the CINs in the city. Moreover, this paper proposes a holistic framework of key aspects of resilient criteria that need to be taken into account by the city governor, policymakers, and developer bodies for better management of available infrastructure and its development in future years.

23 May 2022 in Ain Shams Engineering Journal
Verified
Journal Article
Open access
Abdulaziz Saud AlmohassenAbdulaziz Saud Almohassen
Abdulaziz Saud Almohassen
MAMohammed S. Alkhaldi
Mohammed S. Alkhaldi
MSMohammed Essam Shaawat
Mohammed Essam Shaawat
The coronavirus (COVID-19) pandemic was recognized as a worldwide epidemic and classed as a high risk in early 2020, affecting people's health, economies, and business sectors considerably. This pandemic has had an impact on people's lifestyles and work processes in a multitude of sectors. The construction industry is one such industry that has had a substantial influence on it. However, this influence needs to be measured in different areas. This study aims to measure the effects of the COVID-19 on the 7 core safety elements and their 24 procedures that are derived from the recommended practices for safety and health programs in construction that is issued by OSHA to see whether their priorities have been changed or not. The data were collected and then analyzed using Relative Importance Index (RII) to study the changes in their priorities; and using t-test to study the significance of the changes before and after COVID-19 pandemic.

3 May 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
MSMohamed Essam Shaawat
Mohamed Essam Shaawat
SASaleh Mohammed Saed Alqahtani
Saleh Mohammed Saed Alqahtani
AQAltayeb Qasem
Altayeb Qasem
RJRehan Jamil
Rehan Jamil
Abdulaziz Saud AlmohassenAbdulaziz Saud Almohassen
Abdulaziz Saud Almohassen
UBUmaru Mohammed Bongwirnso
Umaru Mohammed Bongwirnso
The quality performance of contractors in sustainable construction projects is a major concern for the industry. Over the past decade, studies on measurements, factors, and indicators for assessment of the professional conduct of construction companies are to be found in the sustainable construction management literature. There is adequate evidence over the last decade that an increasing number of construction professionals have adopted the measurement of the professional conduct of contractors as a tool to support their future decisions. The method of the Analytical Hierarchy (AHP) process has been deployed to identify the major factors and sub-factors involved in sustainable construction in Saudi Arabia. Using several governing factors, including quality of document submittals (QDS), quality system implementation (QSI), and quality of construction works (QCW), a working framework was developed by using the pair-wise comparison method. The results show that proper accountability and keen consideration of factors that could hinder sustainable construction by contractors contribute to the development of a better perspective on quality issues. After a critical analysis, a Performance Quality Index was developed, and a benchmark value was obtained. The benchmark value of PQI will assist project managers and owners in the sustainable construction sector as a reference for future improvement in the quality performance of contractors.

26 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
SASaeed Alaw
Saeed Alaw
AQAltayeb Qasem
Altayeb Qasem
SSSultan Hamoud Suayqir
Sultan Hamoud Suayqir
WAWaleed Khalid Alabaidi
Waleed Khalid Alabaidi
AAAmer khalid Alasaibia
Amer khalid Alasaibia
Abdulaziz Saud AlmohassenAbdulaziz Saud Almohassen
Abdulaziz Saud Almohassen
Change orders in construction projects frequently lead to disputes, schedule delays, and cost overruns, particularly in the rapidly expanding construction sector of Saudi Arabia. Traditional techniques for resolving claims like litigation and arbitration are predominantly reactive in nature and do not facilitate proactive assessments of the impact of change orders before disputes materialize. A BIM-based framework is developed in this study to assess change orders in terms of time and cost with visualization functions through an integration of Autodesk Revit, Primavera and Navisworks, combined in a 5D virtual environment. The framework utilizes 3D modelling, scheduling and cost management (3D/4D/5D) supported by virtual reality (VR) visualization to create an interactive decision support platform for the project stakeholders. A real residential building case study was utilized to validate the framework, and a design modification was developed and analyzed using the BIM environment. The project cost has increased as a result of change order from SAR 411,437.26 to SAR 428,280.16, which is 4.1% of the total project cost. Also, there are deviations in the schedule which occurred from Month 4. The study results show that the suggested integrated BIM-based framework assesses the impact of change order, physically and visually, on the project time and cost that was required by the industry. The study is innovative in bringing together BIM layout, scheduling, and cost management with VR-supported visualization in a single decision support environment, allowing stakeholders to take into account the implications of change orders before they become real claims and disputes. The proposed framework allows transparent communication, collective decision making with stakeholders and early impact assessment, in contrast to existing approaches whose focus is primarily on claim resolution or improving coordination. This will improve project performance and how change orders are managed.

