Mercy Ogunnusi

Dr. Mercy Ogunnusi

School of Built Environment,, Leeds Beckett University, Leeds, UK
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 November 2020 in International Journal of Real Estate Studies
Verified
Journal Article
Open access
PDF file
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
MHMansur Hamma-adama
Mansur Hamma-adama
HSHuda Salman
Huda Salman
TKTahar Kouider
Tahar Kouider
COVID-19, social distancing, self-isolation, quarantine, furlough, palliatives, and many more emerged as the new vocabularies of the entire world, construction industry not excluded. It is precisely a decade from the last pandemic experienced by the human race. However, the most popular disease outbreak called Corona Virus Disease 2019 (COVID-19) was announced, which hit all the nations of the world within four months and was declared a pandemic in March 2020. This outbreak disrupted businesses around the globe, including built asset procurement and facility management. The United Kingdom, through the Construction Leadership Council, for instance, in responding to this unprecedented situation, published a new Site Operating Procedure (SOP). The effect of this Pandemic in these extraordinary times posed both positive and negative impacts in the Architecture, Engineering and Construction, Owner and Operator (AECOO) industry. Its effect has brought about innovative and diverse use of technology in an exemplary manner which may change the course of construction even after the extinction of coronavirus. This study explores the effects of COVID-19 on the built asset procurement and potential opportunities for the construction industry through a quantitative means. A survey was carried out on the built asset procurement professionals for the data collection. 71 questionnaires were received from Architects, Building Engineers, Civil/Structural Engineers, Electrical Engineers, Mechanical Engineers, Construction / Project Managers and Quantity Surveyors. SPSS 25 software (a social science statistical package) was used for the analysis of the data. The result reveals some challenges in the area of workflow and supply chain disruption, new policy issues, workers’ anxiety and review of COVID-19 vs Force Majeure in standard forms of the construction contract. However, opportunities evolved in the field of modern procurement planning, the necessity for virtual working and unique design considerations. This study is essential to paving the way for the development of additional contingency plans and a new working strategy in a minimised human contact situation caused by the pandemic.

23 May 2023 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
Olabode Emmanuel OgunmakindeOlabode Emmanuel Ogunmakinde
Olabode Emmanuel Ogunmakinde
Egbelakin TemitopeEgbelakin Temitope
Egbelakin Temitope
WSWilly Sher
Willy Sher
Temitope OmotayoTemitope Omotayo
Temitope Omotayo
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
Purpose: Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations.Design/methodology/approach: The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021.Findings: The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the meta-analysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability.Originality/value: The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD).

5 December 2020 in Buildings
Verified
Journal Article
Open access
PDF file
Temitope OmotayoTemitope Omotayo
Temitope Omotayo
BABankole Awuzie
Bankole Awuzie
Egbelakin TemitopeEgbelakin Temitope
Egbelakin Temitope
LOLovelin Obi
Lovelin Obi
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
The incessant reportage of cost overruns and abandoned projects in contemporary literature have accentuated the need for a re-examination of the nature of the cost management strategies deployed to these projects. This study explores the potential of kaizen costing strategy to engender effective cost management within construction project delivery systems in developing countries. Data collected during this study were analysed using the analytic hierarchy process (AHP) and systems thinking approaches to determine the criticality of the factors influencing the effective implementation of kaizen costing. Seven (7) archetypes leading to final causal loop diagram identified the incorporation of the plan–do–check–act approach to project and cost planning, the budgeting system of the construction companies, overhead cost reduction during construction and the overall procurement process. Executing these archetypes will potentially reduce high overhead costs, project cost and time overruns, as well as enhance construction industry sector growth policies and construction organisation corporate governance.

13 September 2022 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
HSHuda Salman
Huda Salman
RLRichard Laing
Richard Laing
Abandonment poses a range of effects detrimental to the development of a country such as Nigeria. Restoring such infrastructure in a sustainable manner is a challenge identified in the literature. The aim of this study is to evaluate a novel approach – the technique for order preference by similarity to an ideal solution (TOPSIS) to identify the sustainability criteria for the redevelopment of abandoned infrastructure in Nigeria. The literature evidences use of TOPSIS in various development contexts, but not in the context of redevelopment of abandoned infrastructure. This study explores the potential of TOPSIS in the sustainable redevelopment of abandoned infrastructure in Nigeria through a combination of a quantitative method of data collection – questionnaire – and a case study. The case study focuses on the abandoned Federal Government Secretariat in Lagos. One hundred and sixty-one (161) participants responded to the questionnaire. Data collected were analyzed using TOPSIS analytical technique. Refurbishment is considered as the most sustainable alternative for the redevelopment of abandoned infrastructure. For criteria consideration, structural integrity and foundation categorized under the technological attributes ranked highest for refurbishment and conversion alternatives. Waste generation and prevention and profitability top the list for demolition and procurement respectively. The social benefit of this study is to bring building considered to be an eyesore back into use. The findings from the analysis orchestrates the importance of the built environment research concentrating on innovative frameworks for sustainable redevelopment of abandoned structures in the construction industry.

9 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Temitope OmotayoTemitope Omotayo
Temitope Omotayo
ATAli Murat Tanyer
Ali Murat Tanyer
Jiamei DengJiamei Deng
Jiamei Deng
AKAgnes Kaima
Agnes Kaima
AAAnderson Oghenewaro Akponeware
Anderson Oghenewaro Akponeware
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
The promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a comparative study of capability maturity modelling (CMM) backed by a state-of-the-art (SOTA) review of 24 peer-reviewed publications via a validatory approach using a focus group webinar of eight experts in the UK and Turkiye. The findings, as extracted through a validated CMM framework of seven dimensions, were used to identify the position of the UK and Turkiye in terms of AI in BIM and CE. It was discovered that the UK is in a position regarding adoption, government policies and incentives at a defined level. AI growth is required in terms of technological advancement, education and training, industry readiness, cultural attitudes and resistance because they are in a managed phase. It was confirmed that Turkiye is at the initial stage of AI adoption, education, training, incentives, policies, technology and cultural attitudes. The originality of this study lies in the recommendations for a 10-year CMM adoption timeframe towards an optimised level. The conclusions of this manuscript will influence government, education, research and technological policies in the UK and Turkiye.

1 July 2021 in Proceedings of International Structural Engineering and Construction
Verified
Journal Article
Closed access
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
HSHuda Salman
Huda Salman
RLRichard Laing
Richard Laing