Jun Zhang

Dr. Jun Zhang


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2019 in Energies
Verified
Journal Article
Open access
PDF file
JZJun Zhang
Jun Zhang
ZDZhong Denghua
Zhong Denghua
MZMengqi Zhao
Mengqi Zhao
JYJia Yu
Jia Yu
FLFei Lv
Fei Lv
Rockfill dams are among the most complex, significant, and costly infrastructure projects of great national importance. A key issue in their design is the construction stage and zone optimization. However, a detailed flow shop construction scheme that considers the opinions of decision makers cannot be obtained using the current rock-fill dam construction stage and zone optimization methods, and the robustness and efficiency of existing construction stage and zone optimization approaches are not sufficient. This research presents a construction stage and zone optimization model based on a data-driven analytical hierarchy process extended by D numbers (D-AHP) and an enhanced whale optimization algorithm (EWOA). The flow shop construction scheme is optimized by presenting an automatic flow shop construction scheme multi-criteria decision making (MCDM) method, which integrates the data-driven D-AHP with an improved construction simulation of a high rockfill dam (CSHRD). The EWOA, which uses Levy flight to improve the robustness and efficiency of the whale optimization algorithm (WOA), is adopted for optimization. This proposed model is implemented to optimize the construction stages and zones while obtaining a preferable flow shop construction scheme. The effectiveness and advantages of the model are proven by an example of a large-scale rockfill dam.

5 February 2019 in Energies
Verified
Journal Article
Open access
PDF file
XWXiaoling Wang
Xiaoling Wang
HYHongling Yu
Hongling Yu
PLPeng Lv
Peng Lv
CWCheng Wang
Cheng Wang
JZJun Zhang
Jun Zhang
JYJia Yu
Jia Yu
As an important infrastructure project, the concrete gravity dam plays an extremely important role in hydropower generation, irrigation, flood control, and other aspects. Seepage is an important factor affecting the stability of concrete gravity dams. Seepage safety assessment is of great significance to the safe operation of the dams. However, the existing seepage safety assessment models are not dynamic, and the correlation among indicators is often neglected and the overall seepage safety of the concrete gravity dams has not been considered. To solve these problems, this research proposes a dynamic matter-element extension (D-MEE) model. First, the D-MEE model is established through adroit integration of the matter-element extension (MEE) model and functional data analysis (FDA). Second, a dynamic criteria importance through the intercriteria correlation (D-CRITIC) method that can effectively consider the correlation among indicators is proposed to determine the weights. Third, the influence of different dam blocks on the overall seepage safety status is considered by constructing a spatial weight matrix. Finally, the proposed method is applied to the concrete gravity dam X in southwest China. The results show that the proposed method is effective and superior to the existing evaluation methods of seepage safety.

2 January 2020 in Energies
Verified
Journal Article
Open access
PDF file
MZMengqi Zhao
Mengqi Zhao
XWXiaoling Wang
Xiaoling Wang
JYJia Yu
Jia Yu
LBLei Bi
Lei Bi
YXYao Xiao
Yao Xiao
JZJun Zhang
Jun Zhang
Construction duration and schedule robustness are of great importance to ensure efficient construction. However, the current literature has neglected the importance of schedule robustness. Relatively little attention has been paid to schedule robustness via deviation of an activity’s starting time, which does not consider schedule robustness via structural deviation caused by the logical relationships among activities. This leads to a possibility of deviation between the planned schedule and the actual situation. Thus, an optimization model of construction duration and schedule robustness is proposed to solve this problem. Firstly, duration and two robustness criteria including starting time deviation and structural deviation were selected as the optimization objectives. Secondly, critical chain method and starting time criticality (STC) method were adopted to allocate buffers to the schedule in order to generate alternative schedules for optimization. Thirdly, hybrid grey wolf optimizer with sine cosine algorithm (HGWOSCA) was proposed to solve the optimization model. The movement directions and speed of grey wolf optimizer (GWO) was improved by sine cosine algorithm (SCA) so that the algorithm’s performance of convergence, diversity, accuracy, and distribution improved. Finally, an underground power station in China was used for a case study, by which the applicability and advantages of the proposed model were proved.

4 September 2024 in Structures
Verified
Journal Article
Closed access
LWLei Wang
Lei Wang
XWXiaoling Wang
Xiaoling Wang
JZJun Zhang
Jun Zhang
JWJiajun Wang
Jiajun Wang
HYHongling Yu
Hongling Yu

10 October 2025 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
ZDZhouquan Dong
Zhouquan Dong
XWXiaoling Wang
Xiaoling Wang
JZJun Zhang
Jun Zhang
PYPeng Yu
Peng Yu
ZCZhijian Cai
Zhijian Cai

15 July 2025 in ISA Transactions
Verified
Journal Article
Closed access
WLWeiwei Lin
Weiwei Lin
JWJiajun Wang
Jiajun Wang
XWXiaoling Wang
Xiaoling Wang
JZJun Zhang
Jun Zhang
HGHaojun Gao
Haojun Gao