Antonio Salzano

Dr. Antonio Salzano

Federico II University of Naples
orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 May 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Antonio SalzanoAntonio Salzano
Antonio Salzano
Stefano CasconeStefano Cascone
Stefano Cascone
EZEnrico Pasquale Zitiello
Enrico Pasquale Zitiello
MNMaurizio Nicolella
Maurizio Nicolella
In the evolving construction landscape, this study introduces a novel methodology leveraging Building Information Modeling (BIM) to revolutionize safety management across diverse projects. By transitioning from traditional, reactive approaches to a proactive, comprehensive framework, BIM’s integration into the design and execution phases enables the dynamic assessment and mitigation of risks, thereby enhancing workplace safety. Grounded in an extensive literature review and underscored by the implementation in two case studies—the Search for Hidden Particles (SHiP) experiment at CERN and the Basilica of Santa Croce’s façade maintenance in Florence—this research demonstrates BIM’s significant impact on reducing accidents, ensuring adherence to safety protocols, and streamlining project execution. Comparative analysis with traditional methods confirms BIM’s superiority in risk mitigation, safety outcomes, and project efficiency. Stakeholder feedback further validates the methodology’s effectiveness, marking a shift towards its broader adoption for safer, more efficient construction practices. Future directions suggest exploring BIM’s scalability, integration with emerging technologies, and long-term impacts on safety and sustainability, aiming for its standardization across the construction industry.

17 February 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ACAngelo Ciccone
Angelo Ciccone
SSSabrina Di Stasio
Sabrina Di Stasio
Domenico AsproneDomenico Asprone
Domenico Asprone
Antonio SalzanoAntonio Salzano
Antonio Salzano
MNMaurizio Nicolella
Maurizio Nicolella
In the field of infrastructure, the development and application of the openBIM (open Building Information Modeling) approach and related standards (principally Industry Foundation Classes) remain limited with regard to processes in O&M (Operation and Maintenance) phases, as well as the broader context of AM (Asset Management). This article deals with the activities carried out as part of a pilot project based on the need to manage the operation and assess the condition and value of existing infrastructure along the Cancello–Benevento railway line. The principal goal was to systematize information by digitalizing the infrastructure, in order to enable the assessment of possible performance gaps (compared to national railway standards) in the event of integration within the national infrastructure. In compliance with the project requirements, a digitalization strategy was designed for the definition of surveying activities and the implementation of openBIM systems for the development of an object library and a federated digital model, structured within the collaborative platform that was used, and allowing management, maintenance, and subsequent financial evaluation in the broader context of asset management. The project involved the collaboration of railway operators, a university, and a software company that implemented innovative concepts concerning IFC (specifically, IFC4x2 was used) through the development of dedicated software solutions. The digital solution we proposed enabled the use of digital models as access keys to survey and maintenance information (ERP platforms used by the railway operators) that was available in real time. This project was nominated at the buildingSMART awards 2021 and was one of three finalists in the “Asset Management Using openBIM” category.

23 June 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Antonio SalzanoAntonio Salzano
Antonio Salzano
Mattia IntignanoMattia Intignano
Mattia Intignano
CMCarla Mottola
Carla Mottola
Salvatore Antonio BiancardoSalvatore Antonio Biancardo
Salvatore Antonio Biancardo
MNMaurizio Nicolella
Maurizio Nicolella
GDGianluca Dell'Acqua
Gianluca Dell'Acqua
Representation and modeling using the building information modeling (BIM) methodology of civil works have become the subject of increasing attention in recent years, thanks to the potential offered by Open Infrastructure BIM (I-BIM). However, the complexity of infrastructure works, i.e., the variety of construction and technological systems, makes Open I-BIM very complex and challenging. The lack of systemic knowledge on the subject is another challenging factor. The aim of the following research work is to provide a synoptic overview of the existing scientific research, accompanied by the most recent studies in the field of computer modeling, its applications, and the main opportunities that Open I-BIM offers to the infrastructure sector. After a thorough review of 198 scientific articles published between 2013 and 2023, this study systematically presents a holistic review and critical reflection on the current status of the use of Open BIM in the infrastructure sector, with a focus on the development of the tools and methods used. The outcome of this work constitutes a systematic review of the literature with a bibliometric analysis on Open I-BIM, which is able to provide a knowledge base for identifying research trends, common problems, and the potential of developed methods.

8 December 2016 in Sustainability
Verified
Journal Article
Open access
PDF file
UVUmberto Vitiello
Umberto Vitiello
Antonio SalzanoAntonio Salzano
Antonio Salzano
Domenico AsproneDomenico Asprone
Domenico Asprone
Marco Di LudovicoMarco Di Ludovico
Marco Di Ludovico
APAndrea Prota
Andrea Prota
In the last few years, the renovation and refurbishment of existing buildings have become the main activities of the construction industry. In particular, many studies have recently focused on the mechanical and energy performances of existing retrofitted/refurbished facilities, while some research has addressed the environmental effects of such operations. The present study aims to assess the environmental impact of some retrofit interventions on an existing reinforced concrete (RC) building. Once the structural requirements have been satisfied and the environmental effects of these retrofit solutions defined, the final purpose of this study is to identify the most environmentally sustainable retrofit strategy. The environmental impact of the structural retrofit options is assessed using a life-cycle assessment (LCA). This paper sets out a systematic approach that can be adopted when choosing the best structural retrofit option in terms of sustainability performance. The final aim of the study is to also provide a tool for researchers and practitioners that reflects a deep understanding of the sustainability aspects of retrofit operations and can be used for future researches or practical activities.

19 September 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ACAngelo Ciccone
Angelo Ciccone
PSPompilio Suglia
Pompilio Suglia
Domenico AsproneDomenico Asprone
Domenico Asprone
Antonio SalzanoAntonio Salzano
Antonio Salzano
MNMaurizio Nicolella
Maurizio Nicolella
Regulatory activity concerning the management of existing bridges has recently been affected by updates, for instance, in Italy, which calls for a speedy and pragmatic approach based on new technologies such as building information modeling (BIM), when dealing with the survey and risk classification as well as the evaluation and monitoring of structural safety. This paper focuses on the development and integration of a digital solution, based principally on the specific framework developed by the authors, which supports BIM modeling and information management activities, in the structural setting under investigation, through the use of several technologies and tools, namely BIM-authoring, CDE platform and visual programming, in addition to programming in Python. Starting from the organization of a specific BIM object library and the initial data, inserted by means of a custom-made input environment, it was possible to reproduce digital models of bridges in accordance with specific information requirements following the new Level of Information Need setting. The applicability of the proposal is tested on two judiciously chosen real-life cases with different characteristics. Through this implementation, a series of advantages emerge, including expediting traditional procedures for BIM modeling, accessibility and traceability of information—which are constantly updated to support the monitoring of structural safety over time—and the decision-making process related to the bridge management context.

21 November 2020 in CivilEng
Verified
Journal Article
Open access
PDF file
CMChristian Musella
Christian Musella
MSMilena Serra
Milena Serra
Antonio SalzanoAntonio Salzano
Antonio Salzano
CMCostantino Menna
Costantino Menna
Domenico AsproneDomenico Asprone
Domenico Asprone
The problem of managing existing structures before and after seismic events has led to the development of many different strategies across the globe. These aim to mitigate the catastrophic effects of earthquakes on the occupants of a building, as well as improve the management of the emergency that inevitably ensues. This paper explores the use of an openBIM approach to resolve the issues referred to above, which is possible because of two new standards: Industry Foundation Classes and Information Delivery Manuals. A review of the most popular strategies adopted in both the pre- and post-earthquake phases is conducted using a process map. This organizes the relevant steps and processes into tasks, and additionally identifies the points at which information is produced and exchanged and the party responsible for doing so. Also described is how BIM models can be utilized in essential pre- and post-earthquake activities, as well as current benefits and ongoing developments intended to improve the processes themselves.