Guillermo Aranda-Mena

Prof. Guillermo Aranda-Mena

orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 June 2009 in International Journal of Managing Projects in Business
Verified
Journal Article
Closed access
Guillermo Aranda-MenaGuillermo Aranda-Mena
Guillermo Aranda-Mena
JCJohn Crawford
John Crawford
ACAgustin Chevez
Agustin Chevez
TFThomas Froese
Thomas Froese
Purpose: The purpose of this paper is to inform project management practice on the business benefits of building information modelling (BIM) adoption.Design/methodology/approach: BIM needs to compete against well‐ingrained methods to deliver projects in a fragmented and rather traditional industry. This paper investigates 47 value propositions for the adoption of BIM under a multiple case study investigation carried out in Australia and Hong Kong. The selected case study projects included a range of public (1) and private (4) sector building developments of small and large‐scale. Findings are coded, interpreted and synthesised in order to identify the challenges and business drivers, and the paper focuses mainly on challenges and benefits for architectural and engineering consultants, contractors and steel fabricators. As a condition for the selection criteria all case studies had to be collaborating by sharing BIM data between two or more consultants/stakeholders. As practices cannot afford to ignore BIM, this paper aims to identify those immediate business drivers as to provoke debate amongst the professional and academic community.Findings: Shared understanding on business drivers to adopt BIM for managing the design and construction process of building projects raging from small commercial to high‐rise.Originality/value: The originality of the research reported in this paper is that it breaks from a proliferating series of articles on BIM as industry “aspiration” and as a “marketing” statement. The elicited drivers for BIM underwent industry, academic and peer validation.

20 November 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
RERuwini Edirisinghe
Ruwini Edirisinghe
Kerry Anne LondonKerry Anne London
Kerry Anne London
PKPushpitha Kalutara
Pushpitha Kalutara
Guillermo Aranda-MenaGuillermo Aranda-Mena
Guillermo Aranda-Mena
Purpose: Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended to support the entire project life-cycle: the design and construction phases, and also facility management (FM). However, BIM-enabled FM remains in its infancy and has not yet reached its full potential. The purpose of this paper is to identify major aspects of BIM in order to derive a fully BIM-enabled FM process.Design/methodology/approach: In total, 207 papers were classified into main and subordinate research areas for quantitative analysis. These findings were then used to conceptualise a BIM-enabled FM framework grounded by innovation diffusion theory for adoption, and for determining the path of future research.Findings: Through an extensive literature review, the paper summarises many benefits and challenges. Major aspects of BIM are identified in order to describe a BIM-enabled FM implementation process grounded by innovation diffusion theory. The major research areas of the proposed framework include: planning and guidelines; value realisation; internal leadership and knowledge; procurement; FM; specific application areas; data capture techniques; data integration; knowledge management; and legal and policy impact. Each element is detailed and is supported by literature. Finally, gaps are highlighted for investigation in future research.Originality/value: This paper systematically classifies and evaluates the existing research, thus contributing to the achievement of the ultimate vision of BIM-enabled FM. The proposed framework informs facility managers, and the BIM-enabled FM implementation process. Further, the holistic survey identifies gaps in the body of knowledge, revealing avenues for future research.

1 December 2017 in Automation in Construction
Verified
Journal Article
Closed access
Mehrdad ArashpourMehrdad Arashpour
Mehrdad Arashpour
Yu BaiYu Bai
Yu Bai
Guillermo Aranda-MenaGuillermo Aranda-Mena
Guillermo Aranda-Mena
ABAlireza Bab-Hadiashar
Alireza Bab-Hadiashar
RHReza Hosseini
Reza Hosseini
PKPushpitha Kalutara
Pushpitha Kalutara

1 April 2013 in Journal of Management in Engineering
Verified
Journal Article
Closed access
RSReid Robert Senescu
Reid Robert Senescu
Guillermo Aranda-MenaGuillermo Aranda-Mena
Guillermo Aranda-Mena
JHJohn Riker Haymaker
John Riker Haymaker
The architecture, engineering, and construction (AEC) industry delivers increasingly complex projects but struggles to leverage information technology to facilitate communication on these projects. To begin to address this challenge, the AEC project information management research field needs methods to assess communication, complexity, and their relationships. First, the authors apply complexity and virtual design and construction research to contribute a method for assessing product, organization, and process (POP) complexity. Second, through project team interviews, the authors contribute a communication assessment method to assess collaboration within projects, sharing of information between projects, and understanding of information generated across the firm or industry. Applying the two assessment methods to case studies, the authors validate the applicability of the methods to the AEC industry and propose a trend between increased POP complexity and increased communication challenges. The t...

30 June 2021 in Project Management Journal
Verified
Journal Article
Closed access
PDF file
JMJuri Matinheikki
Juri Matinheikki
NNNader Naderpajouh
Nader Naderpajouh
Guillermo Aranda-MenaGuillermo Aranda-Mena
Guillermo Aranda-Mena
SJSajani Jayasuriya
Sajani Jayasuriya
PTPauline Teo
Pauline Teo
Public–private partnerships (PPPs) must achieve legitimacy in the form of social acceptance from diverse audiences such as politicians, government agencies, private contractors, interest groups, and the general public. To advance understanding of such delicate balancing among multiple reference audiences, we adopt the lens of institutional theory to illustrate that PPPs inherently exhibit strong institutional complexity due to the presence of multiple institutional logics, making them organizationally challenging to manage. Our theoretical contribution includes the development of a set of propositions to form a conceptual model to explain not only why and how PPPs exhibit institutional complexity, but also how to respond to it through logic by combining strategies such as organizational hybridization.

24 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
AAAlireza Ahankoob
Alireza Ahankoob
BABehzad Abbasnejad
Behzad Abbasnejad
Guillermo Aranda-MenaGuillermo Aranda-Mena
Guillermo Aranda-Mena
The architecture, engineering, and construction (AEC) industry is experiencing significant digital transformation, creating a critical need to understand how future professionals perceive and accept emerging technologies. This study applies the Technology Acceptance Model (TAM) to investigate undergraduate construction students’ perceptions of Building Information Modelling (BIM) and examines how these factors influence their views on BIM applications. Using an exploratory mixed-methods approach, we analysed 773 responses from students at an Australian university across AEC disciplines, with 607 providing substantive qualitative feedback. Qualitative thematic analysis provided rich contextual understanding of student perspectives, while quantitative analysis revealed pattern frequencies across disciplines. Findings showed that perceived usefulness (PU) (37.7%) and attitude toward using (ATU) (68.4%) dominated student responses, while perceived ease of use (PEOU) (6.9%) received less attention. Productivity benefits (15.3%) and increased accuracy (7.9%) emerged as primary usefulness drivers. Disciplinary differences were significant, with Civil Engineering students emphasising design validation aspects and Construction Management students focusing on project delivery benefits of BIM. Notably, students exhibited sophisticated ambivalence, recognising BIM’s professional value while expressing concerns regarding the steep learning curve, especially when its adoption is coupled with the integration of emerging technologies such as artificial intelligence. This study contributes to the existing knowledge by: (1) documenting the current state of student perceptions in BIM education; and (2) revealing the complex interplay between technological enthusiasm and socio-professional concerns across both educational and industry settings. These findings provide evidence-based guidance for developing BIM curricula that address both socio-technical competencies and student perceptions, helping bridge the gap between educational outcomes and students’ understanding of industry requirements.