19 May 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
SASaeed Faez Alaw
Saeed Faez Alaw
AQAltayeb Qasem
Altayeb Qasem
SSSultan Hamoud Suayqir
Sultan Hamoud Suayqir
WAWaleed Khalid Alabaidi
Waleed Khalid Alabaidi
AAAmer Khalid Alasaibia
Amer Khalid Alasaibia
Abdulaziz Saud AlmohassenAbdulaziz Saud Almohassen
Abdulaziz Saud Almohassen
Disputes over change orders on construction projects often arise due to varying interpretations and priorities of the key stakeholders, namely the owners, designer and contractor. This problem is particularly evident in the flourishing construction sector of the Kingdom of Saudi Arabia due to the delay of large-scale projects. A significant reason for these delays is huge claims on changes orders and traditional means of resolution such as litigation and arbitration are not able to yield timely resolutions. These challenges highlight the need to better manage and assess the impacts of change in a more proactive manner. This research proposes the BIM-based framework which offers the solution to the above-mentioned challenges through the creation of the Integrated Virtual Environment. The setup involves linking Revit for 3D modelling with Navisworks for coordination and visualization, and Primavera for scheduling and cost control into a seamless network. This link allows project information to be displayed in an orderly manner. Furthermore, any changes in design will be connected to the effect on time and cost. In this virtual environment, the framework aims to capture and visualize the effects of change orders in terms of schedule delays and cost overruns. This approach helps the stakeholders to trace how the changes are spreading in different dimensions of the project providing a clearer and common understanding of what changes those will bring. Having more light helps with better conversations, helps with discussions at the start, and helps avoid claims. The overall findings suggest that the combined use of BIM and project management tools may create a consistent virtual platform for the analysis of change orders and their impacts on time and cost. Through a real case study, the framework is developed and validated to showcase its practical capability of aiding decision-making, reducing disputes, and improving overall project performance. The effective management of change is vital in minimizing delays and facilitating better project delivery, especially in the fast-growing construction industry of Saudi Arabia.

23 September 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
AQAltayeb Qasem
Altayeb Qasem
OAOthman AlShamrani
Othman AlShamrani
Abdulaziz Saud AlmohassenAbdulaziz Saud Almohassen
Abdulaziz Saud Almohassen
FAFahad Alyami
Fahad Alyami
AQAbdullah Saeed Qahtani
Abdullah Saeed Qahtani
MAMubarak Saad Aldossary
Mubarak Saad Aldossary
Hospital fire safety standards in Saudi Arabia remain primarily prescriptive and do not explicitly account for patient mobility constraints, complex building geometry, and time-dependent fire dynamics. The 2015 Jazan Hospital fire, which claimed 25 lives and injured more than 100 people, demonstrated that code compliance alone cannot guarantee occupant safety. This study presents a four-phase BIM framework integrating Autodesk Revit, PyroSim/FDS fire simulation, and Pathfinder agent-based evacuation simulation, applied to a 250-bed hospital in Qatif, Saudi Arabia. The FDS computational mesh was assessed at D*/δx = 12.2 against NIST NCSTAR 1-5E benchmark data (mean errors: temperature 6.8%, smoke optical density 7.2%), and Available Safe Egress Time (ASET) was determined using the multi-criterion ISO 13571:2012 methodology. Under the examined SBC 2018 baseline (Scenario 1, four corridor-end exits), smoke penetrated the ICU corridor within 60 seconds, yielding ASET = 118 s and a Monte Carlo Required Safe Egress Time (RSET) of 412 ± 35 s (n = 50; approximate 95% CI for the mean: 402–422 s), an ASET–RSET deficit of 294 seconds. Scenario 2, incorporating fire-rated ICU/OR compartmentation and ten distributed emergency exits, extended the reported ASET beyond 185 s and reduced mean RSET to 281 ± 22 s (approximate 95% CI for the mean: 275–287 s), a descriptive reduction of 32%. On the reported ASET range of 185–225 s, however, RSET remains greater than ASET; the residual deficit is 56–96 s. Sensitivity analysis across three ignition locations indicates that the Scenario 1 deficit is not specific to one fire origin. The findings support performance-based BIM simulation as a complement to prescriptive code assessment in hospitals